HomeMy WebLinkAbout06. 12-352 JULY 10, 2012 12-352 RESOLUTION (CARRIED___7-0_____LOST________LAID OVER________WITHDRAWN________) PURPOSE: APPROVAL OF VARIANCE FOR CLOSURE OF MAIN STREET AT TH 15 AVENUE / PTS CONTRACTORS INC. FOR LOCAL CONCRETE PAVING PROJECT / AUGUST 2012 INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, PTS Contractors, Inc. is performing work replacing sanitary sewer, th storm sewer, and water main facilities on West 15 Avenue at its intersection with South Main Street/State Highway 45; and WHEREAS, PTS Contractors, Inc. requests a variance to Section 25-23 of the Municipal Code which requires State, County, and certain other roads to maintain a passageway open to traffic during a course of excavation work; and th WHEREAS, the intersection of South Main Street/State Highway 45 and West 15 Avenue is required to retain a passageway open to traffic during construction; and WHEREAS, maintaining an open passageway for traffic while installing utilities at th the intersection of South Main Street/State Highway 45 and West 15 Avenue would be unsafe and impractical for both PTS Contractors, Inc. and the general public; and WHEREAS, the Wisconsin Department of Transportation has approved the th proposed detour of South Main Street/Highway 45 at its intersection with West 15 Avenue. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that a variance from Section 25-23 of the Oshkosh Municipal Code is granted allowing the closure of the intersection of South Main Street/State Highway 45 and West th 15 Street for a period not to exceed 14 consecutive calendar days at a time after July 29, 2012 to be determined by construction schedules during for the Southside Concrete Paving and Utility Project. (..11---07) OfHKOJH Q ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: July 5, 2012 RE: Closure of the Intersection of West 15th Avenue and South Main Street (Highway 45) Required because of the Southside Concrete Paving and Utility Project BACKGROUND During installation of the sanitary sewer, storm sewer, and water main on West 15th Avenue, the original contract specifications required that for the six weeks of construction, traffic must be maintained in both the north and south directions. Due to the locations and depths of the utilities, the contractor believes maintaining traffic while installing those utilities would be unsafe and impractical for both them and the general public. In order to maintain traffic, a flag man would need to be utilized and only one lane of traffic would be able to remain open. As an alternative, the contractor has requested the ability to close the intersection of West 15th Avenue and South Main Street for 14 calendar days. The contractor has discussed this option with the surrounding property owners. The proposed detour route is 9th Avenue to Oregon Street to 24th Avenue. The detour route is a truck route. The Wisconsin Department of Transportation has approved the proposed detour of Highway 45. ANALYSIS In order to maintain through traffic at the intersection of West 15th Avenue and South Main Street, a single temporary traffic lane would be needed. Flaggers would regularly need to stop traffic to allow the alternate side of the road to proceed and to allow construction equipment to maneuver. Additionally, vehicles would be passing very close to the construction workers and equipment, increasing the chances of an accident. The contractor is concerned about this situation from a safety standpoint. Closing the intersection for 14 days will expedite the construction through the intersection and allow traffic to return to a more normal flow faster and is also preferred by most of the businesses that would be affected by the intersection closure. FISCAL IMPACT No additional costs to the City are proposed due to the road closure. The contractor shall be responsible for all additional costs of traffic control. RECOMMENDATION I recommend approval of the proposed closure of the intersection of West 15th Avenue and South Main Street. Approved: ......-/ ;;kielet— .4.iran,A. Rohloff / - City Manager SMG/tIt 1:1Engineering112-04 Conc Paving&Utili-South 1 Project_Information\CorrespondencelMemo112-04 W 15th&Main St Intersection Closure CC memo_7-5-12.docx PTS CONTRACTORS INC. 4075 EATON ROAD GREEN BAY, WI 54311-9340 OFFICE (920)468-5217 FAX (920) 468-4087 June 21, 2012 City of Oshkosh ATTN: Steve Ghode 215 Church Avenue Oshkosh, WI 54903 RE: West 15th Avenue and Main Street Intersection Closure Dear Steve: PTS Contractors is requesting a complete intersection closure for the intersection of West 15th Avenue and South Main Street. The intersection will be closed for 14 calendar days and will start after the EAA Convention. The exact date will be dictated by the construction schedule of West 15th Avenue. The request is being made so PTS Contractors can install sanitary sewer, storm sewer, and water main. The locations and depths of the utilities make maintaining traffic and installing utilities unsafe and impractical for both the general public and us. The construction window for this intersection per the contract specifications was six weeks, maintaining traffic in both the north and south directions. The only way this work could be completed would be to utilize a flag man and have only one lane of traffic open. We believe that this would create major traffic back-ups in both directions and unsafe condition. We are proposing to work 12 hour days, six days a week to complete this work and get the intersection open to north-south traffic in 14 calendar days. Upon completion of the 14 calendar days, the two center lanes of South Main Street would be open on new concrete pavement. PTS Contractors will sign and post an approved detour by the Wisconsin Department of Transportation and City of Oshkosh Engineering Department at our own cost. The detour route will stay on the approved truck route and will be signed per MUTCD standards. We have talked to the businesses that will be affected by the intersection closure, and most of them would rather see the 14 calendar day closure than the six week construction window. If necessary Bob from Blended Wax said that he would be willing to discuss this option with the City. By coordinating the intersection closure of W. 15th Avenue and Nebraska Street with this intersection closure, it will allow the construction of W. 15th Avenue to continue in a timely manner and allow our crews to finish the project without delays per the contract requirement. Please contact me with any further comments or questions. %all/ A•110 01" 40,‘./to,... Mark Schleis PTS Contractors, Project Manager