HomeMy WebLinkAbout0151800-Plumbing (replace sewer lateral) CITY OF OSHKOSH
OSHKOSH No 151800
PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1017 MERRITT AVE
- ---------_-- ----- - Owner TERRY L KRAUSE
Contractor WALTER R SCHMID JR - --- Create Date 08/17/2012
Category ------
Inspector
- - 9 rY 401 -Residential Exterior(laterals) Plan
Bathtub Clothes Wshr Classrm Sink
Bathtub Surgeons Sink Roof Drain
Lndry Tray Exam Sink -- - _-__- Deduct Meters
Sterilizer Whirlpool ---- Soda Disp Wtr Sewer Mtrs
Sump Pump F Prep Sink RPZ Valve
_ Coffee Maker ---
Lavatory Wtr Usage Mtrs
ry San Sump/Pump Flr/Wst Sink Bidet
---- Site Drain
Toilet Water Softner Hand Sink Urinal F u.
---
Fixtures
Lab Sink -----
Kit Sink Standp Rec --_ Wait.St.
--- - Beer Ta
Disposal Gar Drain Plaster --- p Ice Chest
aster Sink Dip Well Comm Ice Maker
Dishwasher Local Waste — - __
Sculry Sink Drink Ftn Int Grease Trap
Floor Drain Bar Sink Sery Sink
Hose Bibb -- _-_-_- Wash Ftn Ext Grease Trap
Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn
Water Heater - —
Use/Nature 'SFR/Replace sewer lateral*from sidewalk to the house.
of Work
1
Size Material Type # Conn.Type
Sanitary Sewer 6" Plastic Lateral
1 Repair
Storm Sewer
Water Service
Parcel Id#
Valuation $1,400.00 Plan A 1100680000
.00 Approval $0.00 Permit Fees $50.00 ❑ Permit Voided 1
Issued By
C)....". —
1 Date 08/17/2012
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s)rand to secure any ces ary appro Is before starting such activity.
Signature X W
r Date
Agent/Owner 0 /r7 "L
Address 7821 SWISS RD Oshkosh
Osh WI 54902 -0000 Telephone Number 688-2496
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing,Service, Final, etc.),Access into Building if Secure (how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.