Loading...
HomeMy WebLinkAbout07. 12-353 JULY 10, 2012 12-353 RESOLUTION (CARRIED__7-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 12-23 TO STRAIGHT LINE FENCE LLC FOR PERMANENT BOUNDARY FENCE INSTALLATION FOR JAMES ROAD AREA DETENTION BASIN ($15,970.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for permanent boundary fence installation for James Road Area Detention Basin; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: STRAIGHT LINE FENCE LLC 8545 County Road C Wittenberg, WI 54499 Total Bid: $15,970.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 561-2010-1799-00000 Storm Water Utility Construction in Progress OIHKOJH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: July 5, 2012 RE: Award Bid for Public Works Contract No. 12-23 Fence Contract for James Road Area Detention Basin Straight Line Fence LLC / ($15,970.00) BACKGROUND The purpose of this project is to construct a fence along some of the property lines of the land the City City acquired to build the James Road Area Detention Basin. The property lines are difficult to identify in the plowed field areas. The fence will ensure the construction of the basin does not result in trespassing onto adjacent properties and will prevent adjacent landowners from using the City property. ANALYSIS Engineering staff reviewed two bids. The low bid was received from Straight Line Fence LLC of Wittenberg, Wisconsin. The total bid is $15,970.00. FISCAL IMPACT Funding for the project is in the 2012 Capital Improvement Program. Following is a summary of the available funds and the construction costs including engineering fees. CIP Section CIP Funds Budgeted Construction Costs with Engr Storm Sewer (see Note) $6,210,000 $20,570 Totals $6,210,000 $20,570 Note: This project is budgeted as part of the James Road Area Detention Basin budget of the CIP. The CIP funds listed include the entire amount budgeted for the James Road Area Detention basin. RECOMMENDATIONS I recommend award to the low bidder, Straight Line Fence LLC, in the amount of$15,970.00. Respectfully Submitted, Approved: 4411049 Steven M. Gohde, P.E. Mark A. Rohloff Asst. Director of Public Works City Manager SMG/tIt I:\Engineering112-23 Fence Contract-James Rd Area Del Basin\Project_Information\Correspondence\Memo112-23 Memo for Bid Award_7-5-12.docx o o o o 0 0 0 o f6 tO N co' CO O N. M M M F- ER cr •t 4 c- EA N E 69 EA D co Lh ID ❑ Lo_ o C COO 0 C .O � 0 LO 669 N---- ❑ C) > T .0 n CO 0 co co CO 69-c Y co J N = W O N 2 NLL � C� U 0 0 0 0 0 0 0 0 LO LO N 0 N- O 0 LO. cm F- N N •- L EA EA r C to- () EA J o J U O) v C m 0 O 0 CCDD 0 L CC > O d (-6 d ❑ C) >, 0 Ln EA 0 Z C C 6 .0 0 L, Z J O CJ a 69 69 m U 2 c rn c c 0 to N D uJ 2 � cno�o � 0 E ° ° y = o m Tr Z c c a r < < < U' M c m -C co LL .c c a m m O = E c L,I N 4) J J 0) N ,N - CI 2 N Q ❑ F a 0 ❑ N - E Z W 00 1`C C) C W L6 N L0 a l- c ❑ N L6 N I N y U 0 4 • Q -0 J U ) Q g _ c > -0N to 0 o of Z O O 0 N t4 F- LL La- U ❑al F- O N 0 a U Q Z ~ c U � cto � E z Cr CI Li m m N u_ an d U C7 0 o C - N N N