JUNE 12, 2012 12-302 RESOLUTION
(CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: APPROVAL OF CHANGE ORDER NO. 3 FOR PUBLIC WORKS
CONTRACT NO. 11-07 WITH PTS CONTRACTORS, INC. FOR
VARIOUS CONCRETE PAVING & UTILITY PROJECTS – NORTH
SIDE AREA (+$2,821.13)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
PTS CONTRACTORS, INC.
4075 Eaton Road
Green Bay, WI 54311
Net Increase to contract: $2,821.13
PURPOSE: See attached Change Order.
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
from:
Acct. Nos. 311-0410-7480-00000 Sidewalk Construction Fund
315-0410-7480-00000 Street Improvement Fund Expenditures
317-0410-7480-03301 Special Assessments Fund - Streets
317-0410-7480-03302 Special Assessments Fund - Sewer
317-0410-7480-03303 Special Assessments Fund - Water
317-0410-7480-03304 Special Assessments Fund - Sidewalks
317-0410-7480-03305 Special Assessments Fund - Storm Water
541-1810-1799-00000 Water Utility Construction Work in Progress
551-1910-1799-00000 Sewer Utility Construction Work in Progress
561-2010-1799-00000 Storm Water Utility Construction Work in
Progress
( 0
O HKOJH
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
PROM: Steven M. Gohde, Assistant Director of Public Works
DATE: June 7, 2012
RE: Change Order No. 3 for Public Works Contract No. 11 -07
Concrete Paving and Utilities — North Side Paving Project
PTS Contractors, Inc. ( +$2,821.13)
BACKGROUND
Change Order No. 3 for Contract 11 -07 is scheduled for consideration by the Common Council at the June 12,
2012 meeting. The contract was originally awarded to PTS Contractors, Inc. in May of 2011. This change order
is for final quantities. The additional work is related to the emergency repair of the storm sewer outfall in
vacated Blackhawk Street.
ANALYSIS
All work on the project has been completed and final quantities measured.
FISCAL IMPACT
Contract Section
Change Order Amount
New Contract Total
CIP Budget Amount
Concrete Paving
$1,728.00
$1,032,443.96
$1,835,433.00
Storm Sewer
$1,093.13
$674,884.58
$835,000.00
Sanita Sewer
$0.00
$476,645.64
$573,200.00
Water Main
$0.00
$478,195.01
$817,100.Q0
Total
$
$2,662,169.19
$4,060,733.00
Adequate funds are available in the relating sections of the 2011 Capital Improvement Budget.
RECOMMENDATIONS
I recommend approval of Change Order No. 3 to Contact No. 11 -07 in the amount of +$2,821.13 to PTS
Contractors, Inc.
Respectfully Submitted, Approved:
Steven M. Gohde, P.E. / Mark A. Rohloff
Asst. Director of Public Works City Manager
SMGltlt
IAEngineeringli"I Concrete Paving and UC ties North\Projec€_ Information [carespondencelMemo111 -07 Memo for CO 113_6- 7- 12.docx
TO: PTS CONTRACTORS, INC CHANGE ORDER # 3
4075 EATON ROAD DATED: May 11, 2012
GREEN BAY WI 54311
FINAL .
Your present contract with the City of Oshkosh, Contract No. 11-07, awarded May 24, 2011, is hereby
amended and changed as follows:
NET INCREASE TO: SECTION I - PAVING $1,728.00
NET INCREASE TO: SECTION II - STORM SEWER $1,093.13
NET INCREASE TO: SECTION III - SANITARY SEWER $0.00
NET INCREASE TO: SECTION IV - WATER MAIN $0.00
CITY OF OSHKOSH
Recommended:
Director of Public Works
M
City Manager
City Clerk
Approved and accepted:
Contracto
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Comptroller
Approved as to form:
City Attorney
NET INCREASE TO CONTRACT
$2,821.13
Section I
Section Ii
Section III
Section IV
(Paving)
(Storm)
(Sanitary)
(Water)
Totals
Bid Total
$1,081,034.50
$627,720.50
$504,782.75
$468,751.00
$2,682,288.75
C.O. #1
($51,878.54)
($29,325.05)
($28,594.11)
. $9,444.01
($100,353.69)
Prev.Contract Totals
$1,029,155.96
$598,395.45
$476,188.64
$478,195.01
$2,581,935.06
C.O. #2 Totals
$1,560.00
$75,396.00
$457.00
$0.00
$77,413.00
Contract Total
$1,030,715.96
$673,791.45
$476,645.64
$478,195.01
$2,659,348.06
C.O. #3 Totals
$1,728.00
$1,093.13
$0.00
$0.00
$2,821.13
Contract Total
$1,032,443.96
$674,884.58
$476,645.64
$478,195.011
$2,662,169.19
CITY OF OSHKOSH
Recommended:
Director of Public Works
M
City Manager
City Clerk
Approved and accepted:
Contracto
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Change Order.
Comptroller
Approved as to form:
City Attorney
CONTRACT: 11 -07 CHANGE 0RDER # 3
SECTION 1- CONCRETE PAVING (Original Contract 11 -07)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECRE45EIN
NUMBER
QUAIyT1TY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
101
Sidewalk and driveway
PRICE
AR10E
100
Pavement removal,
Square
complete asspecified
Yards
2,822.00
2,822.00
$3,25
101
Sidewalk and driveway
removal, complete as
Square
Feet
36,289.80
36,289,80
$0.40
specified
102
Excavation, complete as
Cubic
s ecified
Yards
11,637.30
11,637.30
$8.60
103
7" non - reinforced concrete
pavement, including
integral curb, 5` base
Square
Yards
14,571.39
14,571.39
$27.60
material and grading,
complete as specified
104
8" non - reinforced concrete
pavement, including
Square
Integral curb, 6" base
Yards
7,447.33
7,447.33
$31.50
material and grading,
complete ass specified
105
8" concrete pavement,
HES, including lntegral
curb and 6" base material
Square
Yards
263.62
263.62
$36.00
and grading, complete as
specified .
106
12" wide radius curb head,
complete as specified
Linear
Feet
613.60
613.60
$5.08
107
Standard 24" curb & gutter,
7" (tie -in), complete as
Linear
Feet
13.50
13.50
$26.40
specified
108
Standard 30" curb & gutter,
7" (tie -in), complete as
Linear
173.70
173.70
$21.35
s ecified
Feet
109
Sidewalk curb, complete as
Linear
- specified
.
Feet
8.20
8,201
$17.30
110
4" concrete sidewalk, 1
Square
complete asspecified
Feet
19,675.80
19,675.80
$3.34
111
6" concrete sidewalk and
Square
driveway, complete as
Feet
18,394.70
18,394.70
$3.66
specified
112
8" concrete sidewalk and
driveway, complete as
Square
Feet
3,110.40
3,110.40
$4,07
.specified
113
2" asphaltic concrete
transition, with base,
Square
Yards
159.93
159.93
$24,65
complete asspecified
114
3 W asphaltic concrete
drivowaylpath, with base,
Square
Feet
344.70
344.70
$4.50
complete asspecified
115
3 %z asphaltic concrete
transition, with base,
Square
Yards
166.41
166.41
$46.00
comp late ass specified
116
5" asphaltic concrete
pavement, with base,
Square
Yards
274.97
274.97
$46.00
cam lets as s ecified
Page 1 of 10
CONTRACT; 11 .07 CHANGE ORDER # 3
ITEM
NUMBER
DESCRlPRON
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
1NCREASEIN
CO
DECREASEIN
CON1R4CT
PRICE
117
Furnish and install crushed
stone base course,
complete as specified
Tons
1,206.00
1,206.00
$7,90
118
Sawing, complete as
Linear
specified
Feet
1,101.70
1,101.70
$1.50
119
Furnish and install
pavement ties (epoxy
coated), complete as
Each
295.00
285.00
87.00
specified
120
Adjust manholes and
inlets, complete as
Each
112.00
112.00
$230.00
specified
121
Furnish and install No, 4
reinforcing bars (epoxy
Linear
coated), complete as
Feet
3,530.00
3,530,00
$0,81
specified
122
Remove stumps, complete
inch
ass specified
Diameter
54.00
54.00
$20.OD
123
Remove frees and stumps,
complete as specified
Diameter
87.00
87.00
$25.00
124
Furnish and install trees,
com Iota asspecified
Each
1.00
1.00
$250.00
125
Furnish and install metal
detectable warning fields,
Square
344.00
344.00
$25,40
complete asspecified
Feet
126
Terrace work on Broad
Street, complete as
S u m
1.00
1.00
$5,191.00
specified
127
Terrace work on Custer
Avenue, complete as
Sump
1.00
1.00
$4,653.00
specified
128
Terrace work on Eastman
Street, complete as
Sump
1.00
1.00
$3,936.00
specified
129
Terrace work on Lincoln
Avenue, complete as
L u m p
1.00
1.00
$857.00
specified
130
Terrace work on Monroe
Street, complete as
Su m p
1.00
1.00
$5,646.00
s ecifed
131
Terrace work on East New
York Avenue, complete as
Sum
1.00
1.00
$1,028.00
specified
132
Terrace work on East
Tennessee Avenue,
Sum
1.00
1.00
$3,385.00
complete ass specified
133
Remove rails and ties,
Lump
Complete asspecified
Sum
1.00
1.00
$1,525.00
134
Excavation special,
complete asspecified
Tons
0.00
0.00
$10.00
135
Furnish and install cold
weather covering, 1 -layer
Square
visquine, complete as
Yards
0.110
Q.00
$0,01
ape fled
136
Furnish and install cold
weather covering, 2 -layer
Square
visquine, complete as
Yards
0,00
O.DO
$0,01
specified
Page 2 of 10
CONTRACT; 11 -07 CHANGE ORDER # 3
ITEM
Remove Asphalt Trail
Square
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
DESCRIPTION
UNIT
QUANTFTY
QUANTITIES
INCREASE
I
DECREASE
PRICE
CONIRACT
CONTRACT
101
Temporary Cold Mix
PRICE
PRICE
137
Furnish and install cold
Square
15.00
33.00
18,00
$45.00
weather covering, 2 -layer
Square
$810.00
102
visquine and 8` hay,
Yards
0.00
0.00
80,01
complete ass specified
Square
20.00
20,06
$58.00
SECTION I - (ITEMS 100.137) - SUB- TOTALS $0.00 $0.00
SECTION I - CONCRETE PAVING (Or €g Ina I Contract 11 -34)
ITEM
Remove Asphalt Trail
Square
CONTRACT
INSTALLED
NEF
NET
UNlF
INCREASEW
DECREASEIN
NUAlBER
DESCRIPTION
MY
QUANTITY
QUANTITIES
I
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
101
Temporary Cold Mix
PRICE
PRICE
100
Remove Asphalt Trail
Square
CONTRACT
INSTALLED
NET
NEI
UNIT
lNCREASEIN
DECREASEIN
NUMBER
DESCRIPTION
Yards
15.00
33.00
18.00
DECREASE
$6.00
$106.00
CONTRACT
101
Temporary Cold Mix
PRICE
PRICE
Asphalt Trail Patch (include
Square
15.00
33.00
18,00
$45.00
6" CABC
Feet
$810.00
102
Hot mix Asphalt Trail Patch
(3" total depth, installed in
Square
20.00
20,06
$58.00
2 lifts, E -0.3, 9.5 mm)
Yards
15.00
33.00
18.04
$45.00
2036
Furnish and install 12"
$810.00
103
Saw Cut
Linear
1,018.90
1,018.90
$43.50
specified
Feel
2p 00
20.00
86,00
SECTION I - (ITEMS 100 -103) - SUB - TOTALS $1,728.00 $0.00
NET INCREASE TO: SECTION 1 $1,728.00
SECTION 11 - STORM SEWER (Original Contract 11 -07)
ITEM
Utility line opening,
CONTRACT
INSTALLED
NET
NEI
UNIT
lNCREASEIN
DECREASEIN
NUMBER
DESCRIPTION
UNfT
QUANTITY
QUANTITIES
fNCRf ASE
DECREASE
PRICE
CONTRACT
CONTRACT
2030
Furnish and install 6" storm
PRICE
PRICE
2014
Utility line opening,
com fete ass ec€fied
Each
5.00
5.00
$880.00
2030
Furnish and install 6" storm
sewer, complete as
Linear
10.00
10.00
$54.00
s ec €fed
Feet
2034
Furnish and install 10"
storm sewer, complete as
Linear
20.00
20,06
$58.00
s acified
Feat
2036
Furnish and install 12"
storm sewer, complete as
Linear
1,018.90
1,018.90
$43.50
specified
Feet
2042
Furnish and Install 15"
storm sewer, complete as
Linear
1,892.30
1,892.30
$42,50
.specified
Feet
2048
Furnish and install 18"
storm sewer, complete as
Linear
1,206.40
1,206.40
$46.50
s acified
Feet
2054
Furnish and Install 21"
storm sewer, complete as
Linear
Feet
231.50
231.50
$53.00
s ee €fad
2060
Furnish and Install 24"
storm sewer, complete as
Linear
524.10
524.10
$59.00
specified
Feet
2072
Furnish and install 30"
storm sewer, complete as
Linear
Feat
209.40
209.40
$69.50
specified
Page 3 of 10
CONTRACT. 11.07 CHANGE ORDER 4 3
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNfT
INCREASEIN
CONTRACT
DECRE4SEIN
CONTRACT
NUMBI R
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
PRICE
2074
Furnish and install 30"
Linear
RCP Class III storm sewer,
Feet
29.00
29.00
$84.50
. complete asspecified
2078
Furnish and install 36"
storm sewer, complete as
1
Linear
440.80
440.80
$84.50
specified
Feet
2128
Furnish and install 24" x
38" HERCP Class III storm
Linear
sewer, complete as
I specified
Feet
384.70
384.70
$94.00
2280
Furnish and install 6" storm
lateral, complete as
Linear
Linear
2,830.40
$37.50
specified
Feet
2284
Furnish and install storm
sewer marker balls,
Each
204.00
204.00
$17.75
complete ass cified
2286
Furnish & install clay dams,
Each
106.00
106.00
$29.00
. complete asspecified
2532
Furnish and Install
standard storm manhole (4'
Vertical
diameter), complete as
1
Feet
131.68
131.68
$244.00
specified
2534
Furnish and install
standard storm manhole (5'
Vertical
diameter), complete as
Feet
32 78
32 78
8391.04
5 ecified
2536
Furnish and install
standard storm manhole (6'
Vertical
diameter), complete as
Feet
4.20
4.20
$473.00
specified
2612
Furnish and install Type i
Each
4.00
4.00
$1,383.00
Inlet, complete asspecified
2614
Furnish and install Type 3
inlet (with 18° sump),
Each
55.00
55.00
$1,476.00
complete ass ecified
2800
Connect to existing storm
sewer, complete as
Each
7.00
7.00
$783.00
. specified
2802
Connect to existing storm
lateral, complete as
Each
1.00
1100
$249.00
specified
2806
Connect to exist €ng
manhole, complete as
Each
9.00
9.00
$578.00
specified
2808
Connect to existing Inlet,
. complete
ass specified
Each
2.00
2.00
$578.00
2820
Abandon V'- 12" storm
sewer, complete as
Linear
3,644.20
3,640.20
specified
Feet
2824
Abandon storm manholes
and inlets, complete as
Each
30.00
30.00
$231.00
specified
Page 4 of 10
CONTRACT; 11 -07 CHANGE ORDER # 3
ITEM
NUMBER
DESCRIPTION
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASE IN
CONTRACT
PRICE
DECREASEIN
CONTRACT
PRICE
2856
Furnish, Install, maintain,
CONTRACT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
PRICE
PRICE
and remove Type D inlet
PRICE
PRICE
2105
protection, complete as
Each
117.00
117.00
$65.00
,specified
Linear
2862
Furnish, install, maintain,
Feet
32.00
32.00
$1,100.00
2572
and remove stone bag,
Each
15.00
15.00
$10,00
complete asspecified
6.50
6.50
$1
SECTION II - (ITEMS 2014 - 2862) - SUB - TOTALS $0.00 $0.00
SECTION II - STORM SEWER (Original Contract 11 -34)
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASE IN
CONTRACT
NUMBER
PRICE
CONTRACT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
PRICE
PRICE
PRICE
PRICE
2105
Furnish & Install 60" RCP
Class III with Joint Ties and
Linear
Clay bedding and backfill
Feet
32.00
32.00
$1,100.00
2572
Furnish & Install Standard
Vertical
Storm Inlet Manhole (6'x6'
6.50
6.50
$1
Box
Feet
2574
Furnish and Install 60"
RCP Class il[ Apron
Each
11.00
1.40
$5,750.00
Endwali w/ loint ties
2872
Furnish, install, Maintain
and Remove Turbidity
Each
11.00
1.00
$1
Barrier
2910
Fumish & Install Native
Seeding (WISDOT Seed
Square
69.00
140.00
81.00
$10.00
$810.00
Mixture 70
Yards
2932
Furnish & Install Class I,
Urban, Type A Erosion
Square
59.00
140.00
81.00
$3.50
$283.50
Control Mat
Yards
2945
Furnish & Install Medium
Square
Rip-Rap
Yards
14.00
14.00
$45.00
2990
Furnish, Install, Maintain
Each
1.00
1.00
$11,000.00
and Remove Coffer Dam
2995
Stockpile, load, and haul
contaminated sediment to
Waste Management
Ton
200,00
163.00
(37.00)
$0.01
($0.37)
Landfill In Berlin, Wl
SECTION 11 - (ITEMS 2105 -2995) - SUB - TOTALS $1,093.50 ($0.37)
ADDITIONAL WORK REQUIRED: (Original Contract 11.07) C.O. # 1 - SECTION If
ITEM
CONTRACT INSTALLED
NET NET
UNIT
INCREASEIN
DECREASE IN
NUMBER
DESCRIPTION
UNIT QUANTITY QUANFI7 }ES
I
INCREASE DECREASE
I
PRICE
CONTRACT
CONTRACT
DECREASE
PRICE
CONTRACT
CONTRACT
PRICE
PRICE
20000 Additional labor, matreials,
and equipment to move
and reset storm inlet B -62, Lump 1.00 100 $1,054.65
perinvoiee 11- 591.02, Sum
dated 8130/11, complete as
specified
ADDITIONAL WORK: C.O. # 1 - (ITEM 20000) - SU9•TOTAL $0.00 $0.00
ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION 11
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
DESCRIPTION
UNIT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
PRICE
PRICE
2991 Additional coffer dam
length and excavation in Lump 1.00 1.00 $8,600.00
Fox River based upon Sum
surve
Page 5 of 10
CONTRACT: 11 -07 CHANGE ORDER # 3
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
UNIT
QUANTITY QUANTITIES
I I
QUANTIFY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT,
CONTRACT
complete ass specified
Feet
PRICE
PRICE
PRICE
PRICE
2996
Additional cost to haul
'
contaminated materials to
Lump
1.00
1.00
$660.00
Whilelaw instead of Barlin
Sum
2997
Import clay material for
bedding and backfill of pipe
Sump
1.00
1.00
$645.00
com fete ass specified
Feet
2998
Remove unsuitable backfill
Lump
materials
Sum
j 1.00
1.00
$860.00
ADDITIONAL WORK: C.O. #2 - (ITEMS 2991.2998)- sue - TOTALS $0.00 $0.00
NET INCREASE TO: SECTION Ii $1,093.13
SECTION III - SANITARY SEWER (Orginal Contract 11.07)
ITETd
Furnish and install w
CONTRACT INSTALLED
NET
UNIT
INCREASEIN
DECREASEIN
NUAIMER
DESCRIPTION
UNIT
QUANTITY QUANTITIES
I I
INCREASE
=NET
DPRICE
CONTRACT
CONTRACT
complete ass specified
Feet
PRICE
PRICE
3000
Furnish and install w
sanitary sewer relay,
Linear
3,565.20
3,585.20
$52.00
complete ass specified
Feet
3004
Furnish and install 12"
sanitary sewer relay,
Linear
225.50
225.50
$107.00
complete asspecified
Feet
3064
Furnish and install 12 -inch
sanitary sewer drop,
Vecficai
6.81
6.81
$446.00
com fete ass specified
Feet
3100
Furnish and insta
standard sanitary manhole
Vertical
(4' diameter), complete as
Feet
131.31
131.31
$208.00
specified
3114
Furnish and install external
manhole chimney seal,
Each
16.00
16.00
$457.00
complete as specified
3210
Furnish and instal[ 8" x 6"
factory wyes or tees,
Each
90.00
90.00
$85.00
complete as specified
3214
Furnish and install 12" x 6"
factory wyes or tees,
Each
9.00
9.00
$163.00
complete asspecified
3234
Furnish and install 4'16"
sanitary lateral relay,
Linear
2,703.110
2,703.10
$69.00
.complete
asspecified
Feet
3236
Furnish and install sanitary
lateral marker balls,
Each
202.00
202.00
$18.00
complete asspecified
3238
Furnish and install day
dams, complete as
Each
99.00
99.00
$57.00
specified
Page 6 of 10
CONTRACT: 11.07 CHANGE ORDER # 3
ITEM
NUMBER
DESCRIPTION
UNIF
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASEIN
CONTRACT
NUMBER
DESCRIPTION
UNfT
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE .
PRICE
PRICE
3300
Furnish and install
PRICE
PRICE
PRICE
PRICE
connections to existing 8"
mains, complete as
Each
f.00
1.00
$600,00
specified
3302
Furnish and install
connections to existing 10"
mains, complete as
Each
1,00
1.00
$612.00
,specified
3304
Furnish and install
connections to existing 12"
mains, complete as
Each
3.00
3.00
$1,107.00
s ecif[ed
3330
Furnish and install
concrete collars, complete
Each
0.00
0.00
$568.00
asspecified
3332
Core into existing manhole,
Each
0.00
0.00
$657.00
complete asspecified
3700
Televise sanitary sewer,
linear
complete ass specified
f=eet
3,814.70
3,8f 0.70
$1.15
3800
Abandon sanitary
manholes, complete as
Each
27.00
27.00
$280.00
.specified
3802
Abandon 8" sanitary sewer,
Linear
2,700.00
2,700.00
$0.60
com lete ass specified
Feet
3806
Abandon 12" sanitary
sewer, complete as
Linear
Feet
2,064.00 1
2,064.00
1
$1.20
specified
SECTION III - (ITEMS 3000 -3806) - SUB - TOTALS $0.00 $0.00
ADDITIONAL WORK REQUIRED: (Original Contract 11.07) C.O. # 1 - SECTION III
ITEM
CONTRACT
CONTRACT
INSTALLED
MET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
DESCRIPTION
UNfT
QUANTITY
QUANTITIES
I
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACF
PRICE
PRICE
PRICE
PRICE
3116 Furnish and install external
chimney seal extension,
complete as specified Each 6.00 6.00 $420.00
ADDITIONAL WORK: C. 0. # 1 - (ITEM 3116) - SUB- TOTALS $0.00 $0.00
NET INCREASE TO: SECTION ill $0.00
SECTION IV - WATER MAIN (Original Contract 11.07)
ITEM
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
DESCRIPTION UNIT
QUANTITY
QUANTITIES
INCREASE
I DECREASE
PRICE
CONTRACT
CONTRACT
I
PRICE
PRICE
4000 Furnish and install 4°
ductile Iron watermain with Linear 32.00 32.00 $7$.50
poly wrap relay, complete Feet
asspecified
Page 7 of 10
CONTRACT: 11 -07 CHANGE ORDER # 3
ITEM
DESCRIPTION
UNIT
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
CONTRACT
DECREASEIN
CONTRACT
NUMBER
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
PRICE
PRICE
40D2
Furnish and install 6"
ductile iron watermain with
Linear
poly wrap relay, complete
Feat
16`1.00
161 00
$132.00
asspecified
4004
Furnish and install 8"
ductile iron watermain with
Linear
poly wrap relay, complete
Feet
3,305.00
3,305.00
$63.50
asspecified
4006
Furnish & install 10" ductile
iron watermain with poly
Linear
wrap relay, complete as
Feet
215.00
215.00
$85.00
specified
4036
Furnish and install V water
service relay, complete as
Linear
2,198.50
2,198.50
$43.50
specified
Feet
4038
Furnish and install 1 '1W
water service relay,
Linear
0.00
0.00
$62.00
complete ass specified
Feet
4048
Furnish and install 1"
corporation and stop box,
Each
99.00
99.00
$259.00
complete ass ecified
4050
Furnish and install 1 W
corporation and stop box,
Each
1.00
1.00
$518.00
complete asspecified
4054
Furnish and install water
service clay dams,
Each
100.00
100.00
$29.00
.complete ass ecified
4056
Furnish and Install
connections to existing 4"
watermain, complete as
Each
2.00
2.00
$1,283.00
specified
4056
Furnish and install
connections to existing 6"
watermain, complete as
Each
10.00
10.00
$1,332.00
s ecified
4060
Furnish and Install
connections to existing 8"
Each
6.00
6.00
$1,385.00
watermain, complete as
specified
4062
Furnish & install
connections to existing 10"
watermain, complete as
Each
1.00
1.00
$1,490.00
specified
4109
Furnish and install B" X 4"
tee, complete as specified
Each
1.00
1.00
$299.00
4110
Furnish and install 8!'X 6"
tee, complete as specified
Each
8.00
8.00
$327.00
4111
Furnish and install 8" X 8"
tee, complete as specified
Each
1.00
1.00
$380.00
4119
Furnish & Install 10" X 6"
tee, complete as specified
Each
1.00
1.00
$495.00
4189
Furnish and install 8" X V
cross, complete as
Each
1.00
1.00
$553.00
specified
4235
Furnish and Install 4 -inch
45 degree band, complete
Each
4.00
4.00
$120.00
asspecified
4236
Furnish and Install 6 -Inch
45 degree bend, complete
Each
28.00
28.00
$170.00
asspecified
4237
Furnish and install 8 -inch
45 degree bend, complete
Each
9.00
9.00
$232.00
asspecified
4263
Furnish and install B" X 4"
reducer, complete as
Each
1,00
1.00
$180.00
s ecified
Page 8 of 10
CONTRACT: 11 -07 CHANGE ORDER # 3
ITEM
DESCRIPTION
UNIT
CONTRACT
WSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
QUANTITY
I
QUANTITIES
QUANTITY
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
specified
PRICE
PRICE
PRICE
PRICE
4267
Furnish & instal€ 10" X 8"
reducer, complete as
Each
1.00
1.00
$251,00
s ecified
4400
Furnish and install 4" gate
valve, complete as
Each
1.00
1.00
$882.00
specified
4401
Furnish and install 6' gate
valve, complete as
Each
9.00
9.00
$1,032.00
specified
4402
Furnish and install 8" gate
valve, complete as
Each
10.00
10.00
$1,426.00
specified
4403
Furnish & Install 10" gate
valve, complete as
Each
11.00
1.00
$2,007.00
s ecifed
4500
Furnish and install hydrant,
complete as specified
Each
9.00
9.00
$2,885.00
4502
Furnish and install
gradalok for hydrant
Each
0.00
0.00
$713.00
branches, complete as
specified
4900
Abandon watermain on
East Custer Avenue,
Harrison Street to Broad
S u mp
1.00
1.00
$2,300.00
Street, complete as
specified
4902
Abandon watermain on
Eastman Street, New York
Avenue to Custer Street,
Lump
Sum
1.00
1,00
$2,300.00
complete as specified
4904
Abandon watermain on
Monroe Street, East Irving
Avenue to East Melvin
s
11.00
1.00
$2,300.00
Avenue, complete as
.specified
4906
Abandon watermain on
East Lincoln Avenue,
Monroe Street to CN
S u mp
1.00
1,00
$1,500.00
Railroad (racks, complete
asspecified
4908
Abandon watermain on
East New York Avenue'
Lump
North Main Street to
Sum
1.00
11.00
$1,500.00
Jefferson Street, complete
asspecified
SECTION 1V - (ITEMS 4000 - 4908) - SUB - TOTALS $0.00 $0.00
ADDITIONAL WORK REQUIRED: (Original Contract 11.07) C.O. # 1 - SECTION IV
ITEM
Furnish and install 8" x 6"
CONTRACT
INSTALLED
NET
NET
UNIT
INCREASEIN
DECREASEIN
NUMBER
DESCRIPTION UNfT
QUANTITY
I
QUANTITIES
INCREASE
DECREASE
PRICE
CONTRACT
CONTRACT
specified
PRICE
PRICE
4264
Furnish and install 8" x 6"
reducer, complete as
Each
11.01)
1.00
$192,00
specified
4300
Furnish and install 8"
sleeve, complete as
Each
1.00
1.00
$226.51
specified
Page 9 of 10
CONTRACT: 11 -07 CHANGE ORDER # 3
ITEM
N&MER
DESCRIPTION-
UNIT
CONTRACT
QUANTITY
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
UNIT
PRICE
INCREASEIN
CONTRACT.
PRICE
DECREASEIN
CONTRACT
PRICE
40000
Additional labor, materials,
and equipment to fix a
leaking joint on existing 8"
water main in the
Intersection of Custer
S u m
1.00
1.00
$1,236.25
Avenue and Grand Street,
per Invoice 11- 591 -01,
dated 7127111, complete as
s ecifred
ADDITIONAL. WORK: C.O. # 1 (ITEMS 4264.46000) - SUB -TOTAL $0.00 $0.00
NET INCREASE TO: SECTION IV $0.00
NET INCREASE TO SECTIONS I, 11, 111, IV $2,821.50
NET DECREASE TO SECTIONS I, II, Ili, IV ($0.37)
NET INCREASE TO CONTRACT: $2,821.13