HomeMy WebLinkAbout0151241 - Building (windows) CITY OF OSHKOSH No 151241
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD VOID
ON THE WATER
Job Address 622 E PARKWAY AVE Owner CODY TANDERSON/MELINDA L DORN Create Date 07/17/2012
Designer Contractor FFD NATIONAL LLC
Inspector John Zarate
Category 040-Residential Windows Plan
Type • Building 0 Sign 0 Canopy 0 Fence 0 Raze
Zoning C-1 Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation • Poured Concrete 0 Floating Slab 0 Pier 0 Other
0 Concrete Block 0 Post 0 Treated Wood
Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Not Required
Park Dedication Not Required #Dwelling Units 0 #Structures 0
Use/Nature SFR/INSTALL(3)WINDOW REPLACEMENTS(SAMES SIZES&LOCATIONS), NO STRUCUTRAL CHANGES **check#104852
of Work
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $1,766.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00
Issued By: Date 07/17/2012 Final/O.P. 00/00/0000
0 Permit Voided JOB CANCELLED Parcel Id#0405810000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement
holder(s)and to secure any necessary approvals before starting such activity.
I have read and understand the afore mentioned information.
Signature Date
Agent/Owner
Address 1125 TUCKAWAY LN STE C MENASHA WI 54952 - 1776 Telephone Number (920)968-1480
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of
Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone
Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.