JUNE 12, 2012 12-298 RESOLUTION
(CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 12-10 TO
AUGUST WINTER & SONS, INC. FOR WATER FILTRATION PLANT
CHEMICAL AND ELECTRICAL SYSTEM IMPROVEMENTS
($897,100.00)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids for Water
Filtration Plant Chemical and Electrical System Improvements; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following is
the most advantageous bid:
AUGUST WINTER & SONS, INC.
2323 N. Roemer Road
PO Box 1896
Appleton, WI 54912-1896
Total Bid: $897,100.00
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same, all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 541-1810-1799-00000 Water Utility Construction Work in Progress
( 0
OMKOH
ON THE WATER
MEMORANDUM
TO: Honorable Mayor and Members of the Common Council
FROM: Stephan M. Brand, Public Works Utility Bureau Manager
DATE: June 6, 2012
RE: Award Bid for Public Works Contract No. 12 -10 for Water Filtration Plant Chemical and
Electrical System Improvements Projects by August Winter & Sons, Inc. 1 $897,100.00
BACKGROUND
This project includes replacement of Water Filtration Plant chemical feed systems and electrical
equipment that has reached its useful life and was included in the 2011 Capital Improvements Plan.
Chemical feed equipment includes the alum feed system and the second phase of replacement of the
chlorine and ammonia system. Electrical improvements include replacement of variable frequency drives
on backwash water pumps and the plant uninterruptable power supply (UPS) that powers the computer
control system during power outages until the back -up generators come on line.
ANALYSIS
Bids were opened on June 5, 2012 with two contractors bidding on the project. The bids were reviewed
by our consultant, CH2M Hill Engineers, Inc., and the recommendation is to reject the Bid Alternate for
extended warranty on the UPS and award the low bid to August Winter & Sons of Appleton, Wisconsin in
the amount of $897,100.00.
FISCAL IMPACT
This project is included in the 2011 Capital Improvements Program under the Property Improvements and
Equipment Sections (Water Utility Fund), and the necessary funding is available for this project.
RECOMMENDATIONS
recommend award to August Winter & Sons, Inc. of Appleton in the amount of $897,100.00 for this
project.
Respectfully Submitted, Approved:
Stephan M. Brand Mark A. Rohloff
Public Works Utility Bureau Manager City Manager
1:Mngineering112 -10 WFP Chem R Eiect Spst TmprlProject_ rnfor€ nalionlCo € €espondence\Nlemo112 -10 Memo for Did Award 6.6- 12.dmx
BID TABULATION Contract 12 -10
Water Filtration Plant Chemical and
Electrical System Improvements 1 2 3
4
BIDDERS Name:
August Winter & Sons, Inc.
J F AHERN CO
Address:
2323 N Roemer Rd
855 MORRIS STREET
Address.
PO Box 1896
PO BOX 1316
Bid Date: June 5, 2012 Address:
Appleton, WI 54912 -1896
FOND DLJ LAC WI 54936
Bid Time: 10 am
Description
Unit Quantity
Amount
Amount
Amount
Amount
Base bid: For the entire work
outlined in these documents,
Lump 1
complete as specified.
Sum
$ 867,100.00
$ 878,000.00
Lump
1
Project Contingency Allowance
Sum
$ 30,000.00
$ 30,000.00
Optional Adder: Extended
Service Agreement. Provide
extended service for the Plant
Lump 1
uninterruptible power supply
beyond the five -year agreement
for a total of ten years.
$ 16,500.00
$ 16,300.00
TOTAL
$ 913,600.00
$ 924,300.00
CERTIFIED CHECKIBID BOND
Bond
Bond
CHECKIBOND
CHECK/BOND
TOTAL FOR AWARD 1 1 $ 897,100.00
Award total includes Base bid and Contin enc Allowance