Loading...
HomeMy WebLinkAbout06. Noise Variance/Radtke Contractors TICE Site Development • Construction •Bridge Construction Pile Driving Design •Permitting CONTRACTORS Inc. Road Building •Earth Moving Snow Removal Railroad Work 6408 Cross Road • Winneconne, Wisconsin 54986 Telephone: 920-582-4114 • Fax: 920-582-4441 • Website: RadtkeContractors.com Dave Patek Department of Public Works City of Oshkosh 215 Church Ave Oshkosh, WI 54903 Re: Wisconsin Department of Transportation Region Wide Deck Sealing Project Dear Mr. Patek: Radtke Contractors is in need of a noise variance for a Wisconsin Department of Transportation bridge deck sealing project that includes bridges located in the City of Oshkosh. The locations, dates and times we will be performing work on each of these structures is detailed below. The time that we are on each structure is going to depend on weather because the amount of time on each will be greatly influenced by the drying conditions on any given night. Our schedule may vary from the one that I give you by a week if we were to be rained out on days previous to doing the work on the City of Oshkosh bridges and could be as much as a week ahead if we would get great drying weather before we qet to the Oshkosh bridges. I would like to request a range in dates from June 4th to June 22" and I will keep you updated as we move thru the schedule and get closer to doing the work on the City of Oshkosh bridges. If you have any questions or concerns on this, my contact information is below and the foreman in charge of this project for Radtke Contractors is Dennis Korn and his cell phone # is (920)410-4619. The work we will be doing will consist of setting up of traffic control separately on each bridge structure. Once the traffic controller has the lane closure completed, my foreman will have a crew come thru with blowers and blow the dust and dirt off of the bridge deck to ready it for sealing. Once the deck is cleaned, the trucks will come in and spray the sealer on the deck, parapet, sidewalk, and median. The sealer will then take some time to dry and then the traffic controller will switch the lane closer to the other side (if a two lane road) or switch traffic to opposite lanes (if a 4 lane road). Our foreman will then come back and blow the deck off and complete the same process. Once the sealer is dry, the traffic controller will then remove the lane closure and we will be finished with that structure. List of Structures and Times: June 11, 2012 B-70-200 (STH 26-USH 41) 8:00 PM thru 2:00 AM "An Equal Opportunity Employer" B-70-138 (STH 44 — USH 41) 9:00 PM thru 4:00 AM June 12, 2012 B-70-103 (USH 45 —Weyhurst Creek 5:00 PM thru 11:00 AM B-70-56 (USH 45 (Main Street) Fox River) 5:00 PM thru 2:00 AM (multiple lane closures) B-70-212 and B-70-213 (USH 45 SB and NB — Slough Creek) 8:00 PM thru 2:00 AM (These two are in Town of Oshkosh) June 13, 2012 B-70-011 (Local (USH 45) Fox River) 6:00 PM thru 12:00 Midnight B-70-091 (STH 21 (Congress Ave.)) 6:00 PM thru 1:00 AM B-70-211 (West Frontage Rd. — Slough Creek) 8:00 PM thru 3:00 AM (Town of Oshkosh) B-70-214 (USH 45 — CTH T) 9:00 PM thru 4:00 AM (Town of Oshkosh) June 14, 2012 B-70-247 (STH 44 (Wisconsin St.) Fox River) 6:00 PM thru 6:00 AM (Multiple lane closures) Thank you, Brian Much Project Manager: Bridge Division Radtke Contractors 6408 Cross Rd. Winneconne, WI 54986 Office #: (920)582-4114 Cell #: (920)410-9746 "An Equal Opportunity Employer"