Loading...
HomeMy WebLinkAbout0151271 - Plumbing (install water heater)0 OSHKOSH ON THE WATER Job Address 3760 PARKVIEW CT Contractor SAMMONS PLUMBING Inspector Jerry Fabisch Bathtub Clothes Wshr Shower Lndry Tray Whirlpool Sump Pump Lavatory San Sump /Pump Toilet Water Softner Kit Sink Standp Rec Disposal Gar Drain Dishwasher Local Waste Floor Drain Bar Sink Hose Bibb Breakrm Sink Water Heater 1 Use /Nature �SFR / I of Work Valuation Issued By CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner TIM M /CHERYLAMCBRAIR Category 411 - Residential -Water Heaters No 151271 Create Date 07/18/2012 Plan Classrm Sink Surgeons Sink Roof Drain Deduct Meters Exam Sink Sterilizer Soda Disp Wtr Sewer Mtrs F Prep Sink RPZ Valve Coffee Maker Wtr Usage Mtrs FIr/Wst Sink Bidet Site Drain Misc. Hand Sink Urinal Wait. St. Fixtures Lab Sink Beer Tap Ice Chest Plaster Sink Dip Well Comm Ice Maker Sculry Sink Drink Ftn Int Grease Trap Sery Sink Wash Ftn Ext Grease Trap Shamp Sink Catch Basin Eye Wash Statn HEATER "'debit acct Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service '00 Plan Approval $0.00 Permit Fees $25.00 F-] Permit Voided W In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 522 W. MURDOCK AVE OSHKOSH Parcel Id # 1533090000 Date 07/18/2012 WI 54901 -2298 Telephone Number (920) 231 -9880 i o scneauie inspections please call the Inspection Request line at 236 -5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.