HomeMy WebLinkAbout2012-Plumbing (new water svc) CITY OF OSHKOSH No 151477
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 112 VIOLAAVE Owner OSH AREA SCHL DIST OAKLAWN Create Date 08/02/2012
Contractor JT SCHMIDT PLUMBING INC Category 444-Commercial-Exterior Laterals Plan
Inspector Jerry Fabisch
Bathtub Clothes Wshr Classrm Sink Surgeons Sink Roof Drain Deduct Meters
Shower Lndry Tray Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs
Whirlpool Sump Pump F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs
Lavatory San Sump/Pump Flr/Wst Sink Bidet Site Drain Misc.
Toilet Water Softner Hand Sink Urinal Wait.St. Fixtures
Kit Sink Standp Rec Lab Sink Beer Tap Ice Chest
Disposal Gar Drain Plaster Sink Dip Well Comm Ice Maker
Dishwasher Local Waste Sculry Sink Drink Ftn Int Grease Trap
Floor Drain Bar Sink Sery Sink _ Wash Ftn _ Ext Grease Trap
Hose Bibb Breakrm Sink Shamp Sink Catch Basin Eye Wash Statn
Water Heater
Use/Nature COMM/New water service feeding different building that is not being knocked down until after the new school is built/
of Work this way they can still run the school without shutting it down
I
Size Material Type # Conn.Type
Sanitary Sewer
Storm Sewer
Water Service 2" Plastic Lateral 1 New
Parcel Id#
1514850000
Valuation $2,000.00 Plan Approval $0.00 Permit Fees $50.00 ❑ Permit Voided I
Issued By Date 08/02/2012
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the
easement holder(s)and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 419 S WASHINGTON ST COMBINED LOCK;WI 54113 - 1049 Telephone Number (920)788-7314
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection (i.e. Footing, Service, Final,etc.),Access into Building if Secure (how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.