Loading...
HomeMy WebLinkAbout0151518 - Building (windows) CITY OF OSHKOSH No 151518 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1640 S OAKWOOD RD Owner TERRY W BLASKE Create Date 08/03/2012 Designer Contractor SEARS HOME IMPROVEMENTS Inspector Nicole Krahn Plan Category 040-Windows Type • Building O Sign O Canopy 0 Fence O Raze Zoning R-1 Class of Const: Size ht Ft. El Projection Unfinished/Basement Sq.Ft. Rooms Hei g Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs - Foundation • Poured Concrete 0 Floating Slab 0 Pier O Other 0 Concrete Block O Post 0 Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required #Dwelling Park Dedication Not Required g Units 0 #Structures 0 Use/Nature SFR/REPLACE(8)WINDOWS AND(1)PATIO DOOR(SAME SIZES AND LOCATIONS),NO STRUCTURAL CHANGES **check of Work #2105 HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation 14,348.00 Plan Approval $0.00 Permit Fee Paid $118.00 Park Dedication $0.00 Issued By: 57-n Date 08/03/2012 Final/O.P. 00/00/0000 ❑ Permit Voided I Parcel Id# 1318650000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and to secure any necessary approvals before starting such activity. I have read and understand the afore mentioned information. Date Signature Agent/Owner Address 13040 W LISBON RD BROOKFIELD WI 53005 - 0000 Telephone Number 630-832-4049 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.