HomeMy WebLinkAbout0151518 - Building (windows) CITY OF OSHKOSH No 151518
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1640 S OAKWOOD RD
Owner TERRY W BLASKE Create Date 08/03/2012
Designer
Contractor SEARS HOME IMPROVEMENTS
Inspector Nicole Krahn
Plan
Category 040-Windows
Type • Building O Sign O Canopy 0 Fence O Raze
Zoning R-1
Class of Const: Size
ht Ft. El Projection
Unfinished/Basement Sq.Ft. Rooms Hei g
Finished/Living Sq.Ft. Bedrooms
Stories Canopies
Garage Sq.Ft. Baths Signs
-
Foundation • Poured Concrete 0 Floating Slab 0 Pier O Other
0 Concrete Block O Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
#Dwelling Park Dedication Not Required g Units 0 #Structures 0
Use/Nature SFR/REPLACE(8)WINDOWS AND(1)PATIO DOOR(SAME SIZES AND LOCATIONS),NO STRUCTURAL CHANGES **check
of Work #2105
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation 14,348.00 Plan Approval $0.00 Permit Fee Paid $118.00 Park Dedication $0.00
Issued By: 57-n Date 08/03/2012 Final/O.P. 00/00/0000
❑ Permit Voided I Parcel Id# 1318650000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Date
Signature
Agent/Owner
Address 13040 W LISBON RD BROOKFIELD WI 53005 - 0000 Telephone Number 630-832-4049
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.