HomeMy WebLinkAbout0151712 - building (siding) CITY OF OSHKOSH No 151712
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 1235 W 11TH AVE Owner PAMELA YOUNGWIRTH
Create Date 08/15/2012
Designer
Contractor LUECKS HOME IMPROVEMENT INC
Inspector Nicole Krahn
Category 042-Residential Siding
Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning R-1 Class of Const:
Size
Unfinished/Basement Sq.Ft. Rooms Height 9 Ft. Projection 1
Finished/Living Sq.Ft. Bedrooms
Stories Canopies
Garage Sq.Ft. Baths
Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures
0
Use/Nature SFR/REPLACE ALUMINUM WITH VINYL SIDING ON THE HOUSE AND ATTACHED GARAGE, NO STRUCTURAL CHANGES
of Work **debit acct
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $7,200.00 Plan Approval $0.00 Permit Fee Paid
Lk) $74.00 Park Dedication $0.00
(-,. 1Vy��
Issued By: ,:JC
Date 08/15/2012 Final/O.P. 00/00/0000
❑ Permit Voided I Parcel Id# 1308210000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature
Date
Agent/Owner
Address 706 S MAIN STREET OSHKOSH WI 54902 - 6084 Telephone Number 235-0106
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
`--',L.J J. cJaLPL T1 DTI.' NPlrin .-I,-,-- r 1