HomeMy WebLinkAbout08. 12-324JUNE 26, 2012 12 -324 RESOLUTION (CARRIED 7 -0 LOST LAID OVER WITHDRAWN PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 12 -16 WITH FOUR -WAY CONSTRUCTION OF WI, INC., FOR SANITARY SEWER CONSTRUCTION — OSHKOSH AVENUE ( +$5,928.88) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: FOUR -WAY CONSTRUCTION OF WI, INC. N8761 Forest Ridge PO Box 133 Berlin, WI 54923 Net Increase to Contract: $5,928.88 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 317 - 0410 - 7480 -03302 Special Assessments Fund — Sewer 317 - 0410 - 7480 -03303 Special Assessments Fund - Water 541 - 1810 - 1799 -00000 Water Utility Construction Work in Progress 551 - 1910 - 1799 -00000 Sewer Utility Construction Work in Progress (-4.116-.) OJHKOJH ON THE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works DATE: June 21, 2012 RE: Change Order No. 1 for Public Works Contract No. 12-16 Sanitary Sewer Construction—Oshkosh Avenue Four-Way Construction of WI, Inc. (+$5,928.88) BACKGROUND Change Order No. 1 for Contract 12-16 is scheduled for consideration by the Common Council at the June 26, 2012 meeting. The contract was originally awarded to Four-Way Construction of WI, Inc. in April of 2012. This change order is for additional services provided and for final quantities. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Sanitary Sewer—Actual installed quantities were less than estimated. • Water Main — During installation of the sanitary sewer, an extremely shallow water lateral was discovered. This lateral failed multiple times. The property owner agreed to pay for installation of a new water lateral. Additionally, a fire hydrant was relocated to avoid conflict with WDOT work. FISCAL IMPACT The project was not anticipated or included in the 2012 Capital Improvement Program. The original bid amount was $126,123.95. The WDOT will reimburse the City 90% of the costs to complete this work. Adequate funding is available from other projects coming in under budget. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 12-16 in the amount of +$5,928.88 to Four-Way Construction of WI, Inc. Respectfully Submitted, Approved: 2-&).„.1 Steven M. Gohde, P.E. Mark A. Rohloff Asst. Director of Public Works City Manager SMG/tlt I;IEngineering112-16 San Sewer&Laterals-Oshkosh Ave\Project_Information\Correspondence\Memo 112-16 Memo for CO#1x_6-21-12.docx TO: Four-Way Construction of WI, Inc. CHANGE ORDER# 1 N8761 Forest Ridge DATED: June 4, 2012 PO Box 133 Berlin, WI 54923 Your present contract with the City of Oshkosh, Contract No. 12-16, awarded April 17, 2012, is hereby amended and changed as follows: NET XXCREASE TO: SECTION I - PAVING $0.00 NET XXCREASE TO: SECTION II - STORM SEWER $0.00 NET DECREASE TO: SECTION III - SANITARY SEWER ($10,992.95) NET INCREASE TO: SECTION IV-WATER MAIN $16,921.83 NET INCREASE TO CONTRACT $5,928.88 Section I Section II Section III Section IV (Paving) (Storm) (Sanitary) (Water) Totals Bid Total $0.00 $0.00 $123,298.95 $2,825.00 $126,123.95 C.O.#1 $0.00 $0.00 ($10,992.95) $16,921.83 $5,928.88 Contract Total $0.00 $0.00 $112,306.00 $19,746.83 $132,052.83 CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved a 1d acce ted: Contractor/ I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT:12-16 CHANGE ORDER#1 SECTION III-SANITARY SEWER ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 3000 Furnish&install 8"sanitary sewer relay,complete as Linear specified Feet 815 814.24 -0.76 $84.60 ($64.30) 3004 Furnish&install 12" sanitary sewer relay, Linear complete as specified Feet 15 7.20 -7.80 $63.25 ($493.35) 3100 Furnish&install standard sanitary MH(4'Dia.), Vertical complete as specified Feet 50 48.80 -1.20 $230.00 ($276.00) 3200 Furnish&install 8"x 4" factory wyes,complete as specified Each 2 0.00 -2.00 $60.00 ($120.00) 3210 Furnish&install 8"x 6" factory wyes, complete as specified Each 11 11.00 $95.00 3234 Furnish&install 4"/6" sanitary lateral relay, Linear complete as specified Feet 400 284.40 -115.60 $85.00 ($9,826.00) 3235 Furnish&install 4"/6" sanitary lateral riser, Linear complete as specified Feet 65 53.50 -11.50 $65.00 ($747.50) 3236 Furnish&install sanitary lateral marker balls, complete as specified Each 26 27.00 1.00 $26.20 $26.20 3238 Furnish&install sanitary lateral clay dams,complete as specified Each 13 11.00 -2.00 $60.00 ($120.00) 3304 Furnish&install connection to existing 12" main,complete as specified Each 3 1.00 -2.00 $350.00 ($700.00) SECTION III-(BID ITEMS 3000-3304)-SUB-TOTALS $26.20 ($12,347.15) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION Ill - ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 30000 Additional equipment, labor, and materials to excavate and cap a new sanitary riser for#1823 Oshkosh Avenue, per Invoice dated 4/17/12, Lump complete as specified Sum 0.00 1.00 1.00 $1,328.00 $1,328.00 ADDITIONAL WORK: C.O.#1 -(ITEM 30000)-SUB-TOTAL $1,328.00 $0.00 NET DECREASE TO: SECTION III ($10,992.95) Page 1 of 2 CONTRACT:12-16 CHANGE ORDER#1 SECTION IV-WATER MAIN ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 40000 Insulate existing water services,complete as specified Each 5 1.00 -4.00 _ $565.00 ($2,260.00) SECTION IV-(BID ITEM 40000)-SUB-TOTALS $0.00 ($2,260.00) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION IV INCREASE IN DECREASE IN ITEM BID INSTALLED NET NET UNIT DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 40001 Additional equipment, labor, and materials to relocate existing hydrant from existing 6-inch water main to existing 12-inch water main,including a new 6"valve and sleeve, per Invoice dated 4/20/12, Lump complete as specified Sum 0.00 1.00 1.00 $5,186.02 $5,186.02 40002 Additional equipment, labor, and materials to relay 4-inch water lateral at a deeper depth for Robbin's Restaurant;work included chlorination, pressure testing, and reconnection,per Invocie dated 4/2012,complete as Lump specified Sum 0.00 1.00 1.00 $13,995.81 $13,995.81 ADDITIONAL WORK: C.O.#1 (ITEMS 40001 -40002)-SUB-TOTAL $19,181.83 $0.00 NET INCREASE TO: SECTION IV $16,921.83 NET INCREASE TO SECTIONS I, II,III,IV $20,536.03 NET DECREASE TO SECTIONS I,II,III,IV ($14,607.15) NET INCREASE TO CONTRACT: $5,928.88 Page 2 of 2