Loading...
HomeMy WebLinkAbout05. 12-299 JUNE 12, 2012 12-299 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 12-17 TO J.F. AHERN CO. FOR VARIOUS WASTEWATER TREATMENT PLANT AND PUMPING STATION IMPROVEMENT PROJECTS ($817,800.00) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Wastewater Treatment Plant and Pumping Station Improvement Projects; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: J.F. AHERN COMPANY 855 Morris Street PO Box 1316 Fond du Lac, WI 54936 Total Bid: $817,800.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 551-1910-1799-00000 Sewer Utility Construction Work in Progress ( 0 OHKOJH ON 1HE WATER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Stephan M. Brand, Public Works Utility Bureau Manager DATE: June 6, 2012 RE: Award Bid for Public Works Contract No. 12 -17 for Various Wastewater Treatment Plant and Pumping Station Improvement Projects by J.F. Ahern Co. / $817,800.00 BACKGROUND This project includes equipment replacement and property improvements at the Wastewater Treatment Plant and various pumping stations as identified in the 2011 Capital Improvements Plan. Pumping station improvements include replacement of electrical panel and the addition of a back -up generator at the Sawyer Creek Lift Station that was originally constructed in 1992. Wastewater Treatment Plant work includes replacement of grit tank water control gates, the addition of control gates in the primary clarifiers, concrete repairs and protective coatings in the primary clarifiers, and replacement of baffles in the secondary clarifiers. ANALYSIS Bids were opened on June 5, 2012 with two contractors bidding on the project. This project included three bid alternates. The bids were reviewed with Strand Associates Inc, the project engineering consultant. The recommendation is to reject Bid Alternate One and Two and to accept Bid Alternate Three for the use of fiberglass instead of stainless steel on the clarifier baffles, which reduces the low bid price from J.F. Ahern of Fond du Lac, Wisconsin of $864,800.00 by $47,000.00 to $817,800.00. Strand Associates Inc. has also reviewed the contractor documentation and, based on this information and their previous experience in working with this contractor, have found them to be responsible. FISCAL IMPACT This project is included in the 2011 Capital Improvements Program under the Property Improvements and Equipment Sections (Sewer Utility Fund) and the necessary funding is available for this project. RECOMMENDATIONS 1 recommend award to J.F. Ahern Company of Fond du Lac in the amount of $817,800.00 for this project. Respectfully Submitted, Approved: S / eAd' Stephan M. Brand Mar A. Rohloff Public Works Utility Bureau Manager City Manager LT-ngineedng112 - 17 WWTP [Aft Slat A Plant [ mpAProject_ InformationlCorrespond ence4Nicmolt2 -]7 Memo fur Bid Award_6- 642,docx BID TABULATION Contract 12 -17 WWTP Lift Station & Plant Improvements 1 2 3 4 BIDDERS Bid Date: June 5, 2012 Bid Time: 10 am Name: Address: Address: Address: J F AHBRN CO 855 MORRIS ST PO BOX 1316 FOND DU LAC, WI 54936 AUGUST WINTER & SONS 2323 N ROEMER RD PO BOX 1896 APPLETON, WI 54912 Description Lump Sum Base Bid Lump Sum Base Bid Lump Sum Base Bid Lump Sum Base Bid 2012 Consolidated Treatment Plant & Pumping Station Improvement Pro'ects $ 864,800.00 $ 908,500.00 Supervisory System Supplier is: Instrument Control Systems Instrument Control Systems Lump Sum Base Bid $ 864,800.00 $ 908,500.00 $ Contract awarded on the amount of the base bid CERTIFIED CHE=CK/BID BOND ISOND I BOND CHECK/BOND ICHECKIBOND Sid Alternative No. 1 1 1 $ ( 36,000.00 $ 38,500.00 Bid Alternative No. 2 1 1 $ 205,000.00 $ 276,00 .00 Bid Alternative No. 3 1 1 $ ( 47,000.00 $ 80,000.00 TOTAL FOR AWARD $ 817,800.00 Award Total includes Lump Sum Base Bid and Bid Alternate No. 3