HomeMy WebLinkAbout0151668 - VOID (D CITY OF OSHKOSH
OSHKOSH No 151668
PLUMBING PERMIT -APPLICATION AND RECORD V 0 I D
ON THE WATER
Job Address 49 BOWEN ST _ Owner REBECCA L ROGERS
Contractor QUANDT PLUMBING LLC Create Date 08/13/2012
Category 412-Res-Interior(New/Relocated Fixtures) Plan
Inspector Jerry Fabisch
Bathtub Clothes Wshr Classrm Sink
howur Surgeons Sink Roof Drain Deduct Meters
Lndry Tray Exam Sink
Whirlpool S Sterilizer Soda Disp Wtr Sewer Mtrs
p Sump Pump 1 F Prep Sink RPZ Valve
Lavatory San Sump/Pump Coffee Maker Ws Usage Mtrs
P p FINWst Sink Bidet
Toilet Water Softner Site Drain Fixtures
Hand Sink Urinal
Kit Sink Standp Rec Wait.St. Fixtures
Lab Sink _ Beer Tap Ice Chest
Disposal Gar Drain Plaster Sink
Dishwasher Dip Well Comm Ice Maker
Local Waste Sculry Sink Drink Ftn
Floor Drain Bar Sink Int Grease Trap
Sery Sink Wash Ftn Ext Grease Trap
Hose Bibb Breakrm Sink Sham Sink
Water Heater p Catch Basin Eye Wash Statn
Use/Nature SFR/Installing new sump pump in basemet.
of Work
Size Material Type #
Sanitary Sewer Conn.Type
Storm Sewer
Water Service
Parcel Id#
Valuation $400.00 Plan A 0806010000
pproval $0.00 Permit Fees $25.00
Issued B Y Q Permit Voided I VOID VOID VOID
Date 08/13/2012
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the
easement holder(s)and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address 1010 WYLDE OAK DRIVE Oshkosh WI 54904 -0000 Telephone Number 920-420-5185
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.