Loading...
HomeMy WebLinkAbout0151934 - Building (garage chute) CITY OF OSHKOSH No 151934 OSHKOSH COMMERCIAL BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 522 530 N MAIN ST Create Date 08/15/2012 Project Garbage chute/shaft enclosure Project Number 0 Owner OSHKOSH HOUSING AUTHORITY Plan Contractor OWNER Inspector John Zarate Designer Category 132-Multi-Family Alterations Type of Plan Zoning C-3D0 Square Footage Major Occ Const Class Fire Protection 0 Sprinkled 0 Unsprinkled I Sprinkler Design Occupancy Permit Not Required Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 ❑ Projection I Canopies Signs Use/Nature of Work Comm/Multi family/Garbage chute shaft enclosure* All work shall comply with applicable code sections for shaft enclosure. **check#121489 HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valua' n 4,000.00 Plan Approval $50.00 Permit Fee Paid $46.00 Park Dedication $0.00 Issued By: Date 08/24/2012 Final/O.P. 00/00/0000 ❑ Permit Voided 1 Parcel Id#0401220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read an nderstand - - ore mentioned information. Signature ( 4{,e, Date 8 Z '/ Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.