HomeMy WebLinkAbout08. 12-103 MARCH 13, 2012 12-103 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR CHILLER PUMP REPLACEMENT FOR CITY HALL TO REEKE-MAROLD INC. ($43,200.00) INITIATED BY: PURCHASING WHEREAS, the City of Oshkosh has heretofore advertised for bids for a Chiller Pump for City Hall; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: REEKE-MAROLD, INC. 1337 S. Broadway Green Bay, WI 54304 Total Bid: $43,200.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 203-1099-7204-00000 Property EECBG Project Fund – Machinery & Equipment 323-0130-7204-06237 Equipment Improvement Fund – Roofing/ HVAC Improvements CITY HALL 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 310 54903-1130 City of Oshkosh OfHKQIH TO: Honorable Mayor and Members of the Common Council FROM: Jon Urben,General Services Director DATE: March 5,2012 RE: Chiller Pump Replacements-City Hall BACKGROUND In 2009 the City of Oshkosh received a $634,100 Energy Efficiency and Conservation Block Grant (EECBG) from the Department of Energy. By late 2011 a substantial amount of these grant funds were invested in various municipal buildings in a wide range of energy efficiency and conservation improvements including lighting retrofits, building envelope projects, plumbing improvements and more. From implementing the EECBG lighting retrofit projects we received an estimated $55K in additional Wisconsin Focus on Energy (WFOE) incentive funds. In accordance with EECBG guidelines, any such incentive funds received as part of EECBG grant dollars must be reapplied to additional energy efficiency/conservation projects and allocated by March 19, 2012. The council approved one project (LED lighting improvements at the Convention Center) at their February 14, 2012 council meeting. This memo is to recommend the final energy efficiency improvement project that will utilize the remaining EECBG funds. ANALYSIS The chiller pumps provide cold water circulation for the chiller/cooling system for City Hall. The two current pumps and piping are 40+ years old and were identified in our 2011 McKinstry HVAC audit as a top priority for replacement due to their age and condition. By replacing the old pumps with more energy efficient pumps with VFD's (variable frequency drives) we can anticipate approximately 33%in annual utility savings ($1,500-$2,000 per year). Implementation of this project will also generate an additional estimated $1,200 in WFOE incentives. Purchasing and Facilities Maintenance staff worked with our HVAC mechanical engineer and WFOE to prepared specifications to replace this system. Bids were advertised in the local paper and posted online on NovusVendor. Bids were received on March 2, 2012. The bid tab is attached. Purchasing reviewed the bids and concluded the low bid of$43,200 from Reeke-Marold Inc. met the minimum bid specifications. FISCAL IMPACT After the completion of the Convention Center LED lighting improvement project(and factoring in the anticipated additional WFOE incentives of$4,300 from this project), an estimated $14,000 remains from the EECBG funding. This chiller pump replacement bid would have a fiscal impact of$43,200, which will be funded through this EECBG grant and charged to account 203-1099- 7204-00000. The approximate overage of $27,000 (when factoring in an anticipated $1,200 WFOE incentive) would then be charged to the 2012 HVAC/Roofing CIP account 323-0130- 7204-06237. RECOMMENDATION Purchasing recommends the Common Council award this chiller pump replacement bid to Reeke- Marold Inc. for$43,200. Respectfully Submitted, Approved: Jon Urben,General Services Director Mark A. Rohloff, City Manager BID TABULATION CHILLER PUMP REPLACEMENT-OSHKOSH CITY HALL BIDS OPENED MARCH 2, 2012 NAMES OF BIDDERS BID ADDENDUM BID BOND 1 Reeke -Marold Inc 1337 S Broadway $43,200.00 YES YES Green Bay WI 54304 Gartman Mechanical Services PO Box 2264 $56,820.00 YES YES Oshkosh WI 54903