Mark Schleis
PTS Contractors, Inc.
4075 Eaton Road
Green Bay, WI 54311
Re: Change Order No. 3
Contract 11-07
Dear Mr. Schleis:
Enclosed is an executed copy of Change Order No. 3 between the City of Oshkosh and PTS Contractors,
Inc. regarding the abovementioned project.
If you have any questions, please call our office at(920)236-5065.
Sincerely,
L ,Ls
David C. Patek
Director of Public Works
DCP/tlt
Enclosure: Change Order No. 3
cc: Pam Ubrig, City Clerk (w/original)
Lynn Lorenson, City Attorney (w/copy)
File (w/original)
I:\Engineering\11-07 Concrete Paving and Utilities North\Project_lnformation\Contract Info1CHANGE ORDERS 11-07 Page 1 of 1
Executed CO SO Letter 6-22-12.docx
•
TO: PTS CONTRACTORS, INC CHANGE ORDER# 3
4075 EATON ROAD DATED: May 11, 2012
GREEN SAY WI 54311
FINAL
Your present contract with the City of Oshkosh, Contract No.11-07, awarded May 24, 2011, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I - PAVING $1,728.00
NET INCREASE TO: SECTION II - STORM SEWER $1,093.13
NET INCREASE TO: SECTION III - SANITARY SEWER $0.00
NET INCREASE TO: SECTION IV- WATER MAIN $0.00
NET INCREASE TO CONTRACT $2,821.13
Section I Section II Section III Section IV
(Paving) (Storm) (Sanitary) (Water) Totals
Bid Total $1,081,034.50 $627,720.50 $504,782.75 $468,751.00 $2,682,288.75
C.O. #1 ($51,878.54) ($29,325.05) ($28,594.11) $9,444.01 ($100,353.69)
Prev.Contract Totals $1,029,155.96 $598,395.45 $476,188.64 $478,195.01 $2,581,935.06
C.O. #2 Totals $1,560.00 $75,396.00 $457.00 $0.00 $77,413.00
Contract Total $1,030,715.96 $673,791.45 $476,645.64 $478,195.01 $2,659,348.06
C.O. #3 Totals $1,728.00 $1,093.13 $0.00 $0.00 $2,821.13
Contract Total $1,032,443.96 $674,884.58 $476,645.64 $478,195.01 $2,662,169.19
CITY OF OSHKOSH
BY:
Recommended: ill City Manager
Director of Public Works ► • Al ity if rkf
Approved and accepted:
4f-4 X/ ' •
Contract
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
cge_9„.„
a`L"6mptroller
Approved as0 orm:
,�
L
City Attorney
CONTRACT:11-07 CHANGE ORDER#3
SECTION I-CONCRETE PAVING(Original Contract 11-07)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
DESCRIPTION UNIT CONTRACT CONTRACT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE
100 Pavement removal, Square
2,822.00 2,822.00 $3.25
complete as specified Yards
101 Sidewalk and driveway Square
removal,complete as Feet 36,289.80 36,289.80 $0.40
specified
102 Excavation,complete as Cubic 11,637.30 11,637.30 $8.60
specified Yards
103 7°non-reinforced concrete
pavement,including
integral curb,5"base Square 14,571.39 14,571.39 $27.60
material and grading, Yards
complete as specified
104 8"non-reinforced concrete
pavement,including Square
integral curb,6"base Yards 7,447.33 7,447.33 $31.50
material and grading,
complete as specified
105 8"concrete pavement,
HES,including integral Square
curb and 6"base material Yards 263.62 263.62 $36.00
and grading,complete as
specified
106 12"wide radius curb head, Linear
complete as specified Feet 613.60 613.60 $5.08
107 Standard 24"curb&gutter, Linear
7"(tie-in),complete as Feet 13.50 13.50 $25.40
specified
108 Standard 30"curb&gutter, Linear
7"(tie-in),complete as Feet 173.70 173.70 $21.35
specified
109 Sidewalk curb,complete as Linear
8.20 8.20 $17.30
specified Feet
110 4"concrete sidewalk, Square 19 675.80 19,675.80 $3.34
complete as specified Feet
111 6"concrete sidewalk and Square
driveway,complete as Feet 18,394.70 18,394.70 $3.66
specified
112 8"concrete sidewalk and Square
driveway,complete as Feet 3,110.40 3,110.40 $4.07
specified
113 2"asphaltic concrete Square
transition,with base, Yards 159.93 159.93 $24.65
complete as specified
114 3 Yd'asphaltic concrete Square
driveway/path,with base, Feet 344.70 344.70 $4.50
complete as specified
115 3 Y2"asphaltic concrete Square
transition,with base, Yards 166.41 166.41 $46.00
complete as specified
116 5"asphaltic concrete Square
pavement,with base, Yards 274.97 274.97 $46.00
complete as specified
Page 1 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
117 Furnish and install crushed
stone base course, Tons 1,206.00 1,206.00 $7.90
complete as specified
118 Sawing,complete as Linear
1,101.70 1,101.70 $1.50
specified Feet
119 Furnish and install
pavement ties(epoxy Each 295.00 295.00 $7.00
coated),complete as
specified
120 Adjust manholes and
inlets,complete as Each 112.00 112.00 $230.00
specified
121 Furnish and install No.4
reinforcing bars(epoxy Linear 3,530.00 3,530.00 $0.81
coated),complete as Feet
specified
122 Remove stumps,complete incr, 54.00 54.00 $20.00
as specified Diameter
123 Remove trees and stumps,
Inch
complete as specified Diameter 87.00 87.00 $25.00
124 Furnish and install trees, Each 1.00 1.00 $250.00
complete as specified
125 Furnish and install metal Square
detectable warning fields, Feet 344.00 344.00 $25.40
complete as specified
126 Terrace work on Broad
Street,complete as
Lump 1.00 1.00 $5,191.00
specified
127 Terrace work on Custer
Avenue,complete as
Lump 1.00 1.00 $4,653.00
specified
128 Terrace work on Eastman
Street,complete as
Lump 1.00 1.00 $3,936.00
specified
129 Terrace work on Lincoln
Avenue,complete as
Lump 1.00 1.00 $857.00
specified
130 Terrace work on Monroe
Street,complete as Sum 1.00 1.00 $5,646.00
specified
131 Terrace work on East New
York Avenue,complete as
Lump 1.00 1.00 $1,028.00
specified
132 Terrace work on East
Tennessee Avenue,
Lump 1.00 1.00 $3,385.00
complete as specified
133 Remove rails and ties, Lump 1.00 1.00 $1,525.00
complete as specified Sum
134 Excavation special, Tons 0.00 0.00 $10.00
complete as specified
135 Furnish and install cold
weather covering,1-layer Square 0.00 0.00 $0.01
visquine,complete as Yards
specified
136 Furnish and install cold
weather covering,2-layer Square 0.00 0.00 $0.01
visquine,complete as Yards
specified
Page 2 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
137 Furnish and install cold
weather covering,2-layer Square 0.00 0.00 $0.01
visquine and 6"hay, Yards
complete as specified _
SECTION I-(ITEMS 100-137)-SUB-TOTALS $0.00 80.00
SECTION I-CONCRETE PAVING(Original Contract 11-34)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
100 Remove Asphalt Trail Square 15.00 33.00 18.00 $6.00
Yards , $108.00
101 Temporary Cold Mix Square
Asphalt Trail Patch(include Feet 15.00 33.00 18.00 $45.00
6"CABC) $810.00
102 Hot mix Asphalt Trail Patch
(3"total depth,installed in Square 15.00 33.00 18.00 $45.00
2 lifts,E-0.3,9.5 mm) Yards
$810.00
103 Saw Cut Linear 20.00 20.00 $6.00
Feet
SECTION I-(ITEMS 100-103)-SUB-TOTALS 81,728.00 80.00
NET INCREASE TO:SECTION I 81,728.00
SECTION II-STORM SEWER(Original Contract 11-07)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
DESCRIPTION UNIT CONTRACT CONTRACT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE
2014 Utility line opening, Each 5.00 5.00 $860.00
complete as specified •
2030 Furnish and install 6"storm Linear
sewer,complete as Feet 10.00 10.00 $54.00
specified
-
2034 Furnish and install 10" Linear
storm sewer,complete as Feet 20.00 20.00 $58.00
specified -
2036 Furnish and install 12"
storm sewer,complete as Linear 1,018.90 1,018.90 $43.50
specified Feet
2042 Furnish and install 15" Linear
storm sewer,complete as Feet 1,892.30 1,892.30 $42.50
specified
2048 Furnish and install 18"
storm sewer,complete as Linear 1,206.40 1,206.40 $46.50
specified Feet
2054 Furnish and install 21"
storm sewer,complete as Linear 231.50 231.50 $53.00
specified Feet
2060 Furnish and install 24"
storm sewer,complete as Linear 524.10 524.10 $59.00
specified Feet
-
2072 Furnish and install 30"
storm sewer,complete as Linear 209.40 209.40 $69.50
specified Feet
Page 3 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
2074
Furnish and install 30" Linear 29.00 29.00 $84.50
RCP Class III storm sewer, Feet
complete as specified
•
2078 Furnish and install 36"
storm sewer,complete as Linear 440.80 440.80 $84.50
specified Feet
•
2128 Furnish and install 24"x
38"HERCP Class Ill storm Linear 384.70 384.70 $94.00
sewer,complete as Feet
specified
2280 Furnish and install 6"storm Linear
lateral,complete as Feet 2,830.40 2,830.40 $37.50
specified
2284 Furnish and install storm
sewer marker balls, Each 204.00 204.00 $17.75
complete as specified
2286
Furnish&install clay dams, Each 106.00 106.00 $29.00
complete as specified
2532 Furnish and install
standard storm manhole(4' Vertical 131.68 131.68 $244.00
diameter),complete as Feet
specified
2534 Furnish and install
standard storm manhole(5' Vertical 32.78 32.78 $391.00
diameter),complete as Feet
specified
2536 Furnish and install
standard storm manhole(6' Vertical 4.20 4.20 $473.00
diameter),complete as Feet
specified
2612
Furnish and install Type 1 Each 4.00 4.00 $1,383.00
inlet,complete as specified
2614 Furnish and install Type 3
inlet(with 18"sump), Each 55.00 55.00 $1,476.00
complete as specified _
2800 Connect to existing storm
sewer,complete as Each 7.00 7.00 $783.00
specified
2802 Connect to existing storm
lateral,complete as Each 1.00 1.00 $249.00
specified
2806 Connect to existing
manhole,complete as Each 9.00 9.00 $578.00
specified
2808 Connect to existing inlet, Each 2.00 2.00 $578.00
complete as specified
2820 Abandon 8"-12"storm
sewer,complete as Linear 3,640.20 3,640.20 $1.00
specified Feet
2824 Abandon storm manholes
and inlets,complete as Each 30.00 30.00 $231.00
specified
Page 4 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
2856 Furnish,install,maintain,
and remove Type D inlet Each 117.00 117.00 $65.00
protection,complete as
_specified
2862 Furnish,install,maintain, - -
and remove stone bag, Each 15.00 15.00 $10.00
complete as specified
SECTION II-(ITEMS 2014-2862)-SUB-TOTALS $0.00 $0.00
SECTION II-STORM SEWER(Original Contract 11-34)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
2105 Furnish&Install 60"RCP
Class III with Joint Ties and Linear 32.00 32.00 $1,100.00
Clay bedding and backfill Feet
2572 Furnish&Install Standard Vertical
Storm Inlet Manhole(6'x6' Feet 6.50 6.50 $1,485.00
Box)
2574 Furnish and Install 60"
RCP Class III Apron Each 1.00 1.00 $5,750.00
Endwall w/joint ties
2872 Furnish,Install,Maintain
and Remove Turbidity Each 1.00 1.00 $1,200.00
Barrier
2910 Furnish&Install Native Square
Seeding(WISDOT Seed Yards 59.00 140.00 81.00 $10.00 $810.00
Mixture 70)
2932 Furnish&Install Class I, Square
Urban,Type A Erosion Yards 59.00 140.00 81.00 $3.50 $283.50
Control Mat .
2945 Furnish&Install Medium Square 14.00 14.00 $45.00
Rip-Rap Yards
2990 Furnish,Install,Maintain Each 1.00 1.00 $11,000.00
and Remove Coffer Dam
2995 Stockpile,load,and haul
contaminated sediment to Ton 200.00 163.00 (37.00) $0.01 ($0.37)
Waste Management
Landfill in Berlin,WI
SECTION II-(ITEMS 2105-2995)-SUB-TOTALS $1,093.50 ($0.37)
ADDITIONAL WORK REQUIRED: (Original Contract 11-07)C.O.#1 -SECTION II
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE _ PRICE
20000 Additional labor,matreials,
and equipment to move
and reset storm inlet B-62, Lump 1.00 1.00 $1,054.65
per Invoice 11-591-02, Sum
dated 8/30/11,complete as
specified
ADDITIONAL WORK:C.O.#1 -(ITEM 20000)-SUB-TOTAL $0.00 $0.00
ADDITIONAL WORK REQUIRED: C.O.#2 - SECTION II
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
2991 Additional coffer dam
length and excavation in Lump
1.00 1.00 $8,800.00
Fox River based upon Sum
survey
Page 5 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
2996 Additional cost to haul
contaminated materials to Lump 1.00 1.00 $860.00
Whitelaw instead of Berlin Sum
2997 Import clay material for Lump
bedding and backfill of pipe Sum 1.00 1.00 $645.00
2998 Remove unsuitable backfill Lump 1.00 1.00 $860.00
materials Sum
ADDITIONAL WORK:C.O.#2 -(ITEMS 2991-2998)-SUB-TOTALS $0.00 $0.00
NET INCREASE TO: SECTION II $1,093.13
SECTION III-SANITARY SEWER(Orginal Contract 11-07)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
DESCRIPTION UNIT CONTRACT CONTRACT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE
3000 Furnish and install 8"
sanitary sewer relay, Linear 3,585.20 3,585.20 $52.00
complete as specified Feet
3004 Furnish and install 12"
sanitary sewer relay, Linear 225.50 225.50 $107.00
complete as specified Feet
•
3064 Furnish and install 12-inch
sanitary sewer drop, Vertical 6.81 6.81 $446.00
complete as specified Feet
3100 Furnish and install
standard sanitary manhole Vertical 131.31 131.31 $208.00
(4'diameter),complete as Feet
specified
3114
Furnish and install external
manhole chimney seal, Each 16.00 16.00 $457.00
complete as specified
3210 Furnish and install 8"x 6" - - -
factory wyes or tees, Each 90.00 90.00 $85.00
complete as specified _
3214 Furnish and install 12"x 6"-
factory wyes or tees, Each 9.00 9.00 $183.00
complete as specified
3234 Furnish and install 4"/6"
sanitary lateral relay, Linear 2,703.10 2,703.10 $69.00
complete as specified Feet
3236
Furnish and install sanitary Each 202.00 202.00 $18.00
lateral marker balls,
complete as specified
3238 Furnish and install clay
dams,complete as Each 99.00 99.00 $57.00
specified
Page 6 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
3300 Furnish and install
connections to existing 8" Each 1.00 1.00 $600.00
mains,complete as
specified
3302 Furnish and install
connections to existing 10" Each 1.00 1.00 $612.00
mains,complete as
specified
3304 Furnish and install
connections to existing 12" Each 3.00 3.00 $1,107.00
mains,complete as
specified
3330 Furnish and install
concrete collars,complete Each 0.00 0.00 $568.00
as specified
3332
Core into existing manhole, Each 0.00 0.00 $657.00
complete as specified
3700 Televise sanitary sewer, Linear 3,810.70 3,810.70 $1.15
complete as specified Feet
3800 Abandon sanitary
manholes,complete as Each 27.00 27.00 $289.00
specified
3802 Linear
Abandon 8"sanitary sewer, Feet 2,700.00 2,700.00 $0.60
complete as specified
3806 Abandon 12"sanitary
sewer,complete as Linear 2,064.00 2,064.00 $1.20
specified Feet
SECTION III-(ITEMS 3000-3806)-SUB-TOTALS $0.00 $0.00
ADDITIONAL WORK REQUIRED: (Original Contract 11-07)C.O.#1-SECTION III
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
3116 Furnish and install external
chimney seal extension,
complete as specified Each 6.00 6.00 $420.00
ADDITIONAL WORK: C.O.#1-(ITEM 3116)-SUB-TOTALS $0.00 $0.00
NET INCREASE TO: SECTION III $0.00
SECTION IV-WATER MAIN(Original Contract 11-07)
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
4000 Furnish and install 4"
ductile iron watermain with Linear 32.00 32.00 $73.50
poly wrap relay,complete Feet
as specified
Page 7 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
4002 Furnish and install 6"
ductile iron watermain with Linear 161.00 161.00 $132.00
poly wrap relay,complete Feet
as specified
4004 Furnish and install 8"
ductile iron watermain with Linear 3,305.00 3,305.00 $63.50
poly wrap relay,complete Feet
as specified
4006 Furnish&install 10"ductile
iron watermain with poly Linear 215.00 215.00 $85.00
wrap relay,complete as Feet
specified
4036 Furnish and install 1"water Linear
service relay,complete as Feet 2,198.50 2,198.50 $43.50
specified
4038 Furnish and install 1 '''A"
Linear
water service relay, Feet 0.00 0.00 $62.00
complete as specified
4048 Furnish and install 1"
corporation and stop box, Each 99.00 99.00 $259.00
complete as specified
4050 Furnish and install 1 'A"
corporation and stop box, Each 1.00 1.00 $518.00
complete as specified
4054 Furnish and install water
service clay dams, Each 100.00 100.00 $29.00
complete as specified
4056 Furnish and install
connections to existing 4" Each 2.00 2.00 $1,283.00
watermain,complete as
specified
4058 Furnish and install
connections to existing 6" Each 10.00 10.00 $1,332.00
watermain,complete as
specified
4060 Furnish and install
connections to existing 8" Each 6.00 6.00 $1,385.00
watermain,complete as
specified
4062 Furnish&install
connections to existing 10" Each 1.00 1.00 $1,490.00
watermain,complete as
specified
4109 Furnish and install 8"X 4"
tee,complete as specified Each 1.00 1.00 $299.00
4110 Furnish and install 8"X 6"
tee,complete as specified Each 8.00 8.00 $327.00
4111 Furnish and install 8"X 8"
tee,complete as specified Each 1.00 1.00 $390.00
4119 Furnish&install 10"X 6"
tee,complete as specified Each 1.00 1.00 $495.00
4189 Furnish and install 8"X 8"
cross,complete as Each 1.00 1.00 $553.00
specified _
4235 Furnish and install 4-inch
45 degree bend,complete Each 4.00 4.00 $120.00
as specified
4236 Furnish and install 6-inch
45 degree bend,complete Each 28.00 28.00 $170.00
as specified
4237 Furnish and install 8-inch
45 degree bend,complete Each 9.00 9.00 $232.00
as specified
4263 Furnish and install 8"X 4"
reducer,complete as Each 1.00 1.00 j $180.00
specified
Page 8 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
4267 Furnish&install 10"X 8"
reducer,complete as Each 1.00 1.00 $251.00
specified
4400 Furnish and install 4"gate
valve,complete as Each 1.00 1.00 $882.00
specified
4401 Furnish and install 6"gate
valve,complete as Each 9.00 9.00 $1,032.00
specified
4402 Furnish and install 8"gate
valve,complete as Each 10.00 10.00 $1,426.00
specified
4403 Furnish&install 10"gate
valve,complete as Each 1.00 1.00 $2,007.00
specified
4500 Furnish and install hydrant,
complete as specified Each 9.00 9.00 $2,885.00
4502 Furnish and install
gradelok for hydrant Each 0.00 0.00 $713.00
branches,complete as
specified
4900 Abandon watermain on
East Custer Avenue,
Harrison Street to Broad Sump 1.00 1.00 $2,300.00
Street,complete as
specified
4902 Abandon watermain on
Eastman Street,New York
Avenue to Custer Street, Sump 1.00 1.00 $2,300.00
complete as specified
4904 Abandon watermain on
Monroe Street,East Irving
Avenue to East Melvin
Lump 1.00 1.00 $2,300.00
Avenue,complete as
specified
4906 Abandon watermain on
East Lincoln Avenue,
Monroe Street to CN Sump 1.00 1.00 $1,500.00
Railroad tracks,complete
as specified
4908 Abandon watermain on
East New York Avenue,
North Main Street to
Lump 1.00 1.00 $1,500.00
Jefferson Street,complete
as specified
SECTION IV-(ITEMS 4000-4908)-SUB-TOTALS 80.00 $0.00
ADDITIONAL WORK REQUIRED: (Original Contract 11-07)C.O.#1-SECTION IV
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT
PRICE PRICE
4264 Furnish and install 8"x 6"
reducer,complete as Each 1.00 1.00 $192.00
specified
4300 Furnish and install 8"
sleeve,complete as Each 1.00 1.00 $226.51
specified
Page 9 of 10
CONTRACT:11-07 CHANGE ORDER#3
ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN
DESCRIPTION UNIT CONTRACT CONTRACT
NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE
PRICE PRICE
40000 Additional labor,materials,
and equipment to fix a
leaking joint on existing 8"
water main in the
intersection of Custer Sump 1.00 1.00 $1,236.25
Avenue and Grand Street,
per Invoice 11-591-01,
dated 7127111,complete as
specified
ADDITIONAL WORK: C.O.#1 (ITEMS 4264-40000)-SUB-TOTAL $0.00 MOO
NET INCREASE TO: SECTION IV $0.00
NET INCREASE TO SECTIONS I,II,III,IV $2,821.50
NET DECREASE TO SECTIONS I,II,III,IV ($0.37)
NET INCREASE TO CONTRACT: $2,821.13