Loading...
HomeMy WebLinkAbout0151668 - VOID (D CITY OF OSHKOSH OSHKOSH No 151668 PLUMBING PERMIT -APPLICATION AND RECORD V 0 I D ON THE WATER Job Address 49 BOWEN ST _ Owner REBECCA L ROGERS Contractor QUANDT PLUMBING LLC Create Date 08/13/2012 Category 412-Res-Interior(New/Relocated Fixtures) Plan Inspector Jerry Fabisch Bathtub Clothes Wshr Classrm Sink howur Surgeons Sink Roof Drain Deduct Meters Lndry Tray Exam Sink Whirlpool S Sterilizer Soda Disp Wtr Sewer Mtrs p Sump Pump 1 F Prep Sink RPZ Valve Lavatory San Sump/Pump Coffee Maker Ws Usage Mtrs P p FINWst Sink Bidet Toilet Water Softner Site Drain Fixtures Hand Sink Urinal Kit Sink Standp Rec Wait.St. Fixtures Lab Sink _ Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dishwasher Dip Well Comm Ice Maker Local Waste Sculry Sink Drink Ftn Floor Drain Bar Sink Int Grease Trap Sery Sink Wash Ftn Ext Grease Trap Hose Bibb Breakrm Sink Sham Sink Water Heater p Catch Basin Eye Wash Statn Use/Nature SFR/Installing new sump pump in basemet. of Work Size Material Type # Sanitary Sewer Conn.Type Storm Sewer Water Service Parcel Id# Valuation $400.00 Plan A 0806010000 pproval $0.00 Permit Fees $25.00 Issued B Y Q Permit Voided I VOID VOID VOID Date 08/13/2012 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1010 WYLDE OAK DRIVE Oshkosh WI 54904 -0000 Telephone Number 920-420-5185 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.