Loading...
HomeMy WebLinkAbout0151843-Electric CITY OF OSHKOSH No 151843 OSHKOSH ELECTRIC PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 2854 FOND DU LAC RD Owner BRYAN/SARA COOK Create Date 08/16/2012 Contractor HOMEOWNER Category 612-Residential-Single Family Addition/R Plan Inspector Adam Krause Service p New • Change Q Temp N/A 1 Type O Overhead 0 Underground Volts 240 Circuits 42 Luminaires 25 Amps 200 Switches 21 Receptacles 40 Appliances I Use/Nature of SFR/Electrical in association with the whole house remodel. The service is also being upgraded from 100 to 200. **check#10034 Work Fees: Valu 00.00 Plan Approval $0.00 Permit Fee Paid $77.00 ,;+,� $2 p �� V_) Date 8/21/2012 Issued By: H Permit Voided Parcel Id# 1413341300 The undersigned,in applying for an Electric Permit to perform electrical work within a single family home,owned and occupied as the principle residence by the undersigned,hereby acknowledges per City Municipal Code Section 11-22,that other individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the City of Oshkosh to perform said work. In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure an ssary approvals before starting such activity. ,l✓. a QSt1 Signature Date S/al Agent/Owner Address OSHKOSH WI 5490- 7225 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.