Loading...
HomeMy WebLinkAbout0151659 - Plumbing (install fixtures) CITY OF OSHKOSH No 151659 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 3773 GLENBROOK LN Owner JEFFREY BEYER/DANENE KIMMEL BEYER Create Date 08/13/2012 Contractor OWNER Category 412-Res-Interior(New/Relocated Fixtures) Plan Inspector Jerry Fabisch Bathtub 1 Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs Lavatory San Sump/Pump Flr/Wst Sink Bidet Site Drain Misc. Toilet _ 1 Water Softner Hand Sink Urinal Wait.St. Fixtures Kit Sink Standp Rec Lab Sink Beer Tap Ice Chest Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Trap Floor Drain Bar Sink Sery Sink Wash Ftn Ext Grease Trap Hose Bibb _ Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn Water Heater Use/Nature SFR/installing fixtures due to remodeling of Work Size Material Type # Conn.Type Sanitary Sewer Storm Sewer Water Service Parcel Id# Valuation $500.00 Plan Approval $0.00 Permit Fees $25.00 ❑ Permit Voided Issued By ..^F` Date 08/13/2012 In the performance of this work,I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement h• .- - and to secure necessary ap als before starting such activity. Signature _%,(.-__ try iv....._ Date - ' Agent/Owner Address 1 10-t-t\k\K 0 jWAC51,..)__ WI 54901 -0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.