Loading...
HomeMy WebLinkAbout17. 12-262 MAY 22, 2012 12-262 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID TO LUNDA CONSTRUCTION FOR WM. STEIGER PARK RIVERWALK IMPROVEMENTS ($973,411.70) INITIATED BY: COMMUNITY DEVELOPMENT WHEREAS, the City of Oshkosh has heretofore advertised for bids for construction of a bike/pedestrian riverwalk on the south side of the Fox River, in Wm. Steiger Park; and WHEREAS, upon the opening and tabulation of bids it appears that the following is the most advantageous bid: Lunda Construction 2000 Taylor Street Little Chute, WI 54140 TOTAL BASE BID $940,295.35 ALTERNATE 1 33,116.35 TOTAL BID $973,411.70 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that said partial base bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 534-1040-7216-07280 TID #20 Fund – Land Improvements etCoy Oshkosh Community Development Department 215 Church Ave.,PO Box 1130 Oshkosh,WI 54901 OiHKOIH (920)223366--55005539 FAX ON THE WATER http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Allen Davis, Community Development Director DATE: May 17, 2012 SUBJECT: Southshore Riverwalk— William A. Steiger Park, Ohio Street to 4th, Bid Award BACKGROUND The City has designed and solicited bids for the first phase of construction of the south shore portion of the proposed river walk. This portion of the Riverwalk is designed to avoid the existing fishing structures near the City fishing pier. The project includes the standard riverwalk with benches and lighting from Ohio to the fishing pier. In addition, the project also includes redecking and lighting the City fishing pier to match the Riverwalk design. The project also includes shoreline clean-up and improvements by removing foreign structures from the river edge and river bottom and replanting native vegetation. The alternate bid is for the installation of an asphalt trail along the east side of Michigan St. from the City fishing pier south to 4th Ave. in order to connect the Riverwalk to the residential neighborhood to the south. The next phase of the south shore Riverwalk is planned for the Boatworks property in 2013. ANALYSIS The City has obtained the following grants for the project: • $ 320,000.00 from WisDNR Urban Rivers Grant • $ 222,255.00 from WisDNR Local Parks Development Grant $542,255.00 Total Grant funding These grants require a City match. The City matching funds are planned to be financed by Tax Increment Finance (TIF) #20. It is planned that future development will pay the local match for the WisDNR grant funds. As indicated on the attached memo, the City received one bid. Three potential bidders attended the pre-bid meeting. The City awarded Lunda Construction the City Center segment of the Riverwalk on the north shore this spring. As the attached bid tabulation indicates,the base bid from Lunda Construction is $940,295.35. In addition, Lunda's alternate bid for the asphalt extension to 4th Avenue is $33,116.35 for a total bid of$973,411.70. It is believed that the bid is consistent with costs in the other Riverwalk segments. RECOMMENDATION The City Council awards the base and alternate bids for a total of$973,411.70 for the William Steiger Park riverwalk to Lunda Construction. FISCAL IMPACT The City 2012 CIP has allocated $2,410,000.00 in City funds and $500,000 in grant funds for a total of$2,910,000 for William Steiger Park development. This Riverwalk portion of the Steiger Park project including lighting, landfill fees and engineering fees will total about$1,300,000. The balance of the CIP funds will be used in the next phase of development of Steiger Park including the Boatworks property. Approved, / a --'—.gam City Manager AECOM AECOM 920.235.0270 tel / {� 558 North Main Street 920.235.0321 fax Oshkosh,Wisconsin 54901 Memorandum To City of Oshkosh Page 1 CC Allen Davis Subject Recommendation of Contractor Selection for William Steiger Park Riverwalk.AECOM Project No. 60240937 From Paul F. Timm,AECOM Date May 17,2012 AECOM has completed a review of the bid received for the William Steiger Park Riverwalk. The bidding process followed the municipal advertising requirements. A mandatory prebidding meeting was conducted that had three qualified general contractors attend. Although only one bid was submitted, it is our opinion the Lunda bid was competitively generated. AECOM recommends the City of Oshkosh consider retaining Lunda Construction Co. for the construction of the William Steiger Park Riverwalk. AECOM's review of the bid dated May 15, 2012, finds the rates consistent with previous constructed Riverwalks. By retaining the same contractor for William Steiger Park Riverwalk there is potential for reduced contractor coordination and an increased construction efficiency and consistency. In addition, Lunda's quality of work on the Marion Zone Riverwalk Docks project was excellent. Therefore,AECOM recommends the City of Oshkosh consider awarding the contract to Lunda Construction Co. Sincerely yours Paul F. Timm AECOM Construction Manager To enhance and sustain the world's built,natural and social environments K:1Projects160240937 Stieger Park DesignCM17.0 DELIVERABLES\Lunda Recommendation for Seiger Park.docx WM. STEIGER PARK RIVERWALK BIDS OPENED MAY 15, 2012 1:30 PM NAME OF Lunda Construction BIDDER 2000 Taylor Street Little Chute, WI 54140 BASE BID TOTAL 940,295.35 ALT 1 Asphalt Pathway 33,116.35 Extension ADDENDUM yes BID BOND / BB CHECK