Loading...
HomeMy WebLinkAbout20. 12-131 MARCH 27, 2012 12-131 RESOLUTION (CARRIED___6-0___LOST_______LAID OVER_______WITHDRAWN_______) PURPOSE: ACCEPT AND APPROVE WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING IN CONNECTION WITH IMPROVEMENTS / SECOND ADDITION TO CASEY’S MEADOW SOUTH INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED BY the Common Council of the City of Oshkosh that the Waiver of Special Assessment Notices and Hearing under Section 66.0703(7)(b) of the Wisconsin Statutes, for public improvements and services, for the premises described below and in the attached Waiver is accepted and approved. SECOND ADDITION TO CASEY’S MEADOW SOUTH Lots 33 through 56 WAIVER OF SPECIAL ASSESSMENT NOTICES AND HEARING UNDER SECTION 66.0703, WISCONSIN STATUTES The undersigned, owner of property benefited by the following improvements to be made by the City of Oshkosh, Winnebago County, State of Wisconsin,to wit: For public construction, surveying and inspection of concrete sidewalk. For private construction and public inspection and survey for sanitary sewer, storm sewer, water main, laterals, grading& graveling, and concrete street pavement. In consideration of the construction of said improvements by the City of Oshkosh, Wisconsin, I hereby admit that such public improvement will benefit said property and consent to the levying of special assessments against the premises under Section 66.0703 of the Wisconsin Statutes for the cost of such improvements. In accordance with Section 66.0703 of the Wisconsin Statutes, I hereby waive all special assessment notices and hearings required by Section 66.0703 of the Wisconsin Statutes; and I further agree and admit that the benefit of my property from the construction of such improvements is in proportion to the footage thereof: Description of Premises Second Addition to Casey's Meadow South Lots 33 - 56 Construction of Mockingbird Way and Casey Trail 1. Sanitary Sewer&Laterals (Private Construction) Estimated Construction Cost $52,174.50 Private 6% Survey and Inspection $3,130.47 Invoice 2. Water Main with Laterals(Private Construction) Estimated Construction Cost $106,147.00 Private 6% Survey and Inspection $6,368.82 Invoice 3. Storm Sewer w/Laterals(Private Construction) Estimated Construction Cost $82,658.00 Private 6% Survey and Inspection $4,959.48 Invoice 4. Grading, Graveling and Restoration(Private Construction) Estimated Construction Cost $48,500.00 Private 6% Survey and Inspection $2,910.00 Invoice I:1Engineering\Waiver of Special Assessment\Waiver of Special Assess-by SubdivisionlSecond Addition to Casey's Meadow South.doc Casey's Meadow—Phase 1B Page 2 of 3 5. Sidewalk (Public Construction)Assess Assessment Rate=$23.00 per front foot of each lot Includes 6% for Inspection and Surveying Second Addition to Casey's Meadow South Lot# Sidewalk Footage Sidewalk Cost Estimate 33 199.27 $4,583.21 34 70.00 $1,610.00 35 80.15 $1,843.45 36 85.99 $1,977.77 37 61.00 $1,403.00 38 75.14 $1,728.22 39 61.02 $1,403.46 40 61.00 $1,403.00 41 198.27 $4,560.21 42 62.00 $1,426.00 43 61.00 $1,403.00 44 61.00 $1,403.00 45 61.00 $1,403.00 46 61.00 $1,403.00 47 75.02 $1,725.46 48 75.79 $1,743.17 49 77.26 $1,776.98 50 76.79 $1,766.17 51 80.38 $1,848.74 52 80.31 $1,847.13 53 81.77 $1,880.71 54 81.71 $1,879.33 55 76.43 $1,757.89 56 80.00 $1,840.00 6. Concrete Street Paving(Private)—Paving in 2015, complete by July 15. Center Line Feet of Roadway= 1,0301f Cost per Center Line Foot= $200/1f Include four(4)Handicapped Ramps at $600.00 each= $2,400.00 Estimated Construction Cost $208,400.00 Private 6% Survey and Inspection $12,504.00 Invoice 7. Street Lighting(Private) Estimated Construction Cost $21,781.32 Private 6% Survey, Inspection, Installation $1,306.88 Invoice 1:1Engineering\Waiver of Special Assessment\Waiver of Special Assess-by Subdivision1Second Addition to Casey's Meadow South.doc representative of the contractor or Developer and/or sent by mail to the Developer or contractor. If construction work continues without filing of an appropriate bond, the City shall be entitled to seek an injunction to prevent further work on the project until such time as an appropriate bond is filed and to seek such other and further relief as may be deemed appropriate. In addition to any equitable relief, the City may seek monetary damages and upon judgment shall be entitled to its costs and fees in pursuit of any action under the terms of this paragraph. 11. In addition to the remedies for default provided to the City by the financial guarantees contained within this Agreement, the City shall have the right without notice or hearing to Developer, or any successor in title, to impose special assessments for any amount to which the City is entitled by virtue of this Agreement upon each and every lot within the subdivision. Such assessments shall be imposed on the individual parcels in accordance with such parcel's share of the amount to which the City is entitled in accordance with this Agreement and which amount has not been paid by the Developer of such parcel or its successors or assigns. With respect to defaulting Developer, this provision constitutes Developer's consent to the installation by the City or designee of all public improvements and remediations required by this Agreement and constitutes Developer's, and any successors in title, waiver and consent to all special assessment proceedings as described in Section 66.0703, of the Wisconsin Statutes. This covenant is intended to run with the land and to survive any subsequent divestiture of title by Developer to, and shall be binding on, any successor in title. The remedies provided in this Agreement are not exclusive. The City may use any other remedies available to it. 12. Developer agrees to pay any costs associated with the maintenance or replacement of water stop boxes damaged during the development of this subdivision. It shall not be necessary for the City to determine or establish by whom the damage was done. Developer also agrees to pay any costs associated with maintenance to the gravel street base which may be necessary during the period prior to pavement construction. Developer shall pay the actual costs incurred by the City within 30 days upon invoice from the City. 13. This Agreement and its attachments, may be recorded at City's option, and if so done, this document shall serve as Notice of Lien against such properties. IN WITNESS WHEREOF, the parties heretofore have caused this Agreement to be signed by the proper persons of each party and their corporate seals, if any, to be hereunto affixed. Dated: March 2C, 2012. In the Presence of: Casey's Meadow, LLC IT By: Chet esenberg By: Timoth Rusch Owner/member Owner/member Casey's Meadow LLC Casey's Meadow LLC