HomeMy WebLinkAbout45. 12-214 APRIL 24, 2012 12-160 12-214 PENDING APRIL 10, 2012 RESOLUTION (CARRIED___7-0___LOST______LAID OVER_______WITHDRAWN_____) PURPOSE: APPROVE & SUBMIT STORM WATER PROGRAM ANNUAL REPORT INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the Storm Water Program Annual Report, having been reviewed, is approved, and the proper City officials are authorized and directed to submit the Report to the Department of Natural Resources. ( 0 off -KOf H ON THE WATER MEMORANDUM DATE: TO: FROM: RE: BACKGROUND April 5, 2012 Honorable Mayor and Members of the Common Council James E. Rabe, Civil Engineer 11 Wisconsin Department of Natural Resources Municipal Separate Storm Sewer System Annual Report The City of Oshkosh received coverage under the Wisconsin Department of Natural Resources (WDNR) Municipal Separate Storm Sewer System (MS4) General Permit on January 2, 2007. This permit requires the City to comply with the following six minimum control measures (as mandated by the Federal Clean Water Act and the Environmental Protection Agency): 1. Public Information and Education Plan 2. Public Involvement and Participation Program 3. Illicit Discharge Detection and Elimination Program (including new or revised ordinances) 4. Construction Site Pollutant Control Program (including new or revised ordinances) 5. Post- Construction Storm Water Management Program (including new or revised ordinances) 6. Pollution Prevention Program (Prevent pollution from the daily operations of the City) The Storm Water Utility Committee reviewed the Annual Report and recommended approval as discussed during their March 29, 2012 meeting. ANALYSIS The annual report contains information on the activities performed by the City of Oshkosh in compliance with the MS4 Permit requirements. This report includes summary outputs from the City's MS4 Permit Tracking Software (ASIST) and a completed WDNR form. City staff has more details available for the WDNR, should they be requested. FISCAL IMPACT There is no anticipated fiscal impact from the approval of this resolution. RECOMMENDATION Staff recommends approval of the resolution. mitted, James E. Rabe, P.E. Civil Engineer it JERltlt Approved: Mark A. Rohloff City Manager ElEnginecr nglSlorm Water InrormationWIS4 Permit IlemskDNR Submiltals=l l Annual Report\2011 Annual Report Council Memo 12.docx Page I of I State of Wisconsin Annual Report under MS4 Department of Natural Resources dnr.vri.gov General Permit No. WI- SO50075 -1 Form 3400 -195 (R 01!12) Page 1 of 10 Due by March 31, 2012 Notice: Pursuant to s. NR 216.07(8), Wis. Adm. Code, an owner or operator of a Municipal Separate Storm Sewer System (MS4) is required to submit an annual report to the Department of Natural Resources (DNR) by March 31 of each year to report on activities for the previous calendar year. This form is being provided by the DNR for the users convenience. Personal information collected will be used for administrative purposes and may be provided to the extent required by Wisconsin's Open Records Law Iss. 19.31 - 19.39, Wis. Stats.]. This form is for reporting on activities underlaken in calendar year 2011. Instructions: Complete each section of the form that follows. If additional space is needed to respond to a question, attach additional pages. Provide descriptions that explain the program actions taken to comply with the general permit. Complete and submit the annual report by March 31, 2012, to the appropriate address indicated on the last page of this form. SECTION L. al Information Name of Municipality Facility p Y y lD No. (FIN) City of Oshkosh 31078 Mailing Address City State Postal Code 215 Church Avenue Oshkosh WI 54903 -1130 PO Box 1130 County(s) in which Municipality is located Type of Municipality: (check one) Winnebago ❑ County ® City ❑ Village ❑ Town ❑ Other (specify) Name of Municipal Contact Person James Rabe, PE, CPESC Mailing Address 215 Church Avenue PO Box 1130 jrabe@ci.oshkosh.wi.us City Oshkosh Title Civil Engineer 11 State Postal Code WI 1 54903 -1130 elephone No. (include area code) Fax No. (include area 920- 236 -5065 1 920 - 236 -5068 I hereby certify that f am an authorized representative of the municipality covered under MS4 General Permit No. WI- S050075 -1 for which this annual report is being submitted and that the information contained in this document and all attachments were gathered and prepared under my direction or supervision. Based on my inquiry of the person or persons under my direction or supervision involved in the preparation of this document, to the best of my knowledge, the information is true, accurate, and complete. I further certify that the municipality's governing body or delegated representatives have reviewed or been apprised of the contents of this annual report. t understand that Wisconsin law provides severe penalties for submitting false information. Authorized Representative Printed Name Mark Rohloff Authorized Representative City Manager orized Representative Signature E -mail Address mrohloff @ci.oshkosh.wi.us on Date Signed elephone No. (include area code) 920- 236 -5000 Fax No. (include area 920 - 236 -5039 Annual Report sander MS4 General Permit No. WI- SO50075 -9 Form 3400 -195 (R01/12) Page 2 of 10 . SECTION IV. General lnformatlon. a. Describe what efforts the municipality has undertaken to invite the municipal governing body, interest groups, and the general public to review and comment on the annual report. The Annual Report has been posted on the City's Storm Water Utility Webpage, and has been reviewed and approved at public meetings of the Storm Water Utilility Committee and the Common Council. The general public, in addition to members of interest groups and the elected official have the opportunity to comment at any of these meetings, as well as arrange a meeting with the Department of Public Works staff to discuss comments. b. Describe how elected and municipal officials and appropriate staff have been kept apprised of the municipal storm water discharge permit and its requirements. Elected officials are kept apprised of the MS4 Permit and it's requirements through Common Council workshops. Staff are kept apprised during routine conversations and staff meetings when necessary. c. Has the municipality prepared its own municipal -wide storm water management plan? ® Yes ❑ No If yes, title and date of storm water management plan: City of Oshkosh Citywide Stonr►water Management Plan and Ordinance Development - December 2008 d. Has the municipality entered into a written agreement with another municipality or a contract with another entity to perform one or more of the conditions of the general permit as provided under Section 2.10 of the general permit? ❑ Yes ® No If yes, describe these cooperative efforts: The City of Oshkosh is currently in the process of developing Inter - Agency Agreements with Winnebago County and The University of Wisconsin - Oshkosh. e. Does the municipality have an internet website? ® Yes ❑ No If yes, provide web address: www.cLoshkosh.wi.us If the municipality has an internet website, is there current information about or links provided to the MS4 general permit and /or the municipality's storm water management program? M Yes ❑ No If yes, provide web address: www.ci.oshkosh.wi.us/Public—Works/Storm—Water—Utility.htm Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400 -195 (R01112) Page 3 of 10 SECTION W Permit Conditions a. Minimum Control Measures For each of the permit conditions listed below, provide a description of the status of implementation of program elements, the status of meeting measurable goals, and compliance with permit schedule in section 3 of the MS4 general permit. Provide an evaluation of program compliance with the general permit, the appropriateness of identified best management practices, and progress towards achieving identified measurable goals. Be specific in describing the actions that have been taken during the reporting year to implement each permit condition and whether measurable goals have been met, including any data collected to document a measurable goal. Atso, explain the reasons for any variations from the compliance schedule in the MS4 general permit. • Public Education and Outreach See attached summary report. • Public Involvement and Participation See attached summary report. • Illicit Discharge Detection and Elimination See attached summary report. • Construction Site Pollutant Control See attached summary report. • Post - Construction Storm Water Management See attached summary report. • Pollution Prevention See attached summary report. b. Storm Water Quality Management Has the municipality completed a pollutant - loading analysis to assess compliance with the 20% TSS reduction developed urban area performance standard? N Yes ❑ No If yes, provide the following: Model used WinSLAMM Version 9.2.5 Reduction ( %) 17.3% If no, include a description of any actions the municipality has undertaken during 2011 to help achieve the 20% standard. Has the municipality completed an evaluation of all municipal owned or operated structural flood control facilities to determine the feasibility of retrofitting to increase TSS removal? N Yes ❑ No If yes, describe: All municipally owned flood control structures that have the capability to provide TSS removal have been constructed to provide TSS control.. c. Best Mana ement Practices Maintenance: Does the municipality have a maintenance program for Installed storm water best management practices? N Yes ❑ No If yes, describe the maintenance program. If available, attach any additional information on the maintenance program. The City of Oshkosh Streets Division inspects the storm water BMP's after each major rain event. These inspections look for any evidence of damage, plugging or other concerns. Any deficiencies noted are repaired as quickly as possible. Engineering Division Staff inspect each storm water BMP annually. These inspections focus on potential structural damage to the facility due to erosion, rodents, vandalism, or other causes. Any deficiencies noted are repaired as quickly as possible. In the case of rodent damage, the site is then evaluated for potential actions to reduce the rodent population. Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400 -195 (R 01112) Page 4 of 10 d. Storm Sewer System Map Describe any changes or updates to the storm sewer system map made in the reporting year. Provide an updated map if any changes occurred during the reporting year.MS4 Maps were updated to reflect construction activities that took place during 2010. Updated maps are included with this submittal. Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400 -195 (R01/12) Page 5 of 10 `.SECTION VI: ` Fiscal Analysis a. Provide a fiscal analysis that includes the annual expenditures for 2011, and the budget for 2011 and 2012. A table to document fiscal information is provided on page 6. b. What financing /fiscal strategy has the municipality implemented to finance the requirements of the general permit? . ® Storm water utility ❑ General fund ❑ Other c. Are adequate revenues being generated to implement your storm water management program to meet the permit requirements? ® Yes ❑ No Please provide a brief summary of your financing /fiscal strategy and any additional information that will assist the Department in understanding how storm water management funds are being generated to implement and administer your storm water management program. The Storm Water Utility Rates are evaluated annually to determine if a rate increase is needed in order to ensure adequate funds are available to continue funding the projects identified in the Capital Improvement Program, and maintain all facilities in an appropriate manner. ;SECTION VII.Aris :ecttons and Enforcement Actions Note: If an ordinance listed below has previously been submitted and has not been amended since that time, a copy does not need to be submitted again. If the ordinance was previously submitted, indicate such in the space provided. a. As of the date of this annual report, has the municipality adopted a construction site pollutant control ordinance in accordance with subsection 2.4.1 of the general permit? ❑ Yes ® No If yes, attach copy or provide web link to ordinance: As an Agent Municipality of the Department of Commerce, the City of Oshkosh enforces the requirements of NR 216 on all commercial projects, and the requirements of the Uniform Dwelling Code on all residential projects. b. As of the date of this annual report, has the municipality adopted a post - construction storm water management ordinance in accordance with subsection 2.5.1 of the general permit? ❑ Yes ® No If yes, attach copy or provide web link to ordinance: The City of Oshkosh first adopted a Storm Water Management Ordinance in 1990. We are currently working on revising this ordinanace to meet the requirements of Section 2.5.1 of the MS4 Permit. http:/Avww.el.oshkosh.wi.us/Municipal The storm water management portion of this section starts with Section 24 -7. c. As of the date of this annual report, has the municipality adopted an illicit discharge detection and elimination ordinance in accordance with subsection 2.3.1 of the general permit? ❑ Yes ® No If yes, attach copy or provide web link to ordinance: d. As of the date of this annual report, has the municipality adopted any other ordinances it has deemed necessary to implement a program under the general permit (e.g., pet waste ordinance, leaf managementlyard waste ordinance, parking restrictions for street cleaning, etc.)? ® Yes ❑ No If yes, attach copy or provide web link to ordinance: The City of Oshkosh has had a parking restriction ordinance in place for many years. A copy of this ordinance can be found at: Annual Report under MS4 General Permit No, WI- SO50075 -1 Form 3400 -195 (R 01112) Page 6 of 10 http:/A&ww.ci.oshkosh.wi.us/Munic'ipal The City of Oshkosh Health Codes cover pet waste. Specifically, section 6 -9 covers pet waste littering. A copy of this ordinance can be found at: http :lAvww.ci.oshkosh.wi,us /Municipal — Codes /Chapter OB.P ©F e. Provide a summary of available information on the number and nature of inspections and enforcement actions conducted during the reporting period to ensure compliance with the ordinances described in a. to d. above. See attached summary report. Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400.195 (R 01112) Page 7 of 10 SECTION,VIII.`> Water. QUalit Concerns ; a. Does any part of the MS4 discharge to an outstanding resource water (ORW) or exceptional resource water (ERW) listed under s. NR 102.10 or 102.11, Wis. Adm. Code? (A list of ORWs and ERWs may be found on the Department's Internet site at: http://dnr.wi.gov/orn/water/wmhvqs/0rwerw/) []Yes O No If yes, list: b. Does any part of the MS4 discharge to an impaired waterbody listed in accordance with section 303(d)(1) of the federal Clean Water Act, 33 USC § 1313(d)(1)(C)? (A list of the most current Wisconsin impaired waterbodies may be found on the Department's Internet site at: htlp. 1/ dnr. wi. gov/ orcr /water/wm/was /303d /303d.html) ® Yes ❑ No If yes, complete the following: • Impaired waterbody to which the MS4 discharges: Lake Winnebago, Fox River, Lake Butte des Morts • Description of actions municipality has taken to comply with section 1.5.2 of the MS4 general permit for discharges of pollutant(s) of concern to an impaired waterbody: Fox River: Listed for PAHs. There are no current discharges that would contibute to this pollutant. Lake Butte des Mertes: Listed for Mercury, PCBs, Sediment, and Phosphorus. Mercury is atmospheric deposition, which the City cannot implement a means to reduce. PCBs are no longer used in industrial processes along the river, and thus there are no longer discharges that would contribute to this pollentant. Sediment is being addressed on a City Wide basis, as required by the MS4 Permit. Phosphorus reductions will be associated with the reduction in sediment on a City Wide basis. Phosphorus is being addressed under the I &E plan to get residents to reduce the use of phosphorus. Until such time as a TMDL is prepared for the Upper Fox River Basin, it would be inappropriate to attempt to formulate a plan to reduce phosphorus. Lake Winnebago: Listed for Mercury, Sediment, and Phosphorus. Mercury is atmospheric deposition, which the city Gannet implement a means to reduce. Sediment is being addressed on a City Wide basis, as required by the MS4 Permit. Phosphorus reductions will be associated with the reduction in sediment on a City Wide basis. Phosphorus is being addressed under the I &E Plan to get residents to reduce the use of phosphorus. Until such time as a TMDL is prepared for the Upper Fox River Basin, it would be inappropriate to attempt to formulate a plan to reduce phosphorus. c. Identify any known water quality improvements in the receiving water to which the MS4 discharges during the reporting period. None Known d. Identify any known water quality degradation in the receiving water to which the MS4 discharges during the reporting period and what actions are being taken to improve the water quality in the receiving water. None Known _SECTION IX.- Propoised Probram Chang";: a. Describe any proposed changes to the storm water management program being contemplated by the municipality for 2012 and the schedule for implementing those changes. Proposed program changes must be consistent with the requirements of the Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400 -195 (R 03/12) Page & of 10 general permit. Annual Report under MS4 General Permit No. WI- SO5O075 -1 Form 3400 -195 (R 01112) Page 9 of 10 Fiscal Analysis Table. Complete the fiscal analysis table provided below. Program Element Annual Expenditure Budaet SnurnP of Ftinrlc 2011 2011 2012 $ 44,910.49 $ 50,970 $ 48,565 Storm Water Utility Fund Public Education and Outreach $ 44,910.49 $ 50,970 $ 48,565 Storm Water Utility Fund Public Involvement and Participation $ 153,002.27 $ 173,340 $191,760 Storm Water Utility Fund Illicit Discharge. Detection and Elimination $ 111,006.74 $ 136,650 $ 129,630 Storm Water Utility Fund Construction Site Pollutant Control $164,788.32 $ 202,490 $190,700 Storm Water Utility Fund Post - Construction Storm Water Management $ 892,156.26 $1,009,950 $ 1,163,795 Storm Water Utility Pollution Prevention Wastewater Utility Water Utility General Fund Storm Water Quality $ 138,811.14 $ 156,810 $ 162,390 Storm Water Utility Fund Management (including pollutant - loading analysis) Storm Sewer System Map $ 26,890.79 $ 32,920 $ 30,535 Storm Water Utility Fund Other $ 436,355.94 $ 471,100 $ 479,560 Storm Water Utility Fund Annual Report under MS4 General Permit No. WI- SO50075 -1 Form 3400 -195 (R 01112) Page 10 of 10 Ashland Langlade DNR Service Center Adams Marathon DNR Service Cantor Barron Lincoln 1701 N. 4th Street Buffalo Monroe 5301 Rib Mountain Rd. Bay€ield Oneida Superior, WI 54880 Clark Portage Wausau, WI 54401 Burnett Polk Phone: (715) 392 -7988 Crawford Trempealeau Phone: (715) 359 -4522 Douglas Price Jackson Vernon Florence Rusk Juneau Wood Forest Sawyer La Crosse Iron Taylor Vilas Washburn I Chippewa Pepin DNR Service Center Dunn Pierce 890 Spruce St. Eau Claire St. Croix Baldwin, WI 54002 Phone: (715) 684 -2914 brown Marquette UNR Northeast Region Columbia Jetterson UNK South Central Region Calumet Menominee 2984 Shawano Ave. Dane LaFayette 3911 Fish Hatchery Rd. Door Oconto Green Bay, WI 54313 Dodge Richland Fitchburg, WI 53711 Fond du Lac Outagamie Phone: (920) 662 -5100 Grant Rock Phone: (608) 275 -3266 Green Lake Shawano Green Sauk Kewaunee Waupaca Iowa Manitowoc Waushara Marinette Winnebaao rcenosna SneDoygan UNK tiervice tenter Milwaukee Walworth 141 NW Barstow Street, Ozaukee Washington Room 180 Racine Waukesha Waukesha, WI 53188 (262) 574 -2100 Stormwater Program report This report covers activities that occurred between the following dates: For questions regarding this report contact: 11'112011 to 1213112011 James Rabe 215 Church Avenue, PO Box 1130 1.Operator Name: •.- Mark Rohloff 2. Operator Title: City Manager 3. Represented Entity: City of Oshkosh 4. Mailing Address: 215 Church Avenue, PO Box 1130 S. Mail City, State, .Zip: Oshkosh, WI 54903 -1130 6. Phone Number: (920) 236 -5000 7. E -Mail Address: Mrohloff @ci.oshkosh.wi.us 6. Co- permitting With: 9. Population: 62,916 Households: 27,650 Area (sq mi): 24 10. Official Website; http: / /www.ei.oshkosh.wi.us/ Date Report Prepared: 3123/2012 Oshkosh, Wt 54903 -1130 Public Information, Education and Outreach Details of BMPs which had work performed for them 2U99'Common Counci P l Worksho s . Responsible Party: James Rabe, Civil Engineer 11 Start Date: 1/9/2011 End Date: 12/31/2011 Has Goal Been Accomplished: Work performed for the BMP listed above Date: 1011112019 Responsible Party: James Rabe, Civil Engineer ll Public Education - Libbey / Nicolet Watersheds Type: Common Council Workshop Event Name: Libbey / Nicolet Watersheds Cost: 0.00 Volunteers: 0 Number Attending: 30 Focus: Present the results of the Libbey & Nicolet Watersheds to the Common Council. Description: Mr. Bachhuber (AECOM) and Mr Common Council. The topics presented included: Project Goals Project Area Description Existing Conditions Alternative Evaluation Recommended Alternative Phased Implementation Discussion How was the event sponsored ?: Rabe presented the results of the watershed analysis to the :Med[a Relations Prpgrams ' Responsible Party. Jaynes Rabe, Civil Engineer 11 Start Date: 1/2/2007 End Date: 12/39/2011 Has Goal Been Accomplished: Work performed for the BMP listed above . Date: 9/94/2091 Responsible Party: James Rabe, Civil Engineer// Public Education - WOSH Type: Radio Interview Dame of Source: WOSH Cost: 0.00 Audience: 0 Delivery Source: Radio Message: Interview lasted approximately 5 minutes. Mr. Rabe gave a short overview of the major stormwater related projects scheduled for construction in 2011. Comments: Mr. Rabe was interviewed on air by WOSH Radio morning show. Mr. Rabe provided a brief update on the Stormwater Management Projects scheduled for construction in 2011. tVteetin'gs with General Pus1rc .. - -- nnunn nunnJ Responsible Party: James Rabe, Civil Engineer Il Start Date: 3/15/2012 End Date: 3/16/2012 Has Goal Been Accomplished: Work performed for the BMP listed above .. CIMIA�'IIAIIIA� Date: 121212011 Responsible Party: James Rabe, Civil Engineer 11 Public Education - Bernheim Drainage Issues Type: Neighborhood Meeting Event Name: Bernheim Drainage Issues Cost: 0.00 Volunteers: 0 Number Attending: 6 Focus: Discuss neighborhood drainage issues. Description: City Manager Rohloff and Mr. Rabe met with residents in the Bernheim Street area to discuss drainage issues affecting several of the neighbors. Mr. Rabe will have a survey crew come out to survey ground elevations in several yards in an effort to help the neighborhood address grading and drainage issues that are impacting several properties. After the survey - is complete, Storm Water Staff will continue to work with the property owners to develop a plan to help with the drainage issues. How was the event sponsored ?. Publia,lnformationat Mee,'irigs, Responsible Party: James Rabe, Civil Engineer// Start Date: 1/212007 End Date: 12131/2011 Has Goal Been Accomplished: Work performed for the BMP listed above Date: 51912011 Responsible Party: James Rabe, Civil Engineer 11 Public Education - Westfield Street Bridge Public Information Meeting Type: Public Information Meeting Event Name: Westfield Street Bridge Public Information Meeting Cost: 0.00 Volunteers: 0 Number Attending: 2 Focus: Present the design concept for the replacement of the Westfield Street Bridge over Sawyer Creek. Description: Mr. Yentz (Strand Associates) presented information relating to the Sawyer Creek Watershed and the Westfield Street Bridge Replacement Project. Topics discussed included: Sawyer Creek Watershed Existing Bridge Upstream and Downstream Bridges Proposed Bridge Proposed Bridge Features Schedule Opinion of Construction Costs Future Improvements Discussion How was the event sponsored ?: Date: 61112011 Responsible Party. James Rabe, Civil Engineer II Public Education - Westhaven Clubhouse Area Detention Basin Type: Public Information Meeting Event Name: Westhaven Clubhouse Area Detention Basin Cost: 0.00 Volunteers: 0 Number Attending: 17 Focus: Present information regarding the proposed Oshkosh North High School Area Detention Basins project to the general public. Description: Mr. Rabe presented information regarding the Campbell Creek Watershed analysis as it related to the construction of the Westhaven Clubhouse Area Detention Basin. The presentation included information regarding: Watershed Characteristics Purpose of the Project Detention Basin Design Parameters Discussion How was the event sponsored ?: Date: 61612011 Responsible Party: James Rabe, Civil Engineer!! Public Education - Patriot Lane Residential Drainage Issues Type: Neighborhood Meeting Event Name: Patriot Lane Residential Drainage issues Cost: 0.00 Volunteers: 0 Number Attending: 24 Focus: Discuss the drainage issues being experienced within the neighborhood and help neighbors understand what needs to be corrected. Description: Mr. Rohloff, Mr. Gohde, and Mr. Rabe met with the neighborhood to discuss the history of the drainage issues that have cause flooding to some residents. Information was presented to the neighborhood relating to survey work that the City had performed, and how the grading did not comlpy with the approved Drainage and Grading Plan. Mr. Rabe presented a couple alternatives that the neighborhood could discuss to correct the drainage issues. Representatives from the Developer were also present, After the meeting, the Developer and the neighborhood agreed to work together to correct the drainage issues. How was the event sponsored ?: Date: 1012612011 Responsible Party: James Rabe, Civil Engineer f! Public Education - Sawyer Creek Channel Improvements Public Information Meeting Type: Public Information Meeting Event Name: Sawyer Creek Channel Improvements Public Information Meeting Cost: ©. ©0 Volunteers: 0 Number Attending: 38 Focus: Present overview of Sawyer Creek Watershed Analysis as it pertains to the proposed Channel Improvements Project along Sawyer Creek from North Koeller Street to the Fox River. Description: Mr. Yentz (Strand Associates) presented information relating to the Sawyer Creek Watershed and the Sawyer Creek Channel Improvements Project. Topics discussed included: Sawyer Creek Watershed Existing Channel Characteristics Project Limits Proposed Improvements - Channel Proposed Improvements - Invasive Plant Removal Proposed Improvements - Fish Habitat Proposed Improvements - Canoe Access Proposed Improvements - Slope Stabilization Proposed Dredging Features 2092 Construction Schedule Opinion of Construction Cost Discussion How was the event sponsored ?: Public Participation and Involvement Details of BMPs which had work performed for them City. Website IIgIYI III IIIIIIIII YI ^ Responsible Party: James Rabe, Civil Engineer Start Date: 5/2712008 End Date: 12131/2011 Has Goal Been Accomplished: NO Work performed for the BMP listed above Date: 92/37/2019 Responsible Party: James Rabe, Civil Engineer 11 2011 Maintain City Storm Water Website Mr. Rabe works with Jason Kunkle (Information Technology) throughout the year to post pertinent information to the City of Oshkosh Storm Water Website. Weetings with the General;Public `- s Responsible Party: James Rabe, Civil Engineer It Start Date: 1/112007 End Date: 12/31/2011 Has Goal Been Accomplished: NO Work performed for the BMP listed above Date: 51912011 Responsible Party: James Rabe, Civil Engineer 11 Public Education - Westfield Street Bridge Public Information Meeting Type: Public Information Meeting Event Name: Westfield Street Bridge Public Information Meeting Cost: 0.00 Volunteers: 0 Number Attending: 2 Focus: Present the design concept for the replacement of the Westfield Street Bridge over Sawyer Creek. Description: Mr. Yentz (Strand Associates) presented information relating to the Sawyer Creek Watershed and the Westfield Street Bridge Replacement Project. Topics discussed included: Sawyer Creek Watershed Existing Bridge Upstream and Downstream Bridges Proposed Bridge Proposed Bridge Features Schedule Opinion of Construction Costs Future Improvements Discussion How was the event sponsored ?: Date: 61112011 Responsible Party: James Rabe, Civil Engineer 11 Public Education - Westhaven Clubhouse Area Detention Basin Type: Public Information Meeting Event Name: Westhaven Clubhouse Area Detention Basin Cost: 0.00 Volunteers: 0 Number Attending: 17 Focus: Present information regarding the proposed Oshkosh North High School Area Detention Basins project to the general public. Description: Mr. Rabe presented information regarding the Campbell Creek Watershed analysis as it related to the construction of the Westhaven Clubhouse Area Detention Basin. The presentation included information regarding: Watershed Characteristics Purpose of the Project Detention Basin Design Parameters Discussion How was the event sponsored ?: Date: 1011112011 Responsible Party: James Rabe, Civil Engineer// Public Education - Libbey t Nicolet Watersheds Type: Common Council Workshop Event Name: Libbey / Nicolet Watersheds Cost: 0.00 Volunteers: 0 Number Attending: 30 Focus: Present the results of the Libbey & Nicolet Watersheds to the Common Council. Description: Mr. Bachhuber (AECOM) and Mr. Common Council. The topics presented included: Project Goals Project Area Description Existing Conditions Alternative Evaluation Recommended Alternative Phased Implementation Discussion How was the event sponsored ?: Rabe presented the results of the watershed analysis to the 10 Date: 1012612011 Responsible Party. James Rabe, Civil Engineer 9 Public Education - Sawyer Creek Channel Improvements Public Information Meeting Type: Public Information Meeting Event Name: Sawyer Creek Channel Improvements Public Information Meeting Cost: 0.00 Volunteers: 0 Number Attending: 38 Focus: Present overview of Sawyer Creek Watershed Analysis as it pertains to the proposed Channel Improvements Project along Sawyer Creek from North Koeller Street to the Fox River. Description: Mr. Yentz (Strand Associates) presented information relating to the Sawyer Creek Watershed and the Sawyer Creek Channel Improvements Project. Topics discussed included: Sawyer Creek Watershed Existing Channel Characteristics Project Limits Proposed Improvements _ Channel Proposed Improvements - Invasive Plant Removal Proposed Improvements - Fish Habitat Proposed Improvements - Canoe Access Proposed Improvements - Slope Stabilization Proposed Dredging Features 2012 Construction Schedule Opinion of Construction Cost Discussion How was the event sponsored ?: Date: 92/212011 Responsible Party: James Rabe, Civil Engineer 11 Public Education - Bernheim Drainage Issues Type: Neighborhood Meeting Event Name: Bernheim Drainage Issues Cost: 0.00 Volunteers: 0 Number Attending: 6 Focus: Discuss neighborhood drainage issues. Description: City Manager Rohloff and Mr. Rabe met with residents in the Bernheim Street area to discuss drainage issues affecting several of the neighbors. Mr. Rabe will have a survey crew come out to survey ground elevations in several yards in an effort to help the neighborhood address grading and drainage issues that are impacting several properties. After the survey is complete, Storm Water Staff will continue to work with the property owners to develop a plan to help with the drainage issues. How was the event sponsored ?: 11 ermit Annual Report Responsible Party: James Rabe, Civil Engineer 11 Start Date: 11112007 End Date: 1213112011 Has Goal Seen Accomplished: NO Work performed for the BMP listed above Date: 112712091 Responsible Party: James Rabe, Civil Engineer 11 2010 Annual Permit Storm Water Utility Committee Review The Draft 2010 Annual Report was presented to the Storm Water Utility Committee at thier January 27, meeting. The Storm Water Utility Committee recommended approval of the 2010 Annual Report at their March 17, 2011 meeting. The Common Council approved submitting the 2010 Annual Report at their March 22, 2011 meeting. 5torn! ater, Util�ty;Committee •• IYIIIIYIIYYI II YIYIIglgllllllll lll�III�I� Responsible Party. James Rabe, Civil Engineer 11 Start Date: 111/2007 End Date: 1213012011 Has Goal Been Accomplished: NO Work performed for the BMP listed above Date: 112712019 Responsible Party: James Rabe, Civil Engineer 11 01 -27 -2011 Committee Meeting Committee meeting in Room 404 of City Hall. Date: 311712011 Responsible Party: James Rabe, Civil Engineer 11 03 -17 -2011 Committee Meeting Committee meeting in Room 404 of City Hall. Date; 412812011 Responsible Party: James Rabe, Civil Engineer 11 04 -28 -2011 Committee Meeting Committee meeting in Room 404 of City Hall. Date: 911512019 Responsible Party: James Rabe, Civil Engineer 11 09 -15 -2011 Committee Meeting Committee meeting in Room 404 of City Hall. 12 Date: 1012012011 Responsible Party: James Rabe, Civil Engineer 11 10 -20 -2011 Committee Meeting Committee meeting in Room 404 of City Hall. Date: 121812011 Responsible Party: James Rabe, Civil Engineer// 12 -08 -2011 Committee Meeting Committee meeting in Room 404 of City Hall. 13 Illicit Discharge Detection and Elimination Details of BMPs which had work performed for them 2011 111icit Connections Discovered Responsible Party: James Rabe, Civil Engineer II Start Date: 1/112011 End Date: 12/31/2011 Has Goal Been Accomplished: YES W p for t BMP li sted abo Date: 913012019 Responsible Party: James Rabe, Civil Engineer /1 Construction Contract 11 -05 During the course of constricting the utilities on Contract 11 -05 the following addresses were found to have sanitary sewer connections into the storm sewer: 1001 Knapp Street 519 Knapp Street 505 Knapp Street These connections were removed from the storm sewer and correctly connected to the sanitary sewer as a part of the construction project. Responsible Party: James Rabe, Civil Engineer /1 Start Date: 111/2011 End Date. 12/31/2011 Has Goal Been Accomplished: YES Work performed for the BMP listed above Date: 1213112011 Responsible Party: James Rabe, Civil Engineer// Outfall Inspection Summary Report The summary report of the outfall screening program has been submitted under separate cover. 14 Construction Site Pollution Control Details of BMPs which had work performed for them 2011:Construction'Si to. an Reviews Responsible Party: Laura Gray, Civil Engineer/ Start Date: 1/1/2011 End Date: 12131/2011 Has Goal Been Accomplished: YES Work performed for the BMP listed above Date: 12/31/2099 Responsible Party: Laura Gray, Civil Engineer 1 2011 Construction Site Plan Reviews See separately attached Site Plan Review Summary. The construction site and post construction storm water management site plan reviews are combined in a single report. 02 -16 -2011 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 3/22/2011 Responsible Party. James Rabe, Civil Engineer// 03 -22 -2011 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 412012019 Responsible Party: James Rabe, Civil Engineer 11 04 -20 -2011 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. Date: 51912099 Responsible Party: James Rabe, Civil Engineer 11 05 -05 -2011 Committee Meeting Attend NEWSC Erosion Control and Storm Water Management Committee Meeting. 15 Post - Construction Site Storm Management Details of BMPs which had work performed for them ;2011 Construction.Site Plan Reviews Responsible Party: James Rabe, Civil Engineer 11 Start bate: 111/2011 End Date: 12/31/2011 Has Goal Been Accomplished: YES Work performed for the BMP listed above Date: 9213112011 Responsible Party: Laura Gray, Civil Engineer 1 2011 Construction Site Plan Reviews See separately attached Site Plan Review Summary. The construction site and post construction storm water management site plan reviews are combined in a single report. IN Pollution Prevention Details of BMPs which had work performed for them V Storm Water Quality Management Details of BMPs which had work performed for them Phase 2 of Pollution;'Reduction Requiremen#s Responsible Party. James Rabe, Civil Engineer 11 Start Date: 1/212007 End Date: 12/30/2013 Has Goal Been Accomplished: NO Work pe f or the BMP listed above Date: 1911812011 Responsible Party: James Rabe, Civil Engineer 11 Construction of Westhaven Clubhouse Area Detention Basin Construction of Contract 11 -02 started and was mostly completed during 2011. The wetland emergent plant plugs will be installed in spring of 2012. The Detention Basin is estimated to remove 6.8 tons per year of sediment based on WinSLAMM modeling. 18 Storm Sewer System Map Details of BMPs which had work performed for them Date: 1213112011 Responsible Party: Kris Lyons, CET Draftsperson Update Outfall Map Complete 2 011 Map Updates. 19 Workshop Title: Civil 3D Styles Webcast Date: 1/20/201 IType of Training: Not Applicable Hosted By: Imagitec ress: Obtain further information on Civil 3D Styles for AutoCAD Civil 3D Name nt F Workshop Title: Post Construction Vegetation Date: 11251201 jType of Training: Erosion Control and Stormwater Management NEWSC NEWSC sponsored this training session to provide members with information on managing native vegetation in stormwater management practices. Nei[ Diboll of Prairie Nursery presented the information. Topics of discussion included: Aquatic Emergent Wetland Plant Habitat Native Shrubs, Grasses, and Wildflowers for Shoreline Buffers Designing Natural Landscapes Site Preparation and Prairie Seeding Methods Management of Prairies Evaluating Prairies Department Workshop Title: FWWA Annual Conference Date: 5110/201 IType of Training: Not Applicable Hosted By: Fox Wolf Watershed Alliance Address: I Description: First day of two day conference The conference has a two track program. Track A presentations consisted of. Storm Water Management: Meeting the Challenges of Wisconsin's Changing Climate Emergency Management and Flooding: Dealing with the Aftermath Runoff Patterns and Water Quality Characteristics at Edge of Field and Agricultural Drain Tiles Sharing TSS Control in Verona Sharing TSS Control in Menasha Adapative Management & Pollutant Trading Track B consisted of: Milwaukee River GReenway Master Plan Road /Stream Crossing Workshop: How Road - Stream Crossings Effect Streams Road /Stream Crossing Workshop: Reconnecting Your Watershed Road /Stream Crossing Workshop: Designing Road- Streem Corssings to Accomodate Fish & Acquatic Organism Passage Road /Strea Cros sing Workshop: Case Studies Staff in;Attendence Name Department James Rabe Engineering Laura Gray Engineering Workshop Title: FWWA Annual Conference Date: 5/11/201 Type of Training: Not Applicable Hosted By: Fox Wolf Watershed Alliance Address: f Description: Second day of two day conference Track A consisted of: State -Wide Information & Education Program Comparison Case Study: Storm Water Infiltration at Pabst Farms Where We Are and Where Are We Going Biofiltration Soil Mixes Smart Underdrain for Biofiltration Grass Swales Track B consisted of an Erosion Control Workshop: Introduction to Erosion Control One & Two Family Residential Sites Commercial Sites & Subdivisions Enforcement Panel Discussion Afternoo Field Exhib and Simulations — T Staff lg Atte n d ence _- � _ - Name Department James Rabe Engineering Kris Lyons Engineering p Workshop Title: Stream Restoration Webinar Date: 12!71201 IType of Training: Erosion Control and Stormwater Management Hosted By: Center for Watershed Protection Address. Description: The Center for Watershed Protection hosted a webinar on Stream Restoration. The Center gave an overview of what stream restoration is, and how it fits into watershed wide restoration work. A pyramid approcah to stream functions was presented to set goals and establish parameters for measuring a streams function, determining assessment methodolgy and determining restoration sites and methods. Various speakers walked through portions o the a as we as pre senting example projects. SEaff In Attendance _T Name Department James Rabe Engineering Overview of Construction site inspection program (Information in this report is for the dates listed below) Start Date: 1/1/2011 End Date: 1213112011 Summary of Projects Number of Projects started during reporting period 50 Number of Projects continuing from previous period into reporting period 63 Number of Projects completed during reporting period 29 Number of Plan Reviews performed during reporting period 97 Time (hours) spent on Plan Reviews during reporting period* 257.5 Summary of Inspections Performed Number of Projects inspected during reporting period 30 Percentage of Projects inspected during reporting period 26.5% Number of Inspections Performed: 249 Number of Projects with Enforcement Actions during reporting period 76 Total Number of Enforcement Actions during reporting period 76 Time (hours) spent performing Inspections during reporting period* 200.083333 Call Received By: Applies To: Illicit Discharge Call - 191 W 28th Avenue General Information James Rabe Date Received: 5/12/2011 Industrial Site Time Received: 12:00:00 PM Description: A Winnebago County Highway Department Supervisor called to report a whitish geilantanous "sediment" located on the bottom of Gallups/Merritis Creek at 28th Avenue. James Rabe contact Jason Weis (OMNNI Associates), who was in the City conducting a pre - screening of the outfalls for the 2011 Ongoing Outfall Screening Program. Mr. Rabe advised Mr. Weis to visit the site and begin tracking upstream. Investigation Required: YES Priority Status: High Call Status: CLOSED Date Closed: 8131/2011 Action Site Visit Follow !gyp Actions Date 05/12/2011 Comments: Mr. Rabe and Mr. Rich Wood (City of Oshkosh Plumbing Inspector and Pre - Treatment Coordinator) visited the site on the afternoon of 05 -12 -2011. Mr. Wood contacted Hydrite Chemical and arranged a site visit. There was a moderate flow coming from the site storm sewer into the City storm sewer system in 28th Avenue. Jason Weis (OMNNI Associates) had sampled this location previously and test for ammonia. The test strips read in excess of 6ppm for ammonia. The discharge was sampled a second time. The second sample was given to Hydrite Chemical for further analysis. Hydrite staff and Rich Wood walked the site looking for obvious locations for a source. There were no obvious sources identified. Hydrite Chemcial will contract to have their storm sewer system televised in an effort to determine where the flow entering the storm sewer system is originating from. Hydrite staff will keep Mr. Wood and Mr. Rabe apprised of their findings. Field Investigation 06/01/20111 Comments: Mr. Rich Wood (City Plumbing Inspector) discussed with the property owner the results of the storm sewer televising the owner conducted. This televising showed evidence of pipe failures that resulted in chemical waste entering the storm sewer system. The owner is developing plans to correct the issue. Corrections 06/03/2011 Comments: Mr. Rich Wood (City Plumbing Inspector) met with the property owner and their plumber to review the proposed corrections to their onsite plumbing to eliminate the cross connection between their waste system and the storm sewer system. Corrections 08/31/2011 Comments: Mr. Rabe followed up with Mr. Rich Wood on the status of the Hydrite Chemical Site. Mr. Wood confirmed that the chemical waste system that contributed to the release has been abandoned and all waste is pumped to the onsite pre - treatment facility prior to discharge into the City's Sanitary Sewer System, Enforcement Actions Illicit Discharge Call - 221 W Packer Avenue General Information Call Received By: Laurie Dahlke Date Received: 7/25/2011 Applies To: Commercial Site Time Received: 8:35:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 712512011 Follow Up Actions Action Date Enforcement Actions Enforcement Letter Sent 07/25/2011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 9434 Monroe Street General Information Call Received By: Laurie Dahlke Date Received: 8/5/2011 Applies To: Private Residence Time Received: 9:15:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 818/2011 Action Field Investigation Follow Up Actions Date 08/05/2011 Comments: Kris Lyons visited the site and took photos. Enforcement Letter Sent Enforcement Actions 08108/2011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 705 E Nevada Avenue General Information Call Received By: Laurie Dahlke Date Received: 8/5/2011 Applies To: Private Residence Time Received: 8:15:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Cali Status: CLOSED Date Closed: 8/812011 Follow Up Actions Action Date Field Investigation 08105/2011 Comments: Kris Lyons visited the site and took photos. Enforcement Actions Enforcement Letter Sent 0810812011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue• violations will result in a citation being issued. Illicit Discharge Call - 1806 Doemel Street General Information Call Received By: Laurie Dahlke Date Received: 8/5/2011 Applies To: Private Residence Time Received: 8:25:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 8/8/2011 Fallow Up Actions Action Date Field Investigation 0810512011 Comments: Kris Lyons visited the site and took photos. Enforcement Actions Enforcement Letter Sent 08108/2011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 1224 Grand Street General Information Call Received By: Laurie Dahlke Date Received: 8/5/2011 Applies To: Private Residence Time Received: 8:35:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 8/8/2011 Follow Up Actions Action Date Field Investigation Comments: Kris Lyons visited the site and took photos. Enforcement Letter Sent 08/05/2011 Enforcement Actions 08/48/2011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call -'1931 Harrison Street General Information Call Received By: Laurie Dahlke Date Received: 815/2011 Applies To: Private Residence Time Received: 8:45:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 818/2011 Action Field Investigation Follow Up Actions Date 08/05/2011 Comments: Kris Lyons visited the site and took photos. Enforcement Letter Sent Enforcement Actions 08/0812011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue. violations will result in a citation being issued. Illicit Discharge Call - 2315 Harrison Street General Information Call Received By: Laurie Dahlke Date Received: 8/512011 Applies To: Private Residence Time Received: 9:05:00 AM Description: Phone call received regarding grass clippings being discharged into the street, Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 8/812011 Follow Up Actions Action Date Field Investigation Comments: Kris Lyons visited the site and took photos. Enforcement Letter Sent 08/05/2011 Enforcement Actions 08/0812011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 1804 Doemel Street General Information Call Received By: Laurie Dahlke Date Received: 8/512011 Applies To: Private Residence Time Received: 9:25:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 81812011 Action Field Investigation Follow Up Actions Date 08/05/2011 Comments: Kris Lyons visited the site and took photos. Enforcement Letter Sent Enforcement Actions 0810812011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 2541 W 20th Avenue General Information Call Received By: Laurie Dahlke Date Received: 8/5/2011 Applies To: Commercial Site Time Received: 9:35:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 8/8/2011 Action Field Investigation Follow Up Actions Date 08105/2011 Comments: Kris Lyons visited the site and took photos. Enforcement Letter Sent Enforcement Actions 08/08/2011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 1422 E Murdock Avenue General Information Call Received By: Laurie Dahlke Date Received: 815/2011 Applies To: Private Residence Time Received: 8:55:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 8/8/2011 Action Field Investigation Fallow Up Actions Date 0 810 512 01 1 Comments: Kris Lyons visited the site and took photos. Enforcement Letter Sent Enforcement Actions 08!0812011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 919 Powers Street General Information Call Received By: Laurie Dahlke Date Received: 8/8/2011 Applies To: Private Residence Time Received: 8:20:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 819/2011 Action Field Investigation Follow Up Actions Date 08/08/2011 Comments: Kris Lyons visited the site and took photos. Enforcement Actions Enforcement Letter Sent 08/09/2011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue• violations will result in a citation being issued. Illicit Discharge Call - 800 Powers Street General Information Call Received By: Laurie Dahlke Date Received: 8/8/2011 Applies To: Private Residence Time Received: 8:30:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 8/9/2011 Action Field Investigation Follow Up Actions Date 08/08/2011 Comments: Kris Lyons visited the site and took photos. Enforcement Letter Sent Enforcement Actions 08/09/2011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued, Illicit Discharge Call - 2014 Harrison Street General Information Call Received By: Laurie Dahike Date Received: 8/11/2011 Applies To: Commercial Site Time Received: 9:35:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 8/11/2011 Action Field Investigation Follow Up Actions Date 08111/2011 Comments: Ben Krumenauer visited the site and took photos. Enforcement Actions Enforcement Letter Sent 08/11/2011 Comments: City Engineer Steve Gohde sent a latter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 2407 Harrison Street General Information Call Received By: Laurie Dahlke Date Received: 8/31/2011 Applies To: Private Residence Time Received: 9:35:00 AM Description: Phone call received regarding grass clippings being discharged into the street. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 911/2011 Action Field Investigation Follow Up Actions Date 08/3112011 Comments: Ben Krumenauer visited the site and took photos. Enforcement Letter Sent Enforcement Actions 09101/2011 Comments: City Engineer Steve Gohde sent a letter to the property owner advising them of the code violation and that continue violations will result in a citation being issued. Illicit Discharge Call - 2022 Menominee Drive General Information Call Received By: Kevin Kiesow Date Received: 12/2/2011 Applies To: Private Residence Time Received: 11:15:00 AM Description: The caller indicated that the witnessed an employye of Buck's Tile dump material from a five gallon bucket into a storm sewer inlet. Investigation Required: YES Priority Status: Medium Call Status: CLOSED Date Closed: 9/1912012 Action Clean tap Follow Up Actions Date 12/02/2011 Comments: Mr. Rabe contacted the Streets Division Supervisors (Andy Hintz and Todd Burns) to have a Vac -Truck clean the inlet and inspect the down stream manhole. Ms. Gray was onsite while the inlet was being cleaned. In addition to vaccuuming the leaves from the inlet, the inside of the structure was hosed down, with all water being removed with the vac truck. There was no evidence of the substance migrating down the storm sewer. Field Investigation 1210212011 Comments: Ms. Laura Gray and Mr. Kris Lyons (City of Oshkosh Engineering Division) conducted a site visit. The storm sewer inlet had a large number of leaves in it yet. The leaves were coated in a white semi liquid substance. Ms. Gray and Mr. Lyons reported their findings to Mr. James Rabe (Storm Water Engineering Supervisor). Phone Call 12/02/2011 Comments: Mr. Rabe contacted Mr. Randy McArdle of Bucks Tile to discuss the discharge. The owner confirmed that he did dump a bucket of watery waste containing some grout material from a the project into the storm sewer. Mr. Rabe advised him that dumping of material into the storm sewer was against the law. Mr. McArdle commented that is was an inert material and that there was more sand in the gutter. M €. Rabe requested a copy of the Material Data Safety Sheet (MSDS) for the material, and indicated that he would follow up with more information later. Enforcement Letter Sent Enforcement Actions 01/19122012 Comments: Mr. Rabe sent an educational letter to Mr. McArdle advising him of why disposing of materials within the storm sewer is against Federal, State and Local laws. Overview of Outfall inspection program (Information in this report is for the dates listed below) Start Date: 1/1/2(}11 End Date: 12131/2011 Outfalls listed in inventory: 591 Outfalls inspected during reporting period: 245 Percentage of outfalls inspected: 41.5% Summary of inspection results during reporting period: Inspections where a flow was observed: 14 Percentage of inspections with a flow observation: 3.2% Inspections where debris was observed: 70 Percentage of inspections with debris observed: 15.8% Total time expended performing inspections: 112 hours, 17 minutes Reported cost of inspections performed`: $ 9,858.93 Summary of illicit discharge results during reporting period: Illicit discharges uncovered: 0 Illicit discharges noted as hazardous: 0 Enforcement actions taken: 0 Illicit discharges currently unresolved: 0 Total time expended tracking illicit discharges: 0 Reported cost of illicit discharge inspections: $ 0.00 Summary of work order activity during reporting period: Work orders initiated: 0 Work orders still outstanding: 0 Summary of sampling activity during reporting period: Total samples collected: 269 Outfalls sampled: 0 * Inspection costs are only calculated for inspections performed by inspectors who have their hourly rates noted in the Contacts list. Consequently the total cost may be higher than the cost noted. Overview of Sformwafer Facility Inspection Program (Information in this report is for the dates listed below) Start Date: 1/112011 End Date: 12/3112011 Facilities listed in inventory: 12 Facilities inspected during reporting period: 11 Facilities constructed during reporting period: 1 Percentage of Facilities inspected: 91.7% Summary of inspection results during reporting period: Inspections where a flow was observed: 0 Percentage of inspections with a flow observation: 0 Inspections where debris was observed: 0 Percentage of inspections with debris observed: 0 Total time expended performing inspections: 0 TSS. Removal: Total TSS removal of Facilities (Tons) 37