Loading...
HomeMy WebLinkAbout0152047 - Plumbing (cross connection) CITY OF OSHKOSH No 152047 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 950 SIEWERT TRL Owner CITY OF OSHKOSH Contractor D.R. HANSEN PLBG. Create Date 08/30/2012 Category 440-Industrial-Interior Plan Inspector Rich Wood Bathtub Clothes Wshr Classrm Sink Shower Surgeons Sink Roof Drain Lndry Tray Exam Sink Sterilizer Deduct Sewer Meters Whirlpool Soda Disp Wtr Sewer Mtrs p Sump Pump F Prep Sink RPZ Valve Coffee Maker Lavatory San Sump/Pump Flr/Wst Sink Mis Usage Mtrs Bide Toilet Hand Bidet Site Drain Water Softner W Fx Fixtures Sink Urinal Fixtures Kit Sink Standp Rec Wait St. Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dishwasher Dip Well Comm Ice Maker Local Waste Scuiry Sink Drink Ftn Floor Drain Bar Sink Int Grease Trap Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Sham Sink P Catch Basin Eye Wash Statn Water Heater Use/Nature Cross connection orders by Hydro Design. City owned building waived fees. of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# 1110350000 Valuation $500.00 Plan Approval $0.00 Permit Fees Issued B Y $0.00 ❑ Permit Voided Date 08/30/2012 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 55 KNAPP ST OSHKOSH WI 54902 -3448 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ............