Loading...
HomeMy WebLinkAbout01. 12-175 APRIL 24, 2012 12-175 RESOLUTION (CARRIED___7-0_____ LOST________ LAID OVER________ WITHDRAWN_______) PURPOSE: APPROVE FINAL RESOLUTION FOR SPECIAL ASSESSMENTS FOR CONTRACT NO. 12-05 / PAVING, SIDEWALK, DRIVEWAY, & UTILITIES / THIRD LOCAL STREET CONCRETE PAVING PROGRAM (SOUTH-CENTRAL AREA) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the Common Council of the City of Oshkosh held a public hearing on the 24th day of April, 2012, at 6:00 p.m. for the purpose of hearing all interested persons concerning the preliminary resolution and report of the City Manager (Board of Public Works) on the proposed improvements as listed below, pursuant to the initial resolution adopted January 24, 2012, by the Oshkosh Common Council of the following named streets: Concrete Paving, Asphalt Paving, Sidewalk, Driveway Aprons, Sanitary Sewer Laterals (new and relay), Storm Sewer Laterals (new and relay), and Water Laterals (new and relay): th W. 6 Avenue from Knapp to Ohio Street th Idaho Street from 50’ north to 50’ south of W. 6 Avenue th Dakota Street from 50’ north to 50’ south of W. 6 Avenue th W. 7 Avenue from Ohio Street to 400’ west of Ohio Street th W. 10 Avenue from Kansas Street to Knapp Street th Kansas Street from 50’ north to 50’ south of W. 10 Avenue thth Weisbrod Street from W. 10 Avenue to 50’ south of W. 10 Avenue th W. 7 Avenue from Knapp Street to Sawyer Street th Sawyer Street from 50’ north to 50’ south of W. 7 Avenue th Wyoming Street from 50’ north to 50’ south of W. 7 Avenue thth Rugby Street from W. 6 Avenue to 50’ south of W. 8 Avenue th W. 7 Avenue from 50’ east to 50’ west of Rugby Street th W. 8 Avenue from 50’ east to 50’ west of Rugby Street NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh as follows: 1. That the report of the City Manager, acting as the Board of Public Works, pertaining to the construction of the above described public improvements, including plans and specifications therefor, is hereby adopted and approved with the following APRIL 24, 2012 12-175 RESOLUTION CONT'D a. b. c. 2. That the action of the City Manager in advertising for bids and to carry out the work of such improvements in accordance with the reports of the City Manager and in accordance with the said resolution heretofore adopted, is hereby approved, ratified and confirmed. 3. That payment for said improvements be made by assessing the cost to the property benefited as indicated in said report, except as modified herein. 4. Assessments shown on the report represent an exercise of the police power and have been determined on a reasonable basis and are hereby confirmed. 5. That the assessments for all projects included in said report are hereby combined as a single assessment but any interested property owners shall be entitled to object to each assessment separately or all assessments jointly for any purpose or purposes. 6. That the assessments may be paid in cash, or in installments pursuant to Section 25-83 thru 25-89 of the Oshkosh Municipal Code, said deferred payments to bear interest at the rate of six percent (6%) per annum on the unpaid balance. The City Clerk shall publish an installment assessment notice in accordance with Section 66.0715(3)(e) of the Wisconsin Statutes in the official newspaper of the City. 7. The City Clerk is directed to publish this resolution in the OSHKOSH DAILY NORTHWESTERN, the official newspaper of the City. 8. The City Clerk is further directed to mail a copy of this resolution to every property owner whose name appears on the assessment roll whose post office address is known or can with reasonable diligence be ascertained. 0 OfHKOlH ON THE WATER April 13, 2012 Dear Property Owner. PAMELA R. UBRLG City Clerk ANGELA J.JOECKEL Deputy City Clerk CLTY HALL 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54902 -1130 Please find enclosed the following documents for your information and review: 1. A letter of explanation from Public Works Assistant Director Steven Gohde. 2. The Initial Resolution adopted by the Oshkosh Common Council, which began the process for the improvement(s) adjacent to your property. 3. Notice of Public Hearing to be held by the Oshkosh Common Council on April 24, 2092 regarding assessments, which will be set with the adoption of the final resolution, also scheduled for adoption on April 24, 2092. 4. Special assessment payment plan options explaining the payment choices after Contract No. 92 -05 is certified as complete -- payment choice or payment is not accepted at this time. 5. Assessment sheet indicating properties involved in the proposed project, the property footage, price per foot and estimated total assessment to the property. If you wish to appearbefore the Council before the final resolution is adopted to proceed with the construction, please refer to the "Notice of Public Hearing" enclosed. If you have any questions regarding the above listed documents, please contact the Public Works Department (236 -5065) or the City Clerk (236 - 5091), Monday through Friday, 8:00 a.m. until 4:30 p.m. Sincerely, OF OSHK PAMELA R. UBRIG CITY CLERK CITY HALL 215 Church Avenue P.O. Box 1139 Oshkosh, 9 64 City of Oshkosh — - 9 ©3.11€1 O.fHKOlH April 13, 2012 Subject: Assessments for Concrete Paving, Asphalt Paving, Sanitary Sewer Laterals (New & ReIay), Water Laterals (New and Relay), Storm °Sewer Laterals (New and Relay), Sidewalk Repair, New Sidewalk, and Concrete Drive Approaches Contract 12 -05 To Property Owners on: ➢ WEST 6 Tn AVENUE, from Knapp Street to Ohio Street WEST 7rn AVENUE, from Ohio Street to 400' west of Ohio Street ➢ WEST 10 AVENUE, from Kansas Street to Knapp Street ➢ WEST 7 T AVENUE, from Knapp Street to Sawyer Street ➢ RUGBY STREET, from West 8 Avenue to West 6 th Avenue A public hearing is scheduled for Tuesday, April 24, 2012, at 6:00 p.m. in the Common Council Chamber of the Oshkosh City Hall to consider the following improvements to your street: paving, utilities, sidewalks, and/or driveway approaches and the levy of special assessments that partially cover the cost of the improvements. Assessments are not due until the project is certified as complete and then can be paid by any one of the plans as outlined by the City Clerk's information on payment plan options. Based upon the City of Oshkosh assessment policy, the assessable portions of the project have been identified and are outlined on the attached assessment worksheet(s). The estimated distance on side streets is estimated high to allow adequate area for the new construction to be transitioned to the existing pavement. The quantities and costs are estimates and will be adjusted to actual quantity installed and the unit costs will be adjusted according to the assessment policy based on bid prices. Sidewalk estimated quantities include five (5) additional squares of sidewalk to allow for private lateral construction, The final cost will not increase above the estimated total without another public hearing. Questions in regard to payment of Special Assessments can be answered by calling the City Clerk's office at (920)236 -5011. Questions in regard to the construction project in general can be answered by calling the Department of Public Works Engineering Division at (920)236 -5065. The sequence of construction has not yet been scheduled with a contractor. Residents will be notified approximately one week before construction will begin on a particular street. Each street identified in this year's paving program has been designated a specific time frame in which the contractor will need to complete their work on that street. The construction time frames vary from 8 -19 weeks depending upon the amount of work and the complexity of the work associated with a specific street. All work within this contract is scheduled to be completed by the end of November 2012. The project construction will consist of the following elements: relay or installation of specific segments of water and sanitary sewer mains and their associated laterals at various locations along the project; relay or installation of storm sewer and storm sewer laterals, as needed, along the project to accommodate the drainage needs for the street and the adjacent properties; new concrete driveway aprons will be constructed; and the existing concrete sidewalk will be repaired as needed while any gaps in the sidewalk will be constructed with new sidewalk. It is recommended that no salt or harsh chemicals be put on new sidewalk for one (1) year. If you know of any underground wires and/or piping, (examples: invisible electric fence, conduit for exterior lighting, sprinkler system, etc.) on your property near the sidewalk and driveway, please contact the Engineering Division as soon as possible. Prior to the completion of the project, all disturbed areas will be topsoiled, seeded, and covered with erosion mat (the property Paget of 2 1AEngineering \12 -05 Cone Paving & Util- CentraBProjeci InrormationWorrespondefteoU ettets112 -05 Assessrnents Letter ill_443.12.doc 6D tgr owner is responsible for watering the newly vegetated areas). The matting placed over the seed is biodegradable; please do not remove the mat because it serves as mulch for the new grass. Please set your lawn mower to the highest setting when mowing the new grass areas for the first few mowings. As part of the construction, a storm lateral will be installed to your property and an 8" diameter drain with a slotted drain cover will be placed approximately one (1) foot off the sidewalk into your yard. The storm sewer lateral and drain will allow you to direct drainage and/or sump pump hoses to this location. This drain is connected to the storm sewer system and drains directly to local streams and lakes. The lateral is to be used for "clear water" only. "Clear water" is typically groundwater discharged by a sump pump or runoff from precipitation (i,e. rainfall or snow melt). Do not place pet waste, yard waste, or other waste material into the storm sewer system. If you wish to have a storm sewer lateral without the surface drain feature, please contact the Engineering Division. In the event conditions on the property prevent the installation, a drain will not be installed. The drain is part of your private lateral and will be yours to maintain. The drain will have a fabric filter installed as a part of the construction. Please leave the filter in place until the grass surrounding the drain is well established. The fabric will prevent dirt and debris from filling the pipe until the grass is established. During construction, there will be periods of time when access to your property will be restricted. There will only be a few instances when this will occur. Typically, short access restrictions occur during the underground utility installation and longer restrictions occur during the placement of concrete pavement and driveways. To minimize the inconvenience, the contractor will provide a one -week notice prior to the access being restricted for concrete work. During construction, overnight parking restrictions will be relaxed on the adjacent streets to allow temporary parking. Per the Police Department, a Construction Parking Permit is not required if a street (any portion or entire roadway) or sidewalk is being repaired. All "No Parking" areas and /or posted time zones must be obeyed. Vehicles parking overnight must be parked on the house address side of the street that corresponds to the current date, On odd calendar dates, the vehicles should be parked on the odd address side of the street. On even calendar dates, vehicles should be parked on the even address side of the street. Provisions will be made with the Fire Department and the Sanitation Division so fire protection and City garbage /recycling collection will continue at all times. Please ensure your garbage /recyclables are at the curbside by 7:00 a.m, on your regular collection day. Crews schedule collection of garbage /recyclables in construction areas at the start of each day. If rural -type mailboxes exist on your street, the contractor will remove them during construction. This removal will make it necessary for you to pick up your mail at the Post Office. The contractor will be responsible so as not to damage the mailboxes. Upon completion of the paving work, the contractor will reset the mailboxes. Although terrace trees may need to be removed at specific locations, they will be preserved as much as possible. Property owners at locations where a tree needs to be removed will receive advance notice of the removal and replacement options. Roots and branches may be cut to allow for paving operations, Cutting and pruning will either be done by, or under the direction of, the City Forester. If you have any questions on the proposed assessments or the project construction, you can contact the Public Works Engineering Division at (924)236 -5065. Sincerely, Steven M. Gohde, P.E. Assistant Director of Public Works SMG /tit Enclosures Page 2 of 2 [AEngineering112 -05 Cone Paving & Mil- Cen[ raPProject_ ]nforntalioA \ConwpondencelLeltm\12A5 Assessments Letter f! 1-4- 13- [2.4oc JANUARY 24, 2012 12 -19 #2 RESOLUTION (CARRIED X LOST LAID OVER WITHDRAW PURPOSE: APPROVAL OF INITIAL RESOLUTION FOR SPECIAL ASSESSMENTS FOR CONTRACT NO. 12 -05 1 PAVING, SIDEWALK, DRIVEWAY & UTILITIES / THIRD LOCAL STREET CONCRETE PAVING PROGRAM (SOUTH - CENTRAL AREA) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED BY the Common Council of the City of Oshkosh as follows: 1. The Common Council hereby declares its intention to exercise its police power under Section 66.0703 and 66.0705 of the Wisconsin Statutes to levy special assessments upon property within the following described areas for benefits conferred upon such property by improving the following: Concrete Paving, Asphalt Paving, Sidewalk, Driveway Aprons, Sanitary__ Sewer Laterals (new and relay), Storm Sewer Laterals (new and relay), and Water Laterals (new and relay) W. 6 1h Avenue from Knapp to Ohio Street Idaho Street from 50' north to 50' south of W. 6th Avenue Dakota Street from 50' north to 50' south of W. 6th Avenue W. 7th Avenue from Ohio Street to 400' west of Ohio Street W. 10 Avenue from Kansas Street to Knapp Street Kansas Street from 50' north to 50' south of W. 10 Avenue Weisbrod Street from W. 10 Avenue to 50' south of W. 1 0 th Avenue W. 7 th Avenue from Knapp Street to Sawyer Street Sawyer Street from 50' north to 50' south of W. 7 th Avenue Wyoming Street from 50' north to 50' south of W. 7 th Avenue Rugby Street from W. 6 th Avenue to 50' south of W. 8 th Avenue W. 7 th Avenue from 50' east to 50' west of Rugby Street W. 8 th Avenue from 50' east to 50' west of Rugby Street 2. The total amount assessed against such district shall not exceed the total cost of the improvements and the amount assessed against any parcel shall not be greater than the benefits accrued thereto from said improvements. 3. The assessments against any parcel may be paid according to the provisions of Section 25 -83 through 25 -89 of the Oshkosh Municipal Code. JANUARY 24, 2012 12 -19 RESOLUTION CONT'D 4. The governing body determines that the improvements constitute an exercise of the police power for the health, safety, and general welfare of the municipality and its inhabitants, 5. The Board of Public Works is directed to prepare a report consisting of: (a) Final plans and specifications for said improvements. (b) An estimate of the entire cost of the proposed work or improvements. (c) An estimate as to each parcel of property within the assessment district -of: (1) The assessment of benefits to be levied for each improvement. (2) The damages to be awarded for property taken or damages by each improvement. (3) The net amount of benefits over damages or the net amount of damages over benefits for each improvement. (4) The total assessment against each parcel Upon completion of such report, the Board of Public Works is directed to file a copy thereof in the City Clerk's Office for public inspection. 6. Upon receiving the report of the Board of Public Works, the City Clerk is directed to give notice of a public hearing on such reports as specified in Section 66.0703(7)(a) of the Wisconsin Statutes. The hearing shall be held before the Common Council at the Council Chambers, Room 406 in the City Hall at a time set by the Clerk in accordance with the Wisconsin Statutes. The assessment against any parcel may be paid in cash, paid with the property tax installment, or in ten (10) installments if the total amount of the assessment is greater than five hundred dollars ($500.00) or fifteen (15) installments if the total amount of the assessment is greater than one thousand dollars ($1000.00). 7. The installation of said street improvements shall be accomplished according to the provisions of Section 25 -3- through 25 -11 of the Oshkosh Municipal Code. #3 NOTICE OF PUBLIC HEARING Office of the City Clerk, City of Oshkosh, Winnebago County, Wisconsin: Please take notice that the City Council of the City of Oshkosh has declared its intention to exercise its power under Section 66.60 of the Wisconsin Statutes, to levy assessments upon property for benefits conferred upon such property by providing the following improvements fronting upon the following described streets: CONTRACT NO 12 -05 CONCRETE PAVING, ASPHALT PAVING, SIDEWALK, DRIVEWAY APRONS, SANITARY SEWER LATERALS (NEW AND RELAY), STORM SEWER LATERALS (NEW AND RELAY), AND WATER LATERALS (NEW AND RELAY) W. 6th Avenue from Knapp to Ohio Street Idaho Street from 50' north to 50' south of W. 6 th Avenue Dakota Street from 50' north to 50' south of W. 6 th Avenue W 7 th Avenue from Ohio Street to 400' west of Ohio Street W. 10 Avenue from Kansas Street to Knapp Street Kansas Street from 50' north to 50' south of W. 10 Avenue Weisbrod Street from W. 10 Avenue to 50' south of W. 10 Avenue W. 7 th Avenue from Knapp Street to Sawyer Street Sawyer Street from 50' north to 50' south of W. 7 th Avenue Wyoming Street from 50' north to 50' south of W. 7 th Avenue Rugby Street from W. 6 th Avenue to 50' south of W. 8 th Avenue W. 7 th Avenue from 50' east to 50' west of Rugby Street W. 8 th Avenue from 50' east to 50' west of Rugby Street The report of the Public Works Director and City Manager showing proposed plans and specifications, estimated costs of improvements, proposed assessments and awards of damages is on file in the Office of the City Clerk and can be inspected there on any business day between the hours of 8:00 a.m. and 4:30 p.m. Notification that the City Manager (Board of Public Works) and City Council will hear all persons interested or their agents or attorneys concerning the matters in the preliminary resolutions authorizing awards of damages at 6:00 p.m. in the Council Chambers in the City Hall, Oshkosh, Wisconsin on APRIL 24, 2012. All objections will be considered at said hearing and thereafter the amount of assessment will be finally determined. PUBLISH: 4/14/2012 CITY OF OSHKOSH PAMELA R. UBRIG CITY CLERK i I SPECIAL ASSESSMENT PAYMENT PLAN OPTIONS AFTER CONTRACT NO. 12 -05 IS CERTIFIED AS COMPLETE CONTRACT NO 12 -05 WILL CONSIST OF:. - CONCRETE PAVING, ASPHALT PAVING, SIDEWALK, DRIVEWAY APRONS, SANITARY SEWER LATERALS (NEW AND RELAY), STORM SEWER LATERALS (NEW AND RELAY), AND WATER LATERALS (NEW AND RELAY): W 6th Avenue from Knapp to Ohio Street Idaho Street from 50' north to 50' south of W. 6th Avenue Dakota Street from 50' north to 50' south of W. 6th Avenue W 7 th Avenue from Ohio Street to 400' west of Ohio Street W. 10 Avenue from Kansas Street to Knapp Street Kansas Street from 50' north to 50' south -of W. 10 Avenue Weisbrod Street from W. 10 Avenue to 50' south of W. 10 Avenue W 7th Avenue from Knapp Street to Sawyer Street Sawyer Street from 50' north to 50' south of W. 7 th Avenue Wyoming Street from 50' north to 50' south of W. 7 th Avenue Rugby Street from W. 6 th Avenue to 50' south of W. 8 th Avenue W 7 th Avenue from 50' east to 50' west of Rugby Street W. 8th Avenue from 50' east to 50' west of Rugby Street Included in this mailing, is an estimated amount (quantities and costs) of the special assessment (sheet #5) against your property or properties. A statement of the same is on file in the office of the City Clerk. Once Contract No. 12 -05 is certified as complete by the Public Works Department, the final amount (quantities and costs) of the special assessment against your property or properties will be mailed to you. At that time you will also receive the paperwork to select a payment choice for the special assessments. PAYMENT CHOICE OR PAYMENT IS NOT ACCEPTED AT THIS TIME. THE PAYMENT OPTIONS SHEET YOU WILL RECEIVE AFTER THE CONTRACT IS CERTIFIED AS COMPLETE WILL HAVE THE OPTIONS: INVOICE - PAYMENT WITHIN 30 DAYS If you choose this option, the City of Oshkosh will then send you a special assessment invoice and you must make payment within thirty days of that notice. If the payment is not made within thirty days after receiving the special assessment invoice, 6% interest accrues from the date of notification. If after making this selection, the property owner fails to make payment to the City Treasurer; the entire amount including interest will be placed on the next property tax bill. TOTAL ASSESSMENT ON NEXT TAX BILL IN FULL Property owners may elect to pay 100% of the assessment on the next designated real estate property tax bill, without interest. The total amount of the assessment will be included on and payable in conjunction with the next designated property tax bill. TEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $500.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the ten- (10) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the ten -year period; with interest pro -rated to the month of payment. (Applies to assessments in excess of $500.00,) FIFTEEN ANNUAL INSTALLMENT PAYMENTS ON PROPERTY TAX BILL (ASSESSMENT MUST BE IN EXCESS OF $1,000.00) The amount of the assessment will be placed on the property tax bill with interest at 6% on the unpaid balance per year over the fifteen- (15) year period. The annual assessment payment and interest will be included in each year's tax bill payment. The assessment balance may be paid in full at any time during the fifteen -year period, with interest pro -rated to the month of payment. (Applies to assessments in excess of $1,000.00.) CITY OF OSHKOSH PAMELA R. UBRIG CITY CLERK l W. 9TH AVE. 50.0' 1079 5 527 1073 h H.C. QUSTAVUS 52.7' 1069 3 527 1061 2 .. 500 1057 1 q URF) s BLOCK 2 � 1 7 8 9 10 R--2 1 N Q - -- - - -- f - - - -.. - - - -.. i 3 A 5 6 7 �ONING a 11 10 9 8 %' p ASSES OR'S PLA - - - - -- F. F. ,B, ING SUBD 3 ELOCK 2 S .UUK 1 22 U g S h -'v filename: 10thw11 16 t 75 4 13 12 11 10 2 12 1,3 14 15 16 50.0' 1076 50.0' 1070 1 50.0' 1064 1 50.0' 1060 50.0' 1054 1 50.0' 1050 1 500 1044A 10 44 1 810 1 1036 54.0' 1030 50.0' 1024 1 50.0' 1020 50.0' 1016 1 50.0' 1 1010 50,0 w 91.0' 50.0' 1079 5 527 1073 h H.C. QUSTAVUS 52.7' 1069 3 527 1061 2 .. 500 1057 1 q URF) s BLOCK 2 � 1 7 8 9 10 H U) Q N Z Y W. 11 TH AVE. W. 10TH AVE. 53.0' 53.0' 54.0' 60.0' 40.0' 1 t4' 1049 1043 1037 1031 1 N Q W. Q O F. F. KIN SU D c f ELOCK 2 22 U g S -'v filename: 10thw11 0- Q Z Y N i PAGE 1 OF 3 TO BE ASSESSED NON— RESIDENTIAL RATE PARCEL I.D. ADDRESS OWNER FRONTAGE ASSESSABLE COMM,RATE CONCRETE EXISTING CONCRETE SIDEWALK SANITARY LATE STORM SEWER 90TH TOTAL CALCULATION LINEAR FEET AS APRON APRON LAY LATERAL 13-0758 -0200 924 KANSAS ST NEWELLJASON0 50.0 $2925.00 OFF KANSAS $0,00 $562.50 $1500.00 $750,00 $5737.50 13.0758.0100 1076 W 10TH AVF CHRISTOPHER JAMES M 56.0 $2 925.00 SHARED CONC $241.60 $675.00 $1 $750.00 $6.091.60 13. 0758 -0000 1070 W 10TH AVE HANNEMAN CORY A 50.0 S2 SHARED CONC $223.20 $562.50 $1 $750.00 $5,960.70 13-0757 -0000 1064 W 10TH AVE SWAN SUSAN M 50.0 52 925.00 GRAVEL $581.60 $675.00 $1 $750.00 $6,431,60 13-0756-0060 1 OW W 1OTH AVE HENDRICKS THOMAS PIMARY M 50.0 S2,925.00 GRAVEL $752.40 $562,50 $1 $750,00 $6 13-0755-0000 1054 W 10TH AVE PURER PHILLIP J 50.0 $2,925.00 CONC $305.20 5675,00 $1 $750.00 $6,15520 13-0754-0000 1050 W 10TH AVE HOERNKE MICHELE A 50.0 S2 CONC $36720 5562,50 $1,500,00 $750.00 $6,104.70 13-075MOOO 1044 W 10TH AVE KARGUS REV TRUST GORDON R 81.0 $4 GRAVEL $642,40 $900.00 $1 3750.00 S8 13. 0526.0100 1036 W 10TH AVE BLAU LIFE ESTATE ROSE M 54.0 S3 CONC $360.00 $675.00 $1 $750.00 S15,444.00 13-05274000 1030 W 10TH AVE WALTER HARRY 50.0 $Z925-00 CONC $296.00 8562.50 $1 5750.00 $6,033.50 13. 0528-0000 1024 W 10TH AVE SPANBAUER IAN R 50.0 $2,925.00 ASP 5444.57 $562.50 $1,500.00 $750.00 $6 182.07 13. 0529.0000 1020 W 16TH AVE ASKINS ROBERT L 50.0 S2,925.00 GRAVEL 558920 $562.50 $1 $750,00 $6,326,70 13-MG -0000 1016 W 10TH AVE BALDRY LIFE ESTATE WALLACE H 50.0 $2,925.00 SHARED ASP $429.62 $562.50 S1 $750.00 $6167,12 SHARED, 13.05220000 1010 W 10TH AVE ARTHUR TODD AICONNIE 50.0 $2 ASPICON 536232 $562.50 $1 500.00 $750.00 $6 099.82 13. 0521 -WOO 927 KNAPP ST OEWHURST BRYAN RIANNE E 91.0' 12' 0 45.5 $2,661.75 # OFF KNAPP $0.00 $56240 $1 OFF KNAPP $4 $45.659.25 $5,795.31 39,225.00 $22,500.00 $10,500.00 $93,679.56 " CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION # CREOtT FOR 24125 OF 2011 10TH AVE. CONCRETE PAVING ASSESSMENT TO BE APPLIED 2012 ASSESSMENT RATES: 32' CONCRETE PAVEMENT (R -11R -2 RESIDENTIAL) m $58.50 PER LINEAR FOOT CONCRETE APRON m $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) SHEET 2 OF 3 SIDEWALK REHABILITATION m $4.50 PER SQUARE FOOT (ESTIMATE) SANITARY SEWER LATERAL RELAY s $1,500.00 EACH (ESTIMATE) CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, NEW STORM SEWER LATERAL FOR SUMP PUMP - $750.00 EACH ENGINEERING DIVISION SANITARY & STORM SEWER LATERAL ASSESSMENTS CONTRACTNO, DRAWN 12.05 11122/2011 WEST 10TH AVENUE (north side) WARD REVISED KANSAS ST, TO 13TH KNAPP ST. COMM. FRONTAGE ASSESSABLE CONCRETE EXISTING CONCRETE NEW 4" SAN & SANITARY STORM SEWER PARCEL I.D. ADDRESS OWNER RATE CALCULATION LINEAR FEET' AP APRON SIDEWALK 1° WATER AT� L LATERAL '10TH TOTAL ASSESSMENT 13-0556.0000 1079 W 10TH AVE GTBSON JACOB AIASHLEY R 50.0 $2 OFF KANSAS 50.00 $675.00 S1 $750.00 $6 13- 05$54000 1073 W 10TH AVE HAAS STEVEN W 52.7 $3,=,95 CONO $354.80 $562,50 s1 500.00 $750.00 $6 13. 0554-0000 1069 W 10TH AVE SCHREIBER SCOTT L 52.7 53,082.95 CONC $454.60 $675.00 si 500.00 $750,00 $0,4W-75 134553 1061 W 10TH AVE LICHTWALD LOW A 517 $3,082.95 GRAVEL Sfi30.40 $562.50 $1,500.00 $750.00 $fi 525.&5 OFF 134552.0000 1057W10THAVE 2ANOLER MSCHAEL J 50.0 $2925.00 WEISBROD $0.00 $1125.00 51,500.00 $750.00 56300.00 134546.0000 1049 W 10TH AVE CAR'TWRIGHTIKELLY M MAGUIRE TIMOTHY P 53.0 S3 SHARED ASP $444.52 $562.50 S1 $750.00 $6 WTU 13-0547 -0000 1043 W 10TH AVE KIEDFbWSKi CORINNE $3.0 $3 ,100.50 SHARED ASP $426.12 $787.50 $1,500.00 $750,00 $ 6,564,12 134536.0000 1037 W 10TH AVE SKI HOUSES LLC 54.0 3150.00 GRAVELI CONC $518.80 $787.50 $1,500.00 $750,00 $6715.30 134535-0000 1031 W 10TH AVE JANKE LIFE ESTATE WILLARD WIJUNE 60.0 $3-510.00 GONG $324.80 $787,50 $1,500,00 $750.00 $6 13-0534-0000 VACANT LOT ABSOLUTE THERAPEUTIC SPA LLC 40.0 $2 REMOVED $0.00 $787.50 $5 $750.00 $9177.50 13-0532.0000 1015 W 10TH AVE ABSOLUTE THERAPEUTIC SPA LLC X 100.0 $9 ASP slaa.0a $675.00 $1,600.00 $760.00 $12 134531.0000 1001 KNAPP ST SOWARD COLLEEN A 141.0'12• = 70.5 S4 GRAVEL $1 $502.50 $1,500.00 $750.00 $7,944.35 544,223.10 $4,261.84 $8,550.00 $5,300.00 $16,500.00 $9,000.00 $87,834.94 ^ CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION X CREDIT FOR 24125 OF 2011 10TH AVE. CONCRETE PAVING ASSESSMENT TO BEAPPLIEO 2012 ASSESSMENT RATES: 32' CONCRETE PAVEMENT (R -11R•2 RESIDENTIAL) _ $58.50 PER LINEAR FOOT 32' CONCRETE PAVEMENT (NON RESIDENTIAL) _ $97.90 PER LINEAR FOOT CONCRETE APRON - $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) - SHEET 3 OF 3 SIDEWALK REHABILITATION = $4.50 PER SQUARE FOOT (ESTIMATE) SANITARY SEWER LATERAL RELAY - $1,500.00 EACH (ESTIMATE) CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, NEW S70RM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH ENGINEERING DIVISION SANITARY& STORM SEINER LATERAL ASSESSMENTS CONTRACT NO. DRAWN 12.05 1172272011 WEST 10TH AVENUE (south side) WARD REVISED KANSAS ST. TO 13TH KNAPP ST. �C. F� 1`° BLt? K 7_ N w n ` p � W m A ST� VUS SUED GLP WEISBROD v 154.4 � C _ N 7I` cn (n ST. p 0 125.4 G H.C. GUS�aVU5 SUSO mp BLOCK 1 O w N f�l R. , Fr Si ign r BL CK _ LOCK 2 w o PAGE 1 OF 2 filen 10th,wetsbrod. dwg CITY OF OSHKOSH CONO TE PAVING SPECIAL ASSESSMENTS ENGINEERING DIVISION CONTRACT NO. DRAWN WEISBROD STREET 12 -05 11 -17 -2011 GRAPHIC G 25 so 1 120 FEET SOUTH OF W. 10TH AVE. SCALE: (IN FEET) TO W. OTF{ AVE �C. 1`° BLt? K 7_ N v U 154.4 � COMM. FRONTAGE ASSESSABLE CONCRETE PAVING W£ISBROD PARCEL I.D. ADDRESS OWNER RATE CALCULATION LINEAR FEET ASSESSMENT TOTAL 13- 0552 -0000 1057 W 10TH AV ZANDLER MICHAEL J 12,0'/ 2*= 6.0 $330.00 $330.00 13- 0546 -0000 1049 W 10TH AVE CARTWRIGHTIKELLY M MAGUIRE TIMOTHY P 12.0'/ 2 = 6.0 $330.00 $330.00 TOTALS $660.00 $660.00 CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION SHEET 2 OF 2 2412 ASSESSMENT RATE$: CITY OF OSHKOSH CONCRETE PAVING $0' CONCRETE PAVEMENT (R -11R -2 RESIDENTIAL) = $55.00 PER LINEAR FOOT ENGINEERING DIVISION SPECIAL ASSESSMENTS CONTRACT NO. DRAWN 12 -05 11!2212011 WEISBROD STREET WARD REVISED 12.0' SOUTH OF W. 10TH AVE, 13TH TOW, 1 0TH AVE. W. 6TH AVE. 3 - - - ... .............. ¢ 8 � 7 6 k 3 1 -_. - - - -- _.J._._.. R 2 14 2 ZO I N C -1 ° zoNi LOCK 1 IN EST 2 3 al" 4 5 6 7 5 9 70 x-11 1 20 6 a LOCK, 2 IN 'ESTI ENT P.QCN Sk 13 no 1048 1038 22 - I r- -21 20 19 18 17 16 1$ 14 +_13 12 1164 1158 11 152 1142 1136 1132 1126 1122 1116 1112 1102 66.0' 1 66.0 I 100.0' 50.0 50.0 50.0' 1 50.0' 1 50.0 50.0' 1 100.0' W. 7TH AVE. 66.0' 66.0' 50.0' 50.0' 50.0' 500 50.0' 1 50.0' 50.0' 1 50.0' 1 50.0' 50.0' 1 50.0' 1163 1157 1153 1145 1143 1137 1131 1127 1121 1117 1113 1107 1103 1147 z 1 2 3 4 5 5 7 8 9 iD 11 r 51LOCKI3 INVESTMENT V�pDN ?.4 _I 23 22 21 I 20 I 19 I 16 I 17 1 16 I 15 C� z 5 1 I N 12 11 . i o U C -2 ZONING 50.0' 50.0' 50.0' 50.0' 1 50.0 - 1 50.0' 50.0' 50.0' 115.0' 1051 1043 1039 1033 1029 1023 1017 1013 .3 t. 15 �n o L/7 1 2 3 4 5 6 7 3 8LCCK INWESTP,JENT J�DDN 1 - ---- - - - -`h - WR' ' PLAT #8 , 14 13 12 11 10 9 6 2 ZO NI 1` 1 07 f lename: 07thw1t.dwq 0 TO BE ASSESSED NON - RESIDENTIAL. RATE CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT N0. I DRAWN 12 -05 11 -22 -2011 GRAPHIC 0 25 50 10a SCALE (IN FEET) PAGE 1 OF 3 CONCRETE PAVING, APRON. SIl"ALK AND WATER, SANITARY & STORM LATERAL ASSESSMENTS WEST 7TH AVENUE S. SAWYER ST. TO KNAPP S7 N ® ®IV1M E. R 2 ZONING' C -1 ° zoNi LOCK 1 IN EST ENT PDDN 10 1 20 6 a 18 17 16 15 Sk 13 no 1048 1038 1034 1028 1024 1016 1014 loo.o• 50.0• 50.0' 50.0 50.0' 1 50.0' 50.0' 116.0 1 - ---- - - - -`h - WR' ' PLAT #8 , 14 13 12 11 10 9 6 2 ZO NI 1` 1 07 f lename: 07thw1t.dwq 0 TO BE ASSESSED NON - RESIDENTIAL. RATE CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT N0. I DRAWN 12 -05 11 -22 -2011 GRAPHIC 0 25 50 10a SCALE (IN FEET) PAGE 1 OF 3 CONCRETE PAVING, APRON. SIl"ALK AND WATER, SANITARY & STORM LATERAL ASSESSMENTS WEST 7TH AVENUE S. SAWYER ST. TO KNAPP S7 N ® ®IV1M E. PARCEL [.D. AI7DRE55 OWNER COMM ASSESSABLE CONCRETE 8.47E . FRONTAGE CALCULATION LINEAR FEET RAVING ASSESSMENT EXISTING APRON CONCRETE APRON SIDEWALK SANITARY LATERAL RELAY STORM SEWER LATERAL 7TH TOTAL 969829.1300 1164 W 7TH AVE LEFEBER JOSEPH M 66.0 S 3,861.00 OFF SAWYER $0.00 $562.50 $1,500,00 $750.00 $6,673,50 08-0629-1400 1158 W 7TH AVE GAUGER GARY KISUSAN 66.0 $3 CONC $157,60 75A0 $1 500.00 $750.00 $6 943.60 06. 0640-0000 1152W 7TH AVE ECKSTEIN DANIEL J 190.0 $5850.00 CONC 5255.20 675.00 S1500.00 $750.00 $9030.20 06.0638 -0000 1142 W 7TH AVE SUESS CLIFFORD L 50.0 $2 CONC $136 -00 $675.00 $1 $750.00 $5 06-0637 -0000 1136 W 7TH AVE KLINGER PROPERTIES INC 50,0 $2,925.00 CONC $202.40 S 787.50 $1,500.00 $ 750.00 $6164.90 06.0636.0000 1132 W 77H AVE SPANBAUER LUCAS D 50.0 $2,925.00 CONC $176.80 $900.00 $1,500.00 $750.00 $5,251.80 06-0635. 1126 W 7TH AVE SANOBECK CAROL F 50.0 $2 $25.00 CONC 159,20 $1 125.00 . $1 , 500.00 5750.00 $6 06-0634 -p000 1122 W 7TH AVE ROBSON KEVIN WIAMANDA L 50,0 $2 925.00 CONC $162.40 $ 900.00 $1 600.00 $750.00 $6,237.40 06.06 33.0000 1116 W 7TH AVE BARFORTH KE 50.0 $2.925.00 CONC $167.20 $787.50 $1 $ 750.00 $6,129.70 06-063240D0 1112 W 7TH AVE Q UELLA HEIDI L 100.0 $5850.00 CONC $146.40 $900.00 $1 $750.00 $9 146.40 06-0631 -0000 1102 W 7TH AVE DELAP LORI S 50.0 2925,00 OFF WYOMING $0.00 $1 ,125.00 $1,500.00 5 750.00 $6 09. 0829.1600 1163 W 7TH AV REICHENBERGER JOHN PIDEBRA K 66.0 $3861.00 OFF SAWYER $0.00 $1 $1 $750.00 S7 08-0829.1500 1157 W 7TH AVE US BANK NATIONAL ASSOC 66.0 $3 861.00 SHARED ASP $315.10 $900.00 $1,500,00 $7$0.00 $7 06. 0641 -0000 1153 W 7TH AVE DONNELLY VALERI L $0.0 J2 SHARED ASP 5322.30 $562.50 $ 1,500.00 5750.00 $ 6,054.80 00-0642 -0000 1145 W 7TH AVE DAWSONIJENNIFER NEUMEIER KEVIN 50.0 $2925.00 GRAVEL $612.00 $ 787.50 $1,500.00 §150.00 $ 6 574,50 0606434000 1143 W 7TH AVE MARTIN ALLAN F 50.0 ;2 CONC $138.00 $1,012.50 $1,500.00 $ 760.00 $ 6 , 325.50 06.06440000 1137 W 7TH AVE WILSON BRENDA A 50.0 $2,925.00 CONC $100.00 $787.50 $1 $750.00 $6 0606450000 1131 W 7TH AVE REUKAUF ALAN RISANORA J 50.0 $2 925.00 1 CONC, 1 REMOVE $ 176.80 $900.00 $1 500.00 $759.00 $6,251.80 0696460000 1127 W 7TH AVE BARTELS LYNN M 50.0 S2 925.00 CONC $123.05 $787.50 $1,500.00 $750.00 $6 085.55 06- 0647.0000 1121W 7TH AVE SCHUNKALAWOOROTHFA 50.0 $2925.00 ASP $295.40 $787.50 $1500.00 $750.00 $6257.90 06-0648 -0000 1117 W 7TH AVE TARNAWSKI RICHARD H 50.0 $2,925.00 CONC $105.60 $675.00 $1,500.00 $750.00 $5,955.60 06. 0649.0000 1113 W 7TH AVE KARGUS PROPERTIES LLC 50.0 S2,925.00 CONC 100.40 $900.00 $ 1,500.00 $ 750.00 $6,175.40 060650.0000 1107 W 7TH AVE FISHER JERRY W 50.0 $2925.00 CONC $100.00 $ 1,012.50 5 1.500.Ob 5 750.00 $ 060651 -0000 1103 W 7TH AVE OSHKOSH CENTRAL CREDIT UNION 50.0 $2,925.00 OFF WYOMING $0.00 900.00 $1 $750.00 $6 2012ASSESSMIENTJRATM 32' CONCRETE PAVEMENT (R -11R -2 RESIDENTIAL) = $58,50 PER LINEAR FOOT CONCRETE APRON = $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) SIDEWALK REHABILITATION a $4.50 PER SQUARE FOOT (ESTIMATE) SANITARY SEWER LATERAL RELAY - $1,500.00 EACH (ESTIMATE) NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH $79, 794.00 CITY OF OSHKOSH ENGINEERING DIVISION CONTRACT NO. DRAWN 12 -05 111222011 WARD REVISED 6TH I $3.951,85 $20,137.50 536,000.00 518,000.00 $157,883,35 SHEET 2 OF 3 CONCRETE PAVING, APRON, SIDEWALK AND WATER, SANITARY & STORM SEWER LATERAL ASSESSMENTS WEST 7TH AVENUE S. SAWYER ST. TO WYOMING ST. COMM. FRONTAGE ASSESSABLE CONCRETE EIOSTING CONCRETE SANITARY STORM SEWER PARCEL E.D. ADDRESS OWNER RATE CALCULATION LINEAR FEET PAVING APRON APRON SIDEWALK LRE� LATERAL 7THTDTAL ASSESSMENT 06 -0619 -0000 1048 W 7TH AVE GERTH THOMAS L 100.0'! 2" a 50.0 $2 925.00 CONC $166.40 $ 1 , 350-00 $1 500,00 $750,00 $6,691,40 06-0618.0000 1038 W 7TH AVE JONES CYNTHIA K 50.0 $2 ASP $433.57 $562.50 $1 $750.00 S6.171.07 06-0617 -0000 1034 W 7TH AVE JOHNSON ANDREW L 50.0 $2 ,925.00 CONC $211.60 $675.00 $1 $760.00 $6 , 051.60 06.0616 -0000 1028 W 7TH AVE JOHNSON Jl35TIN UAMANDA 50.0 �g 925.00 CONC $163.20 $562.50 $1 $750.00 $5 064695.0000 1024 W 7TH AVE KO EPPL DANIE JNIRGINI 50.0 2 925,0 CtlNC $ 157.20 $787.50 $1 $750.06 $6,119.70 06.0614.0000 1016 W 7TH AV PURTELL WILLIAM A 50.0 $925,00 SWARBD GRAV $755.20 $787.50 $1 $750.06 S6 06.0613 -0000 1014 W 7TH AVE MOKLER MATTHEW JIANGELA 50.0 $2 SHARED CONC $102.00 $787.50 $1 $750.00 S6 06. 0612.0000 617 KNAPP ST ALBAN DAVID W X 115.0 = 57,5 $5 CONC $675.00 OFF KNAPP OFF KNAPP $6,40415 „ 06. 0652 -0000 1451 W 7TH AVE GIERJF FERNANDEZ RICHARD D 50.0 $2,925.00 OFF WYOMING $0.00 $67$.04 S1 $ 750,00 $ 5 850.00 Oe4652 -0100 1043 W 7TH AVE MANGOL.D SCOTT W 50.0 $2,925.00 SHARED CONC $100.00 $787.50 $1 500.00 $750.00 $6.062.50 06.0653.0000 1039 W 7TH AVE JURGELLAXELLY L RATES NICHOLAS M 50.0 ; SHARED CONC $100.00 $787.50 $1 $750.90 $6 05.0654 -0000 1033 W 7TH AVE PAULICK RICHARD SIVICKIE 50,0 $2 CONC $170,80 $675.00 $1 $750.00 $6 06. 0855-0000 1029 W 7TH AVE B OUSHEL£ LIFE ESTATE RALPH JBONNIE S 50.0 $ 2,925.00 CONO $140.00 $675.00 $1 $ 750,00 $ 5990.00 06. 0656.0000 9023 W 7TH AVE KUNDINGER KAREN A 50.0 $2,925.00 CONC $118,40 S675.00 $1 500,00 $750,00 $5 968,49 06-065 7-0000 1017 W 7'TH AVE ROESKE LYLE $014 $2 CONC $100,00 $618,75 $1 500,00 $750.00 $5 06. 0658.0000 1013 W 7TH AVE BAEHMAN PETER JICYNTHIA 50.0 $2,925,00 ASP $326.47 $618.75 $1 $750,00 $6,12022 06-0659.0000 701 KNAPP ST BAEHMAN PETER XCINDY L X 115.0 = 57.5 5 629.25 { #} ASP $401,7D $675._0 OFF KNAPP OFF KNAPP $6 $55,133.50 $3,546.54 $12,375.00 $22,500.00 $11,250.00 $104,805.04 • CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION # CREDIT FOR 24125 OF 2011 7TH AVE CONCRETE PAVING ASSESSMENT TO BE APPLIED ' 2012 ASSESSMENT RATES: SHEET 3 OF 3 32' CONCRETE PAVEMENT (RI-R2 RESIDENTIAL) _ $58.50 PER LINEAR FOOT - 32' CONCRETE PAVEMENT (NON RESIDENTAQ = $97,90 PER LINEAR FOOT CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, CONCRETE APRON - $4,00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) ENGINEERING DIVISION SANITARY & STORM SEWER LATERAL ASSESSMENTS SIDEWALK REHAS3 LJTATION - $4.50 PER SQUARE FOOT (ESTIMATE) CONTRACT NO. DRAWN SANITARY SEWER LATERAL RELAY - $1,500.00 EACH (ESTIMATE) 12.05 11/2272091 WEST 7TH AVENUE NEW STORM SEWER LATERAL FOR SUMP PUMP w $750.00 EACH WARD REVISED WYOMING ST. TO 67 H KNAPP ST, 90.0' 793 S. SI� . j PARCE # 06-0682-0000 �� 2.0' S. SAWYER ST. 122.0' N w N N W4. a N PAGE 1 OF 2 filename: 07th, sowye r.dwg CITY OF OSHKOSH CONCREM PAVING SPECIAL. ASSESShOM E'NGINE'ERING DIVISION CONTRACT N0. DRAWN S 0UTH SAWYER STREET 12 - 05 02 - 1b - 2012 GRAPHIC G %0 100 25.0 FEEF SOUTH OF W. 77H AVE.70 SCALE: (IN FFZT) MO FEET NORTH OF W. 7TH AVE. 90.0' rn w� N N N COMM. FRONTAGE ASSESSABLE CONCRETE PAVING SAWYER PARCEL I.D. ADDRESS OWNER RATE COMM. RATE CALCULATION LINEAR FEET ASSESSMENT TOTAL DIRECT BILL TO 06 -0682 -0000 713 S SAWYER ST CITY OF OSHKOSH CITY 06 -0829 -1600 1 163 W 7TH AVE REICHENBERGE J OHN P /DEBRA K 25.0'/ 2* = 115 $731.25 $731.25 06- 0829 -1300 1164 W 7TH AVE LEFEBER JOSEPH M 25.0'/ 2' = 42.5 $731.25 $731. TOTALS $4,462.50 $1,462.50 * CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION SHEET 2 OF 2 2012 ASSESSMENT RATES: CITY OF OSHKOSH CONCRETE PAVING 48' CONCRETE PAVEMENT (R -11R -2 RESIDENTIAL) = $58.50 PER LINEAR FOOT ENGINEERING DIVISION SPECIAL ASSESSMENTS CONTRACT NO. DRAWN 12-05 11/22/2011 SOUTH SAWYER STREET WARD REVISED 25.0' SOUTH OF W. 7TH AVE. TO 6TH 25.0' NORTH OF W. 7TH AVE. _a z .0' I 0 ,K 1 IPJVESTti•1 NT ADDi w LDCK .3 BLOCK z ._ iP.r1EN f ABUN 0 a u o r a Ln L 4- MI W - cn p ° 1s.0� X15.0 WYOMING ST. h N _ _0 122,0' 90.0' w > o L -. co r t o ~ f Y 4 VESTMENT ADDN PAGE 1 OF 2 (i I en a m c: 7th, w yo m In g. d wg CITY OF OSHKOSH ATE MING SPEaAL ASSESSMOM ENGINEERING DIVISION CONTRACT NO, DRAWN WYOMING STREET 12 -05 11 -17 -2011 GRAPHIC a xs so 10Q 1 5.0 FEET SOUTH OF W. 7TH AVF— TO SCALE: (IN FEET) 15.0 FEET NORTH OF 7TH AVE, _a D .0' I 0 _a D ov I 0 ,K 1 IPJVESTti•1 NT ADDi w PARCEL I.D. ADDRESS OWNER COMM. RATE FRONTAGE CALCULATION ASSESSABLE LINEAR FEET CONCRETE PAVING WYOMING ASSESSMENT TOTAL 06 -0631 -0000 1102 W 7TH AVE DELAP LORI 5 15.0'1 2*= 7.5 $438.75 $438.75 06- 0 619 -0000 10 W 7TH AVE GERTH THOMAS L 15.0'1 2*= 7.5 $438,75 $438.75 06- 06 51 -0000 1103 W 7TH AVE OSHKOSH CEN TRAL CREDIT UNION 15.0'/ 2 = 7.5 $438.75 # $438.75 0 6 -0652 -0000 1051 W 7TH AVE GIER/F FERN RICHARD D 15.0'/ 2*�-- 7.5 $438.75 ( #) $438.75 TOTALS $1,755.00 $1,755.00 CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION # CREDIT FOR 5112 OF 2005 WYOMING ST ASPHALT PAVING ASSESSMENT TO BE APPLIED SHEET 2 OF 2 2012_ ASSESSMENT RATES;_ CITY OF OSHKOSH CONCRETE PAVING 32' CONCRETE PAVEMENT (R - 11R - 2 RESIDENTIAL) = $58.50 PER LINEAR FOOT ENGINEERING DIVISION SPECIAL ASSESSMENTS CONTRACT NO. DRAWN 12 -05 1112212011 WYOMING STREET WARD REVISED 25.0' SOUTH OF W. 7TH AVE. TO 6TH 25.0' NORTH OF W. 7TH AVE, R -2 ZONING W. 5TH AVE. W. 6TH AVE. e C- 1 10 47.5' 935 11 47.5 921 47.5 917 47.5' 911 / 20 -1 22 23 24 25 26 7 - 26 29 30 31 32 33 34 35 35 37 38 / 22 , LULL' 24 14 0 PR GRE _.. PL ANN'A 3 IS ADD q, PRO k 953 IVE iOME LOC6 2 1 LOC 1 19 113 77 16 15 14 13 12 11 10 9 8 7 6 5 '`� 5 � 3 2 1 58 95/950 944 940 934 930 926 920 914 910 906 900 830 826 822 816 812 808 802 / ; 11.5.8'/ 50.0' 50.0' 50.0' 50.0' 50.0' 50.0' 50.0' 50.0' 50.0' 1 50.0' 50.0' 1 50.0' 1 50,0' 50.0' 1 50.0' 1 50.0' 50.0' W. 6TH AVE. e C- 1 10 47.5' 935 11 47.5 921 47.5 917 47.5' 911 12 C -2 ZONING W. 7TH AVE. - 1 F R -2 ZONING G 49 ' 47.5 943 47.5' 935 95.0' 927 47.5 921 47.5 917 47.5' 911 47.5' 907 47.5' 9Q3 817 18 17 18 ML-19 20 21 22 23 24 14 0 PR GRE SIVE� HOII PL T PRO k 953 IVE iOME PLAT BLOC 1 LOC 1 9 8 7 E I '`� 5 � 4 3 2 1 m C7 D: 47.5' 47.5' 47.5' 47.5 47.5' 47.5' 4$.V 831 825 821 817 813 809 801 8 9 10 81 7A 12 13 14 0 PRO RES IVE iOME PLAT LOC 1 5 5 4 3 2 1 fliename: A G N n 107 PAGE 1 OF 8 E:2 TO BE ASSESSED NON - RESIDENTIAL RATE PARCELI.D. ADDRESS OWNER COMM. FRONTAGE ASSESSABLE RATE CALCULATION LINEAR FEET CONCRETE PAVING ASSESSMENT EXISTING APRON CONCRETE APRON SIDEWALK SANITARY LATERAL RELAY STORM SEWER LATERAL 6TH TOTAL 06-0437 -0000 954 W 6TH AVE 954!958 W 6TH AVENUE LLC X 115.8 $12 # CONIC $480.40 $1 669.50 $1 500.00 OFF KNAPP $16 , 457.38 060435-0000 944 W 6TH AVE FINK MARY E 50.0 P,925.00 SHARED ASP $427.42 $1 $1 $750.00 $6,675,67 064434.0000 940 W 6TH AVE RUPNtCK WILLIAM L 50.0 $2 925.00 SHARED ASP $395,80 $954.00 $1 500.00 $ 750.00 $6,524.80 06- 0433-0000 934 W 6TH AVIw KASPER ESTWER 50.0 $2.M.00 CONC $302.80 15.50 $ 1,500.00 $750.00 $6 06- 0432 -0000 930 W 6TH AVE GRUETZMACHER ELIZABETH M 50.0 $2 925.00 SHARED CONIC $297.20 $834.75 $1 $750.00 $6,306,95 06. 04314000 9 26 W 6TH AVE JOHNSON LINDA M 50.0 $2,925.00 SHARED CONC 5166.00 $715.50 $1,500.00 $750.00 $6, 056.50 06. 0430 .0000 920 W 6TH AVE PUT PHYLUS M 50.0 $2 .925.00 CONC $265.20 $954.00 1 500.00 5750.00 $6,39420 06-0429 -0000 914 W 6TH AVE WEGNER MARA M 50.0 ;2 CONO $354.40 $834.75 $1 $750.00 $6 06- 0428-0000 910 W 6TH AVE BRAUNISTACY E GUST STEPHEN A 50.0 $2,925.00 CONC $313.60 $596.25 $1,500.00 $750,00 $6 08- 0427 -0000 906 W 6TH AVE ANKLAM JAM A 50.0 $2,925.00 SHARED CONC $291.20 $596.25 $1,500.00 $750.00 $6 062.45 060426-0000 900 W 6TH AVE WOLF ROGER J 50,0 $2 SHARED GONG $253.60 $834.75 $1 $750.00 $6,263.35 06. 04254000 830 W 6TH AVE FREEMAN WALTER EIJANIC 50.0 . $2,925-00 GONG S 321.60 $954.00 $1,500.00 $750.00 S6, 450.60 06 0424-0000 826 W 6TH AVE MALLIETT ROBERT CILAURIE 50.0 $1925.00 CONC $321.60 $715.50 $1 $750.00 $6 06- 0423-0000 822 W 6TH AVE FASHINGBAUER DANIEL R 50.0 51925.00 CONC $377.60 $715.50 $1 $750.00 $6 060422 -0000 816 W 6TH AVE WILLIAMS KRISTOPHER R 50.0 $2 SHARED GRAV $537.60 $834.75 $1 $750.00 S6 060421.0000 812 W 6TH AVE W EISBACH PAUL J 50.0 S2 925.00 SHARED, CONIC $258.40 _ $715.50 $1,500.00 $750.00 $6148.90 06.0420.0000 808 W 6TW AVE WESTPHAL MATTHEW M 50.0 $2 GONG $464.80 $596.25 $1 $750.00 $6 06-0419-0000 $02 W 6TH AVE SCHETTLE SCOTT LILISA A 50.0 $2 ,925.00 OFF IDAHO $0.00 $954.00 $1,500,00 $750,00 $6129.00 $62,532.48 $5,829.22 $15,264.00 $27,000.00 $12,750.00 $123,37570 # CREDIT FOR 24125 OF 2011 6TH AVE. CONCRETE PAVING ASSESSMENT TO BE APPLIED 2012 ASSESSMENT RATES. SHEET 2 OF 8 32'1 W CONCRETE PAVEMENT (R -11R -2 RESIDENTAL) - $58.50 PER LINEAR FOOT 32' CONCRETE PAVEMENT (NON RESIDENTIAL) m $97.90 PER LINEAR FOOT 36' CONCRETE PAVEMENT (NON RESIDENTIAL) - $110.60 PER LINEAR FOOT CONCRETE APRON - $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, SIDEWALK REHABILITATION - $4.50 PER SQUARE FOOT (ESTIMATE) ENGINEERING DIVISION SANITARY & STORM SEWER LATERAL ASSESSMENTS SANITARY SEWER LATERAL RELAY - 51,500.00 EAOW (ESTIMATE) CONTRACT NO. DRAWN NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH 12 -05 11/2212011 WEST 0TH AVENUE (north side) WARD REVISED KNAPP ST. TO 6TH IDAHO ST, PARCEL I.D. ADDRESS OWNER COMM. FRONTAGE ASSESSASLE RATE CALCULATION LINEARFEET CONCRETE ASSESSMENT EXISTING APRON - CONCRETE APRON SIDEWALK SANITARY LATERAL STORM SEWER LATERAL 6TH TOTAL 06.0529.0000 959 W 6TH AVE HURKMAN RICHARD W X 49.8 $ 5,507.88 (A) NONE $ 0.00 $954,00 OFF KNAPP OFF KNAPP $6,461.68 06.0530-0000 9$3 W 6TH AVE LEE MICHAEL J 47.5 S2,778.75 CONG $173.20 $1,073,25 $1,500.00 $750.00 $6,275.20 0"531- 0000 9 49 W 6TH AVE OCONN THOMAS J 47.5 $2,77'8.75 CONC $250.40 $ 715.5 0 51 500.00 $750 00 $6 994.65 06 -0532 - 0000 943 W 6TH AVE KINGSLEY DARYL HIMARY B 47.5 $2,778.75 CONC $231.60 $715.50 $1, 500.00 $ 750.00 S5,975,85 06.05330000 935W 6TH AVE PHIL LIPJEANNEG 47.5 $2778.75 ASP $486.90 $ 715.50 $1,500.00 $750.00 $ 6233,1$ 06.05340000 927 W 6TH AVE BERNDT MICHAEL D 95.0 . $$,S57.50 GONG $360.80 $1.073.25 $1,500.00 $750.00 $ 9.241,55 06- 05364000 921 W 6TH AVE STEARNS MRlMRS RICHARD F 47.5 $2,7713.75 SHARED CONC $260.40 $ 834.75 $ 1,500.00 $750.00 $6123.90 06-0537 -0000 917W6THAVE WITTKOWSKIMRIMRS WILLIAM G 47.5 52778.75 SHARED CONC $207.60 $ 715.50 $1500.00 $750.00 $5951.85 06-0536.0000 911 W 6TH AVE BREWER/KtMBERLY L DORM NICHOLAS J 47.5 $ 2,778.75 SHARED CONC $229.60 $ 834 75 $1 500,00 $750.00 $6,093.10 06.0539-0000 907 W 6TH A VE GONZALES MARK E 47.5 S2 778.75 SHARED COMO $221.60 $834.75 $1,500 .00- $ 750.00 $6.005,10 060540.0000 903 W 6TH AVE ANSFIELO PROPERTIES LLC 47.5 S2778.75 OFF RUGBY SO.00 - $ 834.75 $1,500 $750.00 $5,863,50 C6. 0512 -0000 831 W 6TH AVE ATCHISON ROBERT WIELLEN A 47,5 $2,778,75 OFF RUGBY 50.00 $715.50 51 500.00 V50.00 $5,744.25 06 -0513 -0000 825 W 6TH AV KNOLL ROBERT W 47.5 $2,778.75 CONG $321.60 $596.25 $1,500.00 3 750.00 $5 06.05140000 824 W 6TH AVE SCHNEIDER THDMAS WONNIE 47.5 $277815 SHARED CONC $254.CO $ 715,50 $1,500.00 $ 750.00 $5998.25 06.0515.0000 817 W 6TH AVE STADLER MARK R/RALPH A 47.5 $2,778.75 SHARED CONC $219.20 $ 954.00 $1,500.00 $750.00 $ 6 201.95 06-0516-0000 613 W 6TH AVE PAULSON LANA M 47.5 S2,778.75 CONC $288.60 $715.50 . $1 . 500,00 $750.00 $6033.05 06-0517 -0000 600W 6TH AVE KREBSSUZ,ANNEA 47.5 52778.75 CONC $288.00 $596.25 $1500.00 $750.00 $ 5913,00 06-0517 -010 601 W 6TH AVE SCHROEDER JAM H/SUSAN M 48.0 S2808.00 OFF ZAHO $ 0.00 $ 715.50 $1,500.00 $750.00 $ 5,773.50 $55,554.63 $3,795.70 $14,310.00 $25,500.00 $12,750.00 $391,910.33 # CREDIT FOR 24/25 OF 2011 6TH AVE. CONCRETE PAVING ASSESSMENT TO BE APPLIED 2012_ ASSESSMENT RATES: 32'1 39 CONCRETE PAVEMENT (R -11R -2 RESIDENTAL) - 358.50 PER LINEAR FOOT 36' CONCRETE PAVEMENT (NON RESIDENTIAL) - $110.60 PER LINEAR FOOT CONCRETE APRON = $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) - SHEET 3 OF 6 SIDEWALK REHABILITATION - $4.50 PER SQUARE FOOT (ESTIMATE) SANITARY SEWER LATERAL RELAY - $1,500.00 EACH (ESTIMATE') CITY OF OSHKOSH CONCRETE PAVING. APRON, SIDEWALK AND WATER, NEW STORM SEWER LATERAL FOR SUMP PUMP - $750.00 EACH ENGINEERING DMSION SANITARY & STORM SEWER LATERAL ASSESSMENTS CONTRACT NO. DRAWN 12.05 11!22!2013 WEST 6TH AVENUE (south sloe) WARD REVISED KNAPP ST. TO 67H I IDAHO ST. N W. 5TH AVE. 35 35 3, 38 ANNA NI. L JLL'5 15T DDN 4 1 3 1 2 1 1 PRO( 11 12 13 14 ESS VE HOME 11 l t2 PLAT HOCK 17 1 20 4 3 2 1 PARCEL /06- 0214 -0000 1os 107 106 - Q0 p Q Q 102 m a4. n T O0 ,� y I CI RF AT 101 �- ZONI_NG�_yG ,ao filename: #3 f m3 PAGE 4 OF 8 TO BE ASSESSED NON -- RESIDENTIAL RATE 13 11 l t2 13 1 15 16 17 16 20 l R 2 ZONI G 21 NNA M. ULL'S 1 T AD N. B _OCK 1 IN 10 -r 9 �60� a 7 5 5 4 3 2 1 702A 748 744 738 732 726 720 708 702 1 eL s0.0 50.0' 50.0' 75.0' 50.0' 500 50.0 80.V W. 6TH AVE. 305.9' 1 66.0' 729 50.0' 719 125.65 717 745 W 6TH AVE 729A 104 103 d PARCEL /06- 0214 -0000 1os 107 106 - Q0 p Q Q 102 m a4. n T O0 ,� y I CI RF AT 101 �- ZONI_NG�_yG ,ao filename: #3 f m3 PAGE 4 OF 8 TO BE ASSESSED NON -- RESIDENTIAL RATE PARCEL I.D. ADDRESS OWNER COMM. FRONTAGE RATE CALCULA71ON ASSESSABLE LINEAR FEET CONCRETE AS PASVIIMINT EXISTING APRON CONCRETE APRON SIDEWALK NEW 4 "SAN & UNITARY 7 "WATER LATERAL STORM SEWER LATERAL 6TH TOTAL 06-04 8-000 780 W 8TH AV RY DEN DL LLC X 98.0 $ 9.69 , 4.20 NONE $0.00 „ $054.00 RECONNECT RECONNECT $ - NS 06-040 8-0000 748 W 8T AVE KAI R15 JAMES Al,fE M 50.0 $2. 925.00 ASP $555.85 $954.00 $ 5 75D100 S61664.65 06.0407.0000 746 W BTW AVE REICHENSERGER PATRICIA/PAMELA 50,0 $2 SHARED CONC 5320 $DS4,00 $1 $750.00 $6,382.20 06- 040&0000 738 W 9TH AVE P OESCHL VIRGINIA 50.0 $2,M.DD SHARED CONC $187,60 $i 073.25 $ 1,500.00 $750.00 $6,435.85 1 CCNC, 1 06.0405-0000 732 W 6TH A VE REESE JAMES C 75.0 $4 GRAY $_1, 080.40 $834.75 $1,500.00 $750.90 $ 8,552.85 0&040441000 726 W 8TH AVE REES JAME C 50.0 $2 925.00 SHARED CONC $ 275.20 S715.50 $ 1,500.00. _ $750.00 __$8 185.70 08-0403.0000 720 W 8TH AVE REESE RICHARD M 50.0 $ 2,925.00 SHARED CONC $ 287.80 $ 715.50 $ 1,500.00 $750.00 $8 178.10 OB43402 7 W 9TH AVE REESE WAYNE A 50.0 $ 2,925.00 CONC $335.20 $715.50 $1,500.00 $750.00 $ 8,225.70 06.0401.0000 702 W 8TH AVE R 5E ANTHONY A 80.0 $ 4,980,.00 OFF DAKOTA ;0.00 31,07 OFF DAKOTA OFF DAKOTA $ 5,753,15 DIRECT BILLTO 013- 0214.0000 745 W 8 AVE G1T OF OSWKOSH PARK CITY 0 8.0212 -0000 729 W 6TH AVE BRECHLIN MICWA A 68.0 $3 881 00 OONC $296.80 $834.75 $1,500.00 $750.00 $ 7 2.55 08-0211-0 719 W 8TH AVE R EES E ROBERT S 50.0 ..$2.925,00.. CONC $ 412.00 $ 595.25 $ 1,500.00 $750.00 $6183.25 08-0210.0000 717 W 8 7W AVE STECKBAUER JAMS$ 125,65 $ 7, %0.53 CONC $228.80 $1,073.25 .51,500.00 ___________$750.00 $10 002.58 08 .0210.0100 VACANT LOT R EESE WAYNEIJANICE 58.4 53299.40 NONE .00 598.25 $5 300.00 $0.00 $750.00 $9,945.65 06-020 8 08 DAKOTP S MAINS CONRA NROBiN 1, 9.8 $573.30 OFF DAKO $0.00 5233.73 OFF DAKOTA OFF DAKOTA _ $807.03 _ _ $54,220,93 S3,91245 $11,323.98 $5,300.00 $15,000.00 $8,250.00 $98,007,38 ' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION 2012 ASSESSMENT RATES: 32 CONCRETE PAVEMENT (R -11R•2 RESIDENTAL) _ $58.50 PER LINEAR FOOT SHEET 5 OF 8 32' CONCRETE PAVEMENT (NON RESIDENTIAL) _ $97.90 PER LINEAR FOOT CONCRETE APRON - $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) SIDEWALK REHABILITATION - $4.50 PER SQUARE FOOT (ESTIMATE) CITY OF OSHKOSH CONCRETE PAVING, APRON, SIDEWALK AND WATER, SANITARY SEWER LATERAL RELAY = $1,500.00 EACH (ESTIMATE) ENGINEERING DIVISION SANITARY STORM SEWER LATERAL ASSESSMENTS NEW STORM SEWER LATERAL FOR SUMP PUMP = 5750.00 EACH CONTRACT NO. DRAWN 12 .05 11!27!2011 WEST 0TH AVENUE WARD REVISED IDAHO ST. TO 81y+, DAKOTA ST. J 19 > 20 n 135 1 134 I 133 i 130 1D2 m > CIT`''S REPLAT #3 -4 7 01 (n W. 5TH AVE. 129 RJ � � 7 I 0 ' ING � 123 12$ 176 125 I iza � 12z N ZO I NG ' ITY'S EPLAT '� y o . .... 8 I / _+ ZON �� 110 111 112 114 _l 115 116 11, 118 119 E a2 131 / 668 j 662 658 650 644 640 634 628 624 620 36.2' 1D2 m > CIT`''S REPLAT #3 -4 7 01 (n W. 5TH AVE. 129 RJ � � 7 I 0 ' ING � 123 12$ 176 125 I iza � 12z N ZO I NG ' ITY'S EPLAT '� y o . .... 8 I / _+ ZON �� 110 111 112 114 _l 115 116 11, 118 119 in 121 a / 668 j 662 658 650 644 640 634 628 624 620 6E4 ; 610 ',60660 /14> 50.0' 61.0' 75.0' 56.08 50.4' 50.4' 54.4' 46.4' 50.0' 50.0' 54.0' 66.05' 7 W. 6TH AVE. 50.0' 66.0' 66.0' 66.0' I, 66.0' 66.0' 66.0' 61.35 59.0' 50.0' 50.0 50.0' 50.0' ' $ 681 673 669 663 657 649 643 637 631 625 617 615 , 609 d 6 65 92 $s 90 89 89 87 85 5 �+ 0 F Y 97 j 96 1 95 94 93 0 99 CIT 'S RE . LAi # n R- ZO ING U) , a 73 80 81 82 93 84 ; �I W. 7TH AVE. 76 II 75 I 74 I 73 1 72 1 71 filename: 13 1 114 1 15 1 16 ON ', 4 i PAGE 6 OF 8 TO BE ASSESSED NON - RESIDENTIAL RATE PARCEL I.D. ADDRESS OWNER FRONTAGE ASSESSABLE COMM. RATE CALCULATION LINEAR FEET CONCRETE PAVING ASSESSMENT EXISTING APRON CONCRET E APRON SIDEWALK SANITARY LA'TERA'L RELAY STORM SEWER LATERAL 6TH TOTAL 0"23&0000 518 DAKOTA ST H ENDRICKS THOMAS PIMARY M 36.2 $211770 OFF DAKOTA $715.50 OFF DAKOTA OFF DAKOTA $2 833.20 SHARED CON, 0 6-0216.0000 668 W 6TH AVE FAUST LEE D X 248.2 $ 24,298.78 2 CON $ 162.40 $1,4M.00 $1,500.00 5750.00 $ 060217.0000 662 W 6TH AVE PAUL JOSHUA M 50.6 $2,925-00 SHARED CONC $246.40 $1 $ 1,500100. $750.00 $6494.66 06. 02 18-0000 $59W 6TH AVE SCHLICHTIN 61,0 $3568.50 CONC $351.20 5596.25 $1 500.00 750A0 $6765.95 OM219.0000 650 W 6TH AVE SARGENDER DIANA L 75.0 $4,3e7.50 CONC $347.20 $954.00 $1 $750.00 $7,938.70 06-0220. 0000 644 W 6TH AVE FINK THOMAS B 56.68 $3 CONC $25B.80 $715.50 $1 $750.00 $6 06- 0221.0000 640 W 6TH AVE ROUGEUX SOOTTILINOA 50.4 $2,948.40 CONC $303.60 $596.25 $1,500.00 $750.00 $6 098.25 060222 -0000 634 W 6TH AVE BANK OF NEW YORK ME LLON 50,4 $2 CONC $581,60 $834.75 $1 ,500.00 $750.00 $6, 614.75 0&0223.0000 628 W 6TH AVE JORGENSEN KENNETH E 50.4 $2 CONC $436.80 $ 715.50 $1,500.00 $750.00 $ 6350.70 0 6-0224.0000 624 W 6TH AVE NSEMUTH MR7MRS M WAYNE 46.4 $2,714,40 CONC $ 363.20 $954.00 $1,500.00 $ 750.00 $8281.60 06-0225-0000 620 W 6TH AVE BAUER JEROME J 50.0 $2 CONC $304.40 $ 596.25 51,500.00 $750.00 $6 075.65 06-0226A000 614 W 6TH AVE MCMAHON CATHLEEN A 50.0 $2 ,925.00 CONC $259.20 5 715.50 $1,500.00 $750.00 $6 1a9.7o 06-022 -0000 610 W 6TH AVE KAUFMANN RICHARD L 50 0 ;2,925,00 CONC $146.40 $715.50 $1 750.00 $6,036.10 0&022 8-0000 600 W 6TH AVE TRITT LEE J 66.05+ 16.68'12 73.89 S4.322.57 (9) CONC $100.00 5715.50 $1,500.00 O FF OHIO IS 638,07 $65,235.33 33,881,20 $11,328.75 $19,500.00 59,000.00 $108,945128 " CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION 9 CREDIT FOR 21125 OF 2006 OHIO ST. CONCRETE PAVING ASSESSMENT TO BE APPLIED 2012 AS$E.S.SMEM1T RATES; 32 CONCRETE PAVEMENT (R -11R -2 RESIDENTAL) - 558.50 PER LINEAR FOOT SHEET 7 OF 8 32' CONCRETE PAVEMENT (NON RESIDENTIAL) - $97.90 PER LINEAR FOOT CONCRETE APRON - $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) SIDEWALK REHABILITATION s $4.50 PER SQUARE FOOT (ESTIMATE) SANITARY SEWER LATERAL RELAY - $1,500.00 EACH (ESTIMATE) CITY OF OSHKOSH ENGINEERING DIVISION CONCRETE PAVING, APRON, SIDEWALK AND WATER. SANITARY & STORM SEWER LATERAL ASSESSMENTS NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH CONTRACT NO. DRAWN 12 -05 11122/2011 WEST 6TH AVENUE (north side) WARD REVISED DAKOTA ST. TO 6TH OHIO ST. PARCEL I.D. ADDRESS OWNER COMM. RATE FRONTAGE CALCULATION ASSESSABLE LINEAR FEET CONCRETE PAVING ASSESSMENT EXISTING APRON CONCRETE APRON SIDEWALK SANITARY LATERAL RELAY STORM SEWER LATERAL 6TH TOTAL 06. 0206-0000 687 W 6TH AVE BAUER MICHELLE A 53.4' * 9.3'12 58.05 $3 395,93 OFF DAKOTA $0.00 $634.75 $i 500.00 OFF DAKOTA $5,730.68 060204-0000 681 W 6TH AVE POSTL ERIG G 50.0 9 2 925.00 ASP $449.55 $83415 $1, 500.00 $750.00 $6 06 -0203 -0000 673 W 6TH AVE OT ETAL GERALD T 66.0 S 3861.00 CONC 5 302.80 $834.75 $1,500.00 $750.00 3 7 248.55 06-0 - 0000 665 W 6TH AVE COMBES FRANK LlLISA A 66.0 S3,851.00 CONC S435.60 $954.00 Si 500.00 $750.00 57,500.60 06. 02014000 663 W 67H AVE PORIOR JOHN JNICKI 68.0 S3 SHARED CONC 5282.40 $1311-75 $1 500.00 750.00 $7 705.15 06- 0200-0000 657 W 67H AVE STRATTON LANCE RIJENNIFER 66,0 P SHARED CONC $248.80 $715.50 $1 $750.00 $7,075.30 06.0199.0000 649 W 6TH AVE DAHLKEIEDWARD J WOOD MICHELLE S 66.0 S3 CONC $294.00 $1,073.25 1'5c0.00 $750.00 $7 478,25 06-0198-0000 643 W 6TH AVE REINKE MPlMRS W AYNE C 66,0 $3,861,00 CONC $308.40 $1 073.25 $t 500,00 . $750.00 $7,492.65 OB-0197 -0000 637W6 THAVE SCHMIDTDANEELJ 61.35 $358898 CONC 32.82.00 $107325 $1500.00 5 750.00 $7294.23 06.0196.0000 631 W 6TH AVE DELFOSSE SHIRLEY M 59.0 S3.451.50 GRAVEL $705.20 $ 715.50 $1,500.00 $750.00 $7 064195.0000 625 W 6TH AVE QUINT LIFE ESTATE DONALD/JOYCE 50.0 $2 CONC $280.00 $954.00 $1 500.00 $750.00 $6 409.00 06 0194-0000 617 W 6TH AVE BAYER DAVID AIANNETTE $0.0 $2 CONC $176.00 $8'.+1.75 $1 750.00 $6,286.75 060193 -0000 615W 6TH AVE SPATT LAUREEN A 50.0 T12 925.00 CONC $210.00 31192.50 $1500.00 $750.00 46,577.50 OC 0192. 0000 609 W 6TH AVE PHILUPSlP PHILLIPS LOR> =Fi'A M 50.0 92 925.00 GRAVEL $443.20 5834.75 ;1 $750.00 $6452.95 06-0191 -0000 601 W 6TH AVE SHOWERS MARK W X 57AT + 15.7T 12 w 65.295 $7 CONC $100.00 $596.25 OFF OHIO OFF OHIO $7,917.88 $55,449.04 $4,717.95 513,833.00 $21,000.00 $9,750.00 $104,749,99 • CALCULATION $NCLUDING LONG SIDE CORNER LOT DEDUCTION - A CREDIT FOR 21125 OF 2008 OHIO ST. CONCRETE PAVING ASSESSMENT TO BE APPLIED 20124S.S.ES S M E N LLB AT E S'. 32'! 36' CONCRETE PAVEMENT (R -11R -2 RESIDENTAL) = 558.50 PER LINEAR FOOT SHEET 8 OF 8 32' CONCRETE PAVEMENT (NON RESIDENTLAL) _ $97.90 PER LINEAR FOOT 36' CONCRETE PAVEMENT (NON RESIDENTIAL) _ $110.60 PER LINEAR FOOT CONCRETE APRON m 54.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) SIDEWALK REHASIUTATlON = $4.50 PER SQUARE FOOT (ESTIMATE) SANITARY SEWER LATERAL RELAY a $1,500.00 EACH (ESTIMATE) CITY OF OSHKOSH ENGINEERING DMSION CONCRETE PAVING, APRON, SIDEWALK AND WATER SANITARY & STORM SEWER LATERAL ASSESSMENTS NEW STORM SEWER LATERAL FOR SUMP PUMP - $750.00 EACH CONTRACT NO. DRAWN 12 -05 11122!2011 WEST 6TH AVENUE (south side) WARD REVISED DAKOTA ST. TO 6TH I OHIO ST. 77 n BLO K 1 2 c 'S m �* c i V 3 BLOM 2 36 2 37 ! a fTl 1h $ 0 N 36 125.1 7" [ 300.32' 2 0 11 745 W 67H AVE _C ° 'S 1ST PARCEL #06- 0214- 0000�JI. , 07 e gL G4C 1 13 7 14 R-72 O NINSG _ CITY'S „REPLAT .,#3 _ ,oe PAGE 1 OF 2 filename: 05th, ida ha.dwg CITY OF OSHKOSH CONCRETE PAVING SPM& ASS1 15 ENGINEERING DIVISION CONTRACT' N0. DRAVM IDAHO STREET TO BE ASSESSED NON— RESIDENTIAL RATE 11 xx 09 _25-2009 0 xs 30 taa 25.0 FEET SOUTH OF W. 6TH AVE. TO GRAPHIC SCALE: (IN FEET) 25.0 FEET NORTH OF W. 6TH AVE. 77 n BLO K 1 2 13 m �* PARCEL I.D. ADDRESS OWNER COMM. RATE FRONTAGE CALCULATION ASSESSABLE LINEAR FEET CONCRETE PAVING IDAHO TOTAL ASSESSMENT 06 -0419 -0000 802 W 6TH AVE SCHETTLE SCOTT L.ILI A 25.0'12* = 12.5 8731.25 # $731.25 06- 04 09 -0000 760 W 6TH AVE LYONS DEN DL LLC 25.0'/ 2* = 12.5 $1,223.75 # - $1 06- 0517 -0100 801 W 6T AVE SCHROEDER JAMES HISUS M 25.0' /2' = 12.5 $731.25 $731.25 DIRECT BILL TO 06- 0214 -0000 745 W 6TH AVE CIT OF OSHKOSH PARK CITY TOTALS $2,686.25 $2,686.25 " CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION # CREDIT FOR 24125 OF 2014 IDAHO ST CONCRETE PAVING ASSESSMENT TO BE APPLIED SHEET 2 OF 2 2012 ASSESSMENT RATES: CITY OF OSHKOSH CONCRETE PAVING 32' CONCRETE PAVEMENT (R -11R -2 RESIDENTIAL) = $58.50 PER LINEAR FOOT ENGINEERING DIVISION SPECIAL ASSESSMENTS 32' CONCRETE PAVEMENT (NON RESIDENTIAL) = $97.90 PER LINEAR FOOT CONTRACT NO. DRAWN 12 -05 11/22/2011 IDAHO STREET WARD REVISED 25.0' SOUTH OF W. 6TH AVE. TO 6TH 25.0' NORTH OF W. 6TH AVE. 114,9' �� W � �V �P w Cp ANN A V. LUL 'S 1!;T A 7N. 14 I 05 V oo F3 P 00 15.0' 32.8' 98,7 S Sts w w N W _ � .... n - W- u �._ ..... i • o u 0 PAGE t OF 2 filename: 06th.4ak0ta.dwg CITY OF OSHKOSH CQNCREM PAVING SPECIAL A IENn ENGINEERING DIVISION CONTRACT N0. DRAWN DAKOTA STREET 12 -05 11 -30 -2011 GRAPHIC 0 25 50 100 15.0 FEET SOUTH OF W. 6TH AVE. TO SCALF-(IN FEET) 15.0 FEET NORTH OF W 6TH AVE. 114,9' �� W � �V �P w PARCEL I.D. ADDRESS OWNER COMM. RATE FRONTAGE CALCULATION ASSESSABLE LINEAR FEET CONCRETE PAVING ASSESSMENT DAKOTA TOTAL 06 -0401 -0000 702 W 6TH AVE REESE ANTHONYA 15.0'/ 2" = 7.5 $360.0 $360.00 0641238 -0000 518 DAKOTA ST HENDRICKS THOMAS PIMARY M 15,0'/ 2• = 7.5 $360.00 $360.00 06 -0209 -0000 609 DAKOTA ST MAINS CONRAD AIROSIN L 15.0' 12` = 7.5 $360.00 $360.00 0 6 -0206 -0000 687 W 6TH AVE SAUER M A 15.0'12* = 7.5 $3 60.00 $ 360.00 TOTALS $1,440.00 $1,440.00 CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION # CREDIT FOR 24/25 OF 2011 DAKOTA ST CONCRETE PAVING ASSESSMENT TO BE APPLIED SHEET 2 OF 2 2012 ASSESSMENT RATES: CITY OF OSHKOSH CONCRETE PAVING 26' CONCRETE PAVEMENT (R -1/R -2 RESIDENTIAL) = $48.00 PER LINEAR FOOT ENGINEERING DIVISION CONTRACT NO. DRAWN SPECIAL ASSESSMENTS 12 -05 11/22/2011 DAKOTA STREET WARD REVISED 15.0' SOUTH OF W. 6TH AVE. TO 6TH 15.0' NORTH OF W. 6TH AVE. a N o n CL 5 } o m 39 � � t? A ag ° o _ s N Q 5 G l 0 oZ n 0 r, z 2 La z 0 0 u _z N E Uw z a W. 6TH AVE. 47.5' 9©l 14 20 21 22 23 24 PRWRES IVE �O!M4 PLA ' LOC 'Co 0 47.5' W. 7TH AVE. } W. 8TH AVE. i - 41 5 4 3 2 PR �, ESSIVE H W PLAT 8# ,CK 5 6 5 W. 9TH AVE. 25 i 26� ] i -7 -' 28 29 30 31 32 33 34 55 36 37 3B 23 z4o PRO Any �A rr� LuL _'s � T AD n. 2 °i P � 6 5 i 4 slurp K z 1 47.5 14 S3 12 Sl 10 g 6 7 6 5 4 3 2 I 14 20 21 72 47.5' PF? j ,slvE I�o� 903 19 220--j- 1 �-� 22 23 z4o PRO RESSiL EAOI,�E PLA ° i 2--- BLOC 2 °i P � 6 5 i 4 3 2 1 47.5 14 20 21 72 23 24 PF? cRE ,slvE I�o� - P�T 3 3LOC ; 6 o B 5 5 S i 6 5 4 3 2--- i 47.5' 831 o B 5 5 S SO S SS 1 12 i i3 S S4 °i P PE2O ' 'RES I IVE O Oh�E P PLA 47.5' I I 83! I 0 6 3 10 11 12� 1 �14 PRO �RE5 IifE 041E Pe Al � ! P pCK 3 s 4 3 2 1 830 71,25' PARCEL I.D. ADDRESS OWNER FRONTAGE COMM. RATE CALCULATION ASSESSABLE CONCRETE LINEAR FEET �E SMENT EXISTING APRON CONCRETE APRON SIDEWALK SANITARY LRELAY STORM SEWER LATERAL RUGBY TOTAL 06 -0555.0000 VACANT LOT D ISCHER JtlHN J 90.08' 12* - 45.04 $2,634.84 NONE $0.00 $ 1, 6 669.50 OFF 87H 5750.00 $5 054.34 06-o574.0000 903 W 7TH AVE DISGHER JOHN J 90.08' 12' - 45.04 06-0 518.0000 902 W 7TH AVE JACKSON JAMES AIKRIS71E 90,08' 7 2• - 45.04 S 2 634.84 # CONC $338.80 1 073. S1.500.00 $750.00 $6 296.89 06.0540-0000 903 W 6TH AVE ANSFIELD PROPERTIES LLC 90.08'! 2' - 45,04 $2 CONC $174.00 ;1,073,2$ OFF 6TH OFF 6TH $3 06 -05474000 830W8THAVE KIE CKHAFER REV TRUST 90.07'12'- 45.035 $2634.55 SHAREDASP $593.17 $ 954.00 $1,500.00 5750.00 $6431.72 060548.0000 831 W 7TH AVE PETE DICKEY FISUSAN E 90.07 2" - 45.035 $2 , 634.55 # SHARED ASP $792.05 15.50 $1 750.00 $6,392.10 06 0511.0000 614 RUGBY ST 50ENING DE REKIREBECCA 90.07'! 2' = 45.035 $2 # CONO $324.80 $1,073.25 $1 $750.00 $6,282.60 06.0512.0000 B31 W 6TH AVE ATCHISON ROSER7 WIELLEN A 90.07'12' - 45.035 $2 634.55 GRAVEL $P20.40 $834.75 OFF 6TH OFF 6TH $4,389.70 $21,077.56 $3,976.42 $8,705.25 $7,500.00 $4,500.00 $45,761.23 # CREDIT FOR 8125 OF 1995 RUGBY ST. CONCRETE PAVING ASSESSMENT TO BE APPLIED 2012 ASSESSMENT RATES'. 32' CONCRETE PAVEMENT (R -11R -2 RESIDENTIAL) _ $58.50 PER LINEAR FOOT CONCRETE APRON = $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) SHEET 2 OF 2 SIDEWALK REHABILITATION - $4.50 PER SQUARE FOOT (ESTIMATE) SANITARY SEWER LATERAL RELAY - $1,500.00 EACH (ESTIMATE) NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH CITY OF OSHKOSH ENGINEERING DIVISION CONCRETE PAVING, APRON, SIDEWALK AND WATER, SANITARY & STORM SEWER LATERAL ASSESSMENTS CONTRACT NO. DRAWN 12-05 11122/2011 RUGBY STREET WARD REVISED W. 8TH AVE. 6TH I TO W, 6TH AVE, 19 20�, i � 22 23 .5' 903 240 PRO aRES�I I�IOIv1E PLA °` IVE � N k G 5 y � 3 2 1 L om s PRO W. 6TH AVE a 3 z 1 8.00K 19 20 21 22 23 24 g 70 12 13 14 2 3 2 PRa RES lVE OM PLA LOC 4 o LOC 1 y a 3 2 1 902 W. 7TH AVE. 47.5 � 47 h- H N >- m C9 W. 8 TH AVE. PAGE t OF 2 filertame: rugby,7th.dwg CITY OF OSHKOSH CONCRETE PAMNG SPECIAL AASSESSMENTS � DIVIS CONIRACT No. DR WEST 7TH AVENUE 12 - 05 11 - 17 - 2011 GRAPHIC 0 25 s0 100 MO FEET WEST OF RUGBY ST. TO 25.0 FEET EAST OF RUGBY ST. SCALE:(IN FEET) 19 20�, i � 22 23 .5' 903 240 PRO aRES�I I�IOIv1E PLA °` IVE � 2 G 5 y � 3 2 1 g 11 PRO RES IVE ION1E PLA g 30 11 12� 1 _l om s PRO s a 3 z 1 8.00K 3 �,�� 47.5' 2 3 2 47s' g 30 11 12� 1 _l W PRO REST IVE IVE O1v7E, P1.APRO T 8.00K 3 �,�� i g 2 3 2 PARCEL I.D. ADDRESS OWNER COMM. FRONTAGE RATE CALCULATION ASSESSABLE LINEAR FEET CONCRETE PAVING 7TH TOTAL ASSESSMENT 0 6- 0574.0000 903 W 7TH AVE DISCHER JOHN J _ 25,0 $1, 462.50( #) $ 06- 0518 -0000 902 W 7TH AVE JACKSON JAMES AIKRISTIE 25.0 $1 ( #) $1 ,462.50 06 -0548 -0000 8 W 7TH AVE PETERSON DICKEY EISUSAN E 25.0 $1 ,462.50 $1 0 6 -0511 -0000 $ 14 RU GBY ST BOENING DEREK/REBECCA 25.0 $1, 462.50 # $1,462.50 TOTALS $5,850.00 $5,850.00 # CREDIT FOR 8125 OF 1995 7TH AVE CONCRETE PAVING ASSESSMENT TO BE APPLIED SHEET 2 OF 2 2012 ASSESSMENT RATES: CITY OF OSHKOSH CONCRETE PAVING 36' CONCRETE PAVEMENT (R -11R -2 RESIDENTIAL) = $58.50 PER LINEAR FOOT ENGINEERING DIVISION SPECIAL ASSESSMENTS CONTRACT NO. DRAWN 12 -05 11/22/2011 WEST 7TH AVENUE WARD REVISED 25.0' WEST OF RUGBY ST. TO 6TH 25.0' EAST OF RUGBY ST. W. 6TH AVE. N /'� j + f 4� FS 87 92 91 90 Eq 'i ` `I L7 5 — z NIN 94 1 93 filename: N i PAGE 1 OF 2 j 78 79 62% 97 82 93 Bc io 13 14 t5 6 i7 636 628 624 616 612 608 602 Ll' 'S 64.63 56.0 70.2' 50.0' 50.0' _ CIT, RE F L T #3 __..,.. .,..__ 770 6_ W. 7TH AVE, 6437 56.0' 70.W 50.0' 50.0' `50.0 — 50.0' 7_ 637 629 625 617 613 607 601 76 75 74 73 72 m 71 70 = 2 3 4 5 4 j Q � 62 63 64 65 66 67 68 69 15 14 15 1G 1 i i ... � .... .......... ......... ........'.. ........ ......... W. 8TH AVE. ....... __. I �... F� filename: N i PAGE 1 OF 2 PARCEL I,q, ADDRESS OWNER CONCRETE FRONTAGE ASSESSABLE �MM• ATE CALCULATION LINEAR FEET PAVING ASSESSMENT E%ISTING APRON CONCRETE APRON SIDEWALK SANITARY LATERAL RELAY STORM SEWER LATERAL 7TH TOTAL 060184- 0000 636 W 7TH AVE HAWLEY GERALD R 64.63 $3 780.86 CONC $245.72 $ 353.25 $1,500.00 5750.00 $6 GRAVEL, ASP, 06-01854000 628 W 7TH AVE MINGLIS THOMAS G 56.0 33 & CONC $403.40 ;1 1 GONG,1 06-01864000 624 W 7TH AVE PINE INVESTMENTS OF OSHKOSH LLP 70.2 $4,106.70 GRAVICONC $ 1 19 8.a0 $681.30 $1 500.00 5 750.00 $6,236.40 06.0157 -0000 616 W 7TH AVE HENDRICKS THOMAS PIMARY M 50,0 $2 WS Oa GRAVEL $639.60 681.30 $1 500.00 $750,00 $6 06.0188 -0000 612W 7TH AVE LNVCORPORATION 50.0 $2925.00 GRAVEL S572.00 681.30 $1500.00 $750.00 $6428.30 06. 0189 - 0000 608 W 7TH AVE DETT THOMAS V 50.0 $2 CONC 222.80 $681.30 $1 $750.00 $6 06.0190-0000 602 W 7TH AVE SPA INVESTMENTS LLC 40.76'+ (12.89'12) = 47.205 $ 2,761.49 (9) OFF OHIO $0.00 $917.10 OFF OHIO OFF OHIO $3 678.59 06.0183 -0000 641 W 7TH AV HINTZ BRIAN AIWENDI J 60.0 $3 510.00 ASP $439.60 $0.00 $1 5750.00 $6199.60 06-0182 -0000 637 W 77`8 AVE BAITM LUKE A 64.77 S 3 788.05 CONC $x96.07 5 1,244.70 $1,500.00 $750,00 $7779.82 GRAVEL! 06. 0181.0000 629W 7TH AVE MAY GARY H 56.0 $3 276.00 CONC $521.60 $ 1,036.80 $1,500.00 $ 750.00 $7084.40 06- 0180.0000 625 W 7TH AVE SCHNEIDER BETTY 70.8 $ 4,141.80 GRAVEL $802.40 $562.50 $1 $750.00 S7 0 601790000 617 W 771-1 AVE LIPPERT JOHN E 50.0 $2,925.00 ASP $473.62 5 562.50 $1 500.00 $750.00 $6 084778.0000 613 W 7TH AVE DILLMAN BRIAN T 50.0 $2,925.00 GRAVEL $579.20 $562.50 $1 $750.00 $6,316,7G 06-0177 -0000 607 W 7TH AVE ANDERSON MICHAEL J 50.0 $2,925.00 CONC $214.00 681,30 $1 , 500,00 $750.00 $6 96 0176.0000 601 W 7TH AVE SCHMUT RONALDMAMES 50.0 S2� "son CONC $100.00 $ 562.50 OFF OHIO OFF OHfO S3 587.50 _ (m $49,116,90 $6,908.49 $10,342.35 $19,500.00 $9,750,00 $95,617.66 ' CALCULATION INCLUDING LONG SIDE CORNER LOT DEDUCTION S CREDIT FOR 21125 OF 2008 OHIO ST. CONCRETE PAVING ASSESSMENT TO BE APPLIED 20.12 ASSESSMENT RAMS. 32' CONCRETE PAVEMENT (R -11R•2 RESIDENTIAL) ® $58,50 PER LINEAR FOOT CONCRETE APRON - $4.00 PER SQUARE FOOT LESS ANY CREDIT (ESTIMATE) SHEET 2 OF 2 SIDEWALK REHABILITATION = $4.50 PER SQUARE FOOT (ESTIMATE) .SANITARY SEWER LATERAL RELAY = $1,500,00 EACH (ESTIMATE) NEW STORM SEWER LATERAL FOR SUMP PUMP = $750.00 EACH CITY OF OSHKOSH ENGINEERING DIVISION CONCRETE PAVING, APRON, SIDEWALK AND WATER, SANITARY & STORM SEWER LATERAL ASSESSMENT$ CONTRACT NO.1 DRAWN 12.05 1 11122!2011 WEST 7TH AVENUE WARD REVISED 391.5T WEST OF OHIO ST. 6TH TO OHIO ST.