Loading...
HomeMy WebLinkAbout0107466-Building (remodel & garage addition) ~ OSHKOSH ON THE WATER Job Address 1154 N WESTFIELD ST CITY OF OSHKOSH No 107466 BUILDING PERMIT - APPLICATION AND RECORD Owner EVERGREEN MANOR INC Create Date 04/16/2004 Designer Contractor DAN V BINDER CONSTRUCTION Category 111 - Single Family Addition Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Penmit Required Flood Plain - # Dwelling Units 0 Height Permit Park Dedication # Structures ~ Use/Nature SFR/14x24 attached garage addition, remodel kitchen, remove wall between living room and sun room, install new siding, reroof entire of Work building, other mise remodeling. HVAC Contractor MARX MECHANICAL BEEZ ELECTRIC iNC Plumbing Contractor J RASMUSSEN PLUMBING INC Electric Contractor Fees: valua}JX) Issued By: $45,000.00 Plan Approval $0.00 Permit Fee Paid $199.00 Park Dedication $0.00 Date 04/16/2004 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1608640000 In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1224 W SOUTH PARK AVE AgenVOwner OSHKOSH WI 54902 - 0000 Telephone Number 231-2114 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of' Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.