Loading...
HomeMy WebLinkAbout0151469 - building (roof) (F1) CITY OF OSHKOSH No 151469 OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 845 WISCONSIN ST Owner PINE MOUNTAIN INVESTMENTS LLC Create Date 08/01/2012 Designer Contractor PEPPLER REMODELING Inspector Tom Spierowski Category 041 -Residential Roofing Plan Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning R-5 __ Class of Const: Size Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Pier 0 Other 0 Concrete Block 0 Post 0 Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature 5FR/Re-roof"To include removal and replacement of shingles and possibly the sheathing. No structural work. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation ,$6,700.00 Plan Approval $0.00 Permit Fee Paid $67.00 Park Dedication $0.00 Issued By:Din /V-�✓1 Date 08/02/2012 Final/O.P. 00/00/0000 ❑ Permit Voided Parcel Id#0502440000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshko has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this per ' -,plication i hin n easement,the City strongly urges the permit applicant to contact the easement holder(s)and to se - -ny nece sa royals before starting such activity. I have read and u,:-rst d he f e ntioned information. Signature / c- Date Agent/Owner V2./42.___ Address W2380 COUNTY Q BERLIN WI 54923 - 0000 Telephone Number 920-361-7731 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.