HomeMy WebLinkAbout0151857 - Building (remove shingles) CITY OF OSHKOSH No 151857
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1512 GRAHAM AVE Owner RICHARD A LENZ Create Date 08/21/2012
Designer Contractor PEPPLER REMODELING
Inspector Nicole Krahn
Category 041 -Residential Roofing Plan
Type • Building O Sign J Canopy 0 Fence O Raze
Zoning R-2 Class of Const: Size
Unfinished/Basement Sq. Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq. Ft. Bedrooms Stories Canopies
Garage Sq. Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier O Other
O Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature SFR/Re-roofing'to include removing and replacing existing asphalt shingles. No structural work.
of Work
1
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $5,000.00 Plan Approval $0.00 Permit Fee Paid $53.00 Park Dedication $0.00
__ ---- - ------._.__-----
Issued By: Date 08/21/2012 Final/O.P. 00/00/0000
❑ Permit Voided Parcel Id# 1600880200
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Osh ; has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this per pplicatios ith' an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to se - any nec- provals before starting such activity.
I have read and, .er t1 - or entioned information.
Signature TL 114 Date x i 4//___a.
Agent/Owner
Address W2380 OUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920-361-7731
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing, Service, Final, etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.