HomeMy WebLinkAbout0151843-Electric CITY OF OSHKOSH No 151843
OSHKOSH ELECTRIC PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 2854 FOND DU LAC RD
Owner BRYAN/SARA COOK Create Date 08/16/2012
Contractor HOMEOWNER Category 612-Residential-Single Family Addition/R Plan
Inspector Adam Krause
Service p New • Change Q Temp
N/A 1 Type O Overhead 0 Underground
Volts
240 Circuits 42 Luminaires 25
Amps 200 Switches 21 Receptacles 40
Appliances
I
Use/Nature of SFR/Electrical in association with the whole house remodel. The service is also being upgraded from 100 to 200. **check#10034
Work
Fees: Valu 00.00 Plan Approval $0.00 Permit Fee Paid $77.00
,;+,� $2 p
�� V_) Date 8/21/2012
Issued By:
H Permit Voided Parcel Id# 1413341300
The undersigned,in applying for an Electric Permit to perform electrical work within a single family home,owned and occupied
as the principle residence by the undersigned,hereby acknowledges per City Municipal Code Section 11-22,that other
individuals may not be employed to assist with the work described in this permit unless said individuals are licensed by the
City of Oshkosh to perform said work.
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure an ssary approvals before starting such activity.
,l✓. a QSt1
Signature Date S/al
Agent/Owner
Address OSHKOSH WI 5490- 7225 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.