Loading...
HomeMy WebLinkAboutPW CNT 12-16/CHG ORD 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Fax((92)236-5068 OfHKOJH ON THE WATER June 27, 2012 Mr. Dan Kalupa Four-Way Construction of WI, Inc. N8761 Forest Ridge PO Box 133 Berlin, WI 54923 Re: Change Order No. 1 Contract 12-16 Dear Mr. Kalupa: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Four-Way Construction of WI, Inc. regarding the abovementioned project. If you have any questions, please call our office at (920)236-5065. Sincerely, ci); David C. Patek Director of Public Works DCP/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney (w/copy) File (w/original) 1:\Engineering\12-16 San Sewer&Laterals-Oshkosh Ave\Project_Information\Contract Info Change Orders\12-16 Page 1 of 1 Executed CO#1 Ltr 6-27-12.docx TO: Four-Way Construction of WI, Inc. CHANGE ORDER# 1 N8761 Forest Ridge DATED: June 4, 2012 PO Box 133 Berlin, WI 54923 Your present contract with the City of Oshkosh, Contract No. 12-16, awarded April 17, 2012, is hereby amended and changed as follows: NET XXCREASE TO: SECTION I - PAVING $0.00 NET XXCREASE TO: SECTION II - STORM SEWER $0.00 NET DECREASE TO: SECTION III - SANITARY SEWER ($10,992.95) NET INCREASE TO: SECTION IV- WATER MAIN $16,921.83 NET INCREASE TO CONTRACT $5,928.88 Section I Section II Section III Section IV (Paving) (Storm) (Sanitary) (Water) Totals Bid Total $0.00 $0.00 $123,298.95 $2,825.00 $126,123.95 C.O. #1 $0.00 $0.00 ($10,992.95) $16,921.83 $5,928.88 Contract Total $0.00 $0.00 $112,306.00 $19,746.83 $132,052.83 CITY OF OSHKOSH BY: Recommended: City Man-•- .)a),d c ate �y� 1 t • Director of Public Works City Clerk Approve./-nd accepted: _4 / . A .J Con a,for I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. mptroller Approved as t,b orm: W111 A 'MI.._l. !a City Attor -y CONTRACT: 12-16 CHANGE ORDER#1 SECTION III-SANITARY SEWER ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 3000 Furnish&install 8"sanitary sewer relay, complete as Linear specified Feet 815 814.24 -0.76 $84.60 ($64.30) 3004 Furnish&install 12" sanitary sewer relay, Linear complete as specified Feet 15 7.20 -7.80 $63.25 ($493.35) 3100 Furnish&install standard sanitary MH(4'Dia.), Vertical complete as specified Feet 50 48.80 -1.20 $230.00 ($276.00) 3200 Furnish&install 8"x 4" factory wyes,complete as specified Each 2 0.00 -2.00 $60.00 ($120.00) 3210 Furnish&install 8"x 6" factory wyes, complete as specified Each 11 11.00 $95.00 3234 Furnish&install 4'/6" sanitary lateral relay, Linear complete as specified Feet 400 284.40 -115.60 $85.00 ($9,826.00) 3235 Furnish&install 4'/6" sanitary lateral riser, Linear complete as specified Feet 65 53.50 -11.50 $65.00 ($747.50) 3236 Furnish&install sanitary lateral marker balls, complete as specified Each 26 27.00 1.00 $26.20 $26.20 3238 Furnish&install sanitary lateral clay dams, complete as specified Each 13 11.00 -2.00 $60.00 ($120.00) 3304 Furnish&install connection to existing 12" main, complete as specified Each 3 1.00 -2.00 $350.00 ($700.00) SECTION III-(BID ITEMS 3000-3304)-SUB-TOTALS $26.20 ($12,347.15) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION III ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 30000 Additional equipment, labor, and materials to excavate and cap a new sanitary riser for#1823 Oshkosh Avenue, per Invoice dated 4/17/12, Lump complete as specified Sum 0.00 1.00 1.00 $1,328.00 $1,328.00 ADDITIONAL WORK: C.0.#1 -(ITEM 30000)-SUB-TOTAL $1,328.00 $0.00 NET DECREASE TO: SECTION III ($10,992.95) Page 1 of 2 CONTRACT: 12-16 CHANGE ORDER#1 SECTION IV-WATER MAIN ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 40000 Insulate existing water services,complete as specified Each 5 1.00 -4.00 $565.00 ($2,260.00) SECTION IV-(BID ITEM 40000)-SUB-TOTALS $0.00 ($2,260.00) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION IV ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 40001 Additional equipment, labor,and materials to relocate existing hydrant from existing 6-inch water main to existing 12-inch water main, including a new 6"valve and sleeve, per Invoice dated 4/20/12, Lump complete as specified Sum 0.00 1.00 1.00 $5,186.02 $5,186.02 40002 Additional equipment, labor, and materials to relay 4-inch water lateral at a deeper depth for Robbin's Restaurant;work included chlorination, pressure testing,and reconnection, per Invocie dated 4/2012, complete as Lump specified Sum 0.00 1.00 1.00 $13,995.81 $13,995.81 ADDITIONAL WORK: C.O.#1 (ITEMS 40001 -40002)-SUB-TOTAL $19,181.83 $0.00 NET INCREASE TO: SECTION IV $16,921.83 NET INCREASE TO SECTIONS I,II,III,IV $20,536.03 NET DECREASE TO SECTIONS I,II,Ill, IV ($14,607.15) NET INCREASE TO CONTRACT: $5,928.88 Page 2 of 2