HomeMy WebLinkAbout0107466-Building (remodel & garage addition)
~
OSHKOSH
ON THE WATER
Job Address 1154 N WESTFIELD ST
CITY OF OSHKOSH
No
107466
BUILDING PERMIT - APPLICATION AND RECORD
Owner EVERGREEN MANOR INC
Create Date
04/16/2004
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
111 - Single Family Addition
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Penmit Required
Flood Plain -
# Dwelling Units 0
Height Permit
Park Dedication
# Structures
~
Use/Nature SFR/14x24 attached garage addition, remodel kitchen, remove wall between living room and sun room, install new siding, reroof entire
of Work building, other mise remodeling.
HVAC Contractor
MARX MECHANICAL
BEEZ ELECTRIC iNC
Plumbing Contractor
J RASMUSSEN PLUMBING INC
Electric Contractor
Fees: valua}JX)
Issued By:
$45,000.00 Plan Approval
$0.00 Permit Fee Paid
$199.00 Park Dedication
$0.00
Date 04/16/2004
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1608640000
In the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1224 W SOUTH PARK AVE
AgenVOwner
OSHKOSH
WI 54902 - 0000
Telephone Number
231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of'
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.