HomeMy WebLinkAboutHGM Architecture/Chg Order Menominee Park Restrooms AIA Document G701' - 2001
Change Order
PROJECT(Name and address): CHANGE ORDER NUMBER:G-2 OWNER:❑
Menominee Park Restrooms DATE:January 16,2012 ARCHITECT:❑
Oshkosh,WI
TO CONTRACTOR(Name and address): ARCHITECT'S PROJECT NUMBER: 1111 CONTRACTOR:❑
Cardinal Construction CONTRACT DATE:October 21,2011 FIELD:❑
1183 Industrial Parkway CONTRACT FOR:General Construction
Fond du Lac,WI 54937 OTHER:❑
THE CONTRACT IS CHANGED AS FOLLOWS:
(Include,where applicable,any undisputed amount attributable to previously executed Construction Change Directives)
I. Cost to tap city water main. Add: $ 518.66
2. Place water services for winterization Add: $1,096.00
3. Contractors mark up. Add: $ 161.00
Total this change order: $1,775.66
The original Contract Sum was $ 255,910.00
The net change by previously authorized Change Orders $ -2,186.00
The Contract Sum prior to this Change Order was $ 253,724.00
The Contract Sum will be increased by this Change Order in the amount of $ 1,775.66
The new Contract Sum including this Change Order will be $ 255,499.66
The Contract Time will be increased by Zero(0)days.
The date of Substantial Completion as of the date of this Change Order therefore is March 31,2012
NOTE:This Change Order does not include changes in the Contract Sum,Contract Time or Guaranteed Maximum Price which have
been authorized by Construction Change Directive until the cost and time have been agreed upon by both the Owner and
Contractor,in which case a Change Order is executed to supersede the Construction Change Directive.
NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER.
HGM Architecture,Inc. Cardinal Construction City of Oshkosh
ARCHITECT(Firm name) CONTRACTOR(Firm name) OWNER(Firm name)
805 ►. n Street 1183 Industrial Parkway 215 Church St.
O 1 o •,WI 5491 Fond du Lac,WI 54937 Oshkosh,WI 54901
AMIN ADDRESS ADDRESS
.d1♦/].ice _(Signatur BY(Signature) •/24-4•4126-' ' BY(S nature)
Ronald D.Hansche 740 o err..�s ..1° K c e f is Q ri i Ot 1'
(Typed name) (Typed name) (Typed name)
January 16,2012 .3 -3 0 )7.—
DATE DATE DATE
AIA Document G701 TM-2001.Copyright®1979,1987,2000 and 2001 by The American Institute of Architects.All rights reserved.WARNING:This AIA®
Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this AIA®Document,or any
portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was
produced by AIA software at 09:00:45 on 01/16/2012 under Order No.0547435616_1 which expires on 03/11/2012,and is not for resale.
User Notes: (1968073078)
•
CARDINAL CONSTRUCTION CO., INC. CHANGE ORDER
1183 Industrial Parkway P. O. Box 564
FOND DU LAC, WISCONSIN 54936-0564 Number: 2012-MPO-001
Phone: (920) 922-4446 FAX: (920)922-1455
Phone: 1/9/2012
Attn: Ron Hansche Job Name: Menominee Park Restroom/Shelter
TO: HGM Architecture, Inc. Job Location: Oshkosh
805 N Main Street, PO Box 976 Job No 2012-MPO Job Phone
Oshkosh, WI 54901 Existing Contract No.: Date Existing Contract:
We hereby agree to make the change(s)specified below:
City of Oshkosh water main tapping fee, material and labor $ 518.66
-_ ---
Winterization piping to blow out the incoming 2"water main $ 1,096 00
$ -
Contractor Mark up $ 161.00
$
$
$
$
$
$
$
$ -
$
$ -
$
$
NOTE: This Change Order becomes part of and in conformance with the existing contract.
WE AGREE hereby to make the change(s) specified above at this price ADD $ 1,775.66
DATE. 1/9/2012 PREVIOUS CONTRACT AMOUNT
AUTHORIZED SIGNATURE(CONTRACTOR):
.�; ) REVISED CONTRACT TOTAL
J,riwr,^.aa.—
ACCEPTED--The above prices and specifications of this Change Order Date of acceptance:
are satisfactory and are hereby accepted. All works to be performed under
same terms and conditions as specified in original contract unless Signature:
otherwise stipulated. (OWNER)
TEAMWORK
Divides the Task---Doubles the Success
-2e12 7 44 Fr b:,r:IHERN 1a;!L35; PLUVEItIQ' 9La_ +21 21.7150 1 rEM
rap i of r
Pat Bertram
/may Frgr:: Pat Bertram[pDeqrarr( ahemciros9.C' m]
Senn Wednesday,November 16,2011 723 .Am
To; 'T ,ri Rieder'
Cc: 'HiQM Architecture'
Subject: RE Menominee Park
Thanks Torn and Ron,
Per tho `vats r Department, they new nothing about th:$and wo :lc not Jo the tap urvess We 4nec o'r en
the work order with billing I forrrL tioo. 1 believe that they are sill going lc o 11 GS but we car:Ira 7dtc this
ih°u a Change Crier.
F'at B"'rtrarr
From:Toro R!eder[nod Ito:Ttamr4cordina!-:onStructionco,Csnn]
Sent:'Tuesday, Ncvember 15, 2011 3;41 PM
To: obertram aherngross.corn
Subject: F"A', Menominee ra:e..
Pat
See be±nw.
Thanks
410--
L ' Tom Rieder :F,_
Estimator/ Project Manager
Cardinal Construction Co. Inc
Phone 92C-922-4446
Fax 920-922-145
ttorn(;2 ;'rd naiconstr+uctiorico com
wxw crrrcitr alr_riSirut;:ttionc::)Co m
From: '1GM Architecture[rrtailto;hcr^tarch@exec oC.CCrn]
Seat; Tuesday, November 15, 2011 2'32 PM
To: Tin Rieder
Subject: RE: Menominee Park
Toni
Per draw.:ng$the c ty is to make tar. f there is a charge it shying tae bided to Parks Dept,
Thank.you„
Ron i-t;t,ui:;L',:•
IiC;:v1 Architucturc, Ink.
i05 !`.;orti') Man Street
t'.t r 13;1;, 97b
011KOsh, `V I 54)):
0 P h: (')2'.))231-`050
1:::.1x: 92+0)2)1-4516
1/3/2012
,TF-471 I c ilL 0?-':44 Fr cirri:^1F-ENCI G"R S' FL_9f 1B7t1ia 920 9Ji :cSG-: To:9202'1 1_ F.2'-.Z.
-, MAKE CHECKS PAYABLE TO.
-
AD) CITY OF OSHKOS!°! INVOICE 11 O:
215 C11uFFCH AVENUE ;Iff i �I!�I 2uI21f0�4
( PO BOX 1128 3-1 128 1: 1111 IWil U,111111h
t—J *rims H OSHKOSH,W I 54903-
0,,MC WA?W (9211)236-5019 1111I11[1111!
Arnotlnt
TO; AHSRN-GROSS PLUMBING INC of Rcmi:SO:tCe' $518..56
218 S MAIN ST
P 0 BOX 1027
FOND DU LAC WI 54936
Invoice Batt 1 Department Due Dute
i
DEC 30 2011 IW),.TER UTILITY JAN 29 2012
.......�
1,^�r
PLEASE ENCLOSE TOP PORTION AND REFERENCE INVOICE NO ON YOUR CHECK AMOUNT
2 '' CUT-.IN AT 583 PRATT TRI. ON NOVEMBER 15, 2011
1-2" X 5" TAPPING SADDLE $45.S0
1-2" COPPER CORP STOP 5136 , 50
..-2" COPPER CUR.? STOP $115 70
1-5TOP BOX FR ROD $59.76
"1-STOP BOX BASE $13.20
LABCE & TAPPING MACHINE $10 3.C;0
0 VEHICLE USE $43.00
2" CUT IN 518.65
JCB ORDER it 103976
TAX PARCEL 11-1035-0000
FEDERAL TAX ID#39-6105563 INVOICE NO PLEASE REMIT 40.
41,1111 CITY OF OSIIICOSFI 22104 THIS AMOUNT S518.66
215 CHL117C1 AVENU4:
Z PO BON:D I28
u.4ww.ru` OSHKOSH,WI 54903-1:18
PROPERTY CHANCES THAT Alai:DEELINQ1.ENT AS OF OCTOBER:I;sT WILL 131~I'1,ACEI)ON THE PRoI'I K'I'1'°W NW'S'I.1'ti n11.9.0
Tli I',tr'a 'til' 11'►!RCI' 1°,S.erg.%l !..-Ill ■I V 1.I)UI' .' t I' ST It i'11 I \'4■ '4
Ti-v-11-20,2 0':44 Fr�,. .�l r-,EFJ GFC _ F __iGI o 3E-'0 P1 235 Tcr520271 G_" P. 1/3
`�,,► Ahern Gross
PLUMBING CONTRACTORS
Offering 24 Hour Emergency Service
218 South Main - P.O. Box 1027
Fond du Lac, WI 54936-1027
Phone (920) 9214414
Fax (920) 921-2050
'January ", 2012
C.
�a;(till:;l. CUI'lSt;llCtlq)l Co., Inc.
P.O. BBo`. 554
I-oncl du .ac. Wi 54936-0564
Attn: Mr. Torn Rieder
Re. Plumbing Change Order for
Menominee Park Restruom i Shelter t3uilding
Oshkosh, WI
Gentlemen:
r�� Fe1 the dire
ctive. of Architect and the owner,we are forwarding, the following
‘
PiumbIng Change Order Request for consideration as follows:
COR '!" , 1 A0I)—`VATER 1'IE1IN TAPPING ['.EE AND BLOW DOWN I'IPiNG
City of Oshkosh tcppine'fee material and labor(sae attached) and per the e-moil from the
Architect, dated Novorber i5 and 16. Winterization piping to bow out the incoming
water main as dirc;ctcd by Mr, Chad Dalln7an, Parks Operation Maliauer.
ADD: ONE THOUSAND SIX HUNDRED FIFTEEN DOLLARS... ...........SI,6I5.0C
I,k,ase process the above Plumbing Change Order Request for approval. Thank you.
sincerely.,
r ERN — Ow NC.
PATRICK R. lit lT RA\i
Vice; President
Cornmercia) / 'th.lustrill
Eucl: City or Oshkosh I ri..o!ce 422104
0