Loading...
HomeMy WebLinkAbout15. 12-75FEBRUARY 28, 2012 12 -75 RESOLUTION (CARRIED 6 -0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR CONTRACT NO. 11 -27 WITH LALONDE CONTRACTORS, INC. FOR OTTER AVENUE PARKING LOT RECONSTRUCTION ( +$14,165.56) INITIATED BY: TRANSPORTATION DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: LALONDE CONTRACTORS, INC. P.O. BOX 070420 MILWAUKEE, WI 53207 Net Increase to Contract: $14,165.56 BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 323-1717-6401-06135 — Otter Avenue Parking Lot Reconstruction TO: Honorable Mayor and Members of the Common Council FROM: Christopher Strong, P.E., Director of Transportation DATE: February 22, 2012 RE: Change Order 41 for Contract No. 11 -27 with LaLonde Contractors, Inc. for Otter Avenue Parking Lot Reconstruction (+$14,165.56) BACKGROUND Last August, the Common Council awarded the bid for reconstruction of the Otter Avenue Parking Lot to LaLonde Contractors, Inc. The attached change order is requested by the contractor, based on changes in bid quantities and additional work that was conducted at the City's request during the project. ANALYSIS Approximately 53 percent of the change order request is due to quantities that were higher than were estimated in the bid documents. This includes a sidewalk on the western edge of the lot that was incorporated into the lot's design after it went out to bid. The remainder of the change order request included addressing items that were discovered during the construction project, including removal of a previously undocumented fuel tank, additional soil excavation, removal and disposal of a building footing, and closing a coal chute. The final pay request is $14,165.56 over the bid amount of $117,087.65. I+ISCAL IA PACT Funding for the project is in the 2011 Capital Improvement Program Property Improvements Section. The budgeted cost of the reconstruction of the lot was $266,000. While an additional contract will need to be issued for installing landscaping later this year, the project is expected to stay well within budget. RECOMMENDATION I recommend approval of this change order. Respectfully Submitted, /111-istopher Strong, P.E. Director of Transportation Approved: Mark A. Rohloff City Manager OTTER AVENUE PARKING LOT RECONSTRUCTION CITY OF OSHKOSH WINNEBAGO COUNTY CITY CONTRACT 11 -27 ADDITIONAL WORK REQUIRED ni45 Conrad Installed Increase fn Decrease In Item Descri tion U Quanti Quantifies Not Increase NetDetrease Uri,Prica ConUaclPrice CanUaclPr Tank Removal - AddEtional €abor. Units Contract Installed Increase In Decrease in Item Descd 'on quantity Quanfles Net Increase Net Decrease Unit Price Contractmo Contract Price I Traffic Control LS 1 1 5 6.000.00 2 Removing Concrete Sidawafks and SY 0 1 1,00 5 1,410.00 5 1,410-00 Drivewa q00 357 43.00 $ 3.00 S 129.00 3 Removing Corrcreta Pavement Sy 35 149 114.00 $ 7.00 S 798.00 4 Removing Curb and Gutter LF 460 $95 65.00 $ 3,00 $ 195-00 5 Removing Concrete Bases EA i 1 S 300.00 6 Removin As aftic Surface Sy 1,6 00 1588 188.00 12.00 S 2.10 $ 2,474.60 ; 25.20 7 Remo ' Inlets FA 1 0 1.00 $ 150.00 S 150.00 8 Abandon Storm Sewer LS 1 01 jl.uy ; 500.00 5 500.00 9 [Clearing and Grubbino EA 4 41 is 140.00 10 Sawi As halt LF 10 43 33.00 $ 1.00 $ 33.00 11 Sawing Concrete LF 250 125 1.00 125.00 $ 2.00 S 250.00 12 SteGrad LS 1 1 S 800"o 13 Base Aggregate Dense 314 -Inch TON 75 149.24 44.24 S 11.00 $ 486.84 14 Base A r ate Dense 1114.1nch TON 840 1215.06 275.06 5 10.80 S 2970.65 15 Concrete Pavement Sy 25 38 13.00 S 58.00 $ 754.00 16 HMAPavemeni,T E-0.3 TON 275 322.07 47.07 S 8350 $ 3930.35 17 Concinn Curb & Gutter, 12 -Inch curb LF 1.00 $ 500.00 S 500.00 Hea DAY 115 111 4.00 $ 21.39 1S Conc Curb & Gutter, 18 -inch I F 570 551 19,00 $ 15.02 $ 285.19 Conc Curb & Ginter, 30 -Inch LF 120 122 2.00 $ 23.46 $ 46.92 20 Con Curd & Gutter, 30-inth integral LF 45 49.5 4.50 $ 23-46 S 105.57 21 Con Sidewalk4 -inch SF 1,050 1847 797.00 $ 4.00 S 3,198.00 22 Con Sidewalk and D6vewa $ -inch SF 1,200 995 205.00 $ 5.00 ; 1,02500 23 Co= $ta SF 10 0 10.00 s 30.00 S 300.00 24 Curb p Detectable Warning Field, SF Natuatina 24 40 18.00 $ 34.00 $ 544.00 25 Erasontrol LS 4 1 $ 600.00 26 8 -Inc soil and Sod SY 55 88 33.00 $ 12.00 $ 396.00 27 6-inc sol and Hardwood Mulch SY 220 100 120.00 $ 12.00 S 1,440.00 28 Bio-NorthLosation LS 1 1 $ 8.200,00 29 Bio- Soudsiatation LS 1 4 $ 5,750.00 S 860.170 30 Storm Sower la a PVC 8•InUt 1 90 68 22,00 $ 30.00 31 Storm Sewer Pipe PVC 12 -)nth LF 75 73 2.00 $ 43.00 $ 186.00 32 Storm Sewer Pipe Reinforced Cosraele LF Class III 15-Inch 70 69 1.00 5 45.00 S 45.40 33 Storm Sewer Mantwle, 60 -Inch Diameter EA 1 1 S 1,900.710 34 Catch Basin 30 -Inch Diameter FA 2 2 S 1,800A0 35 Ad stlnlelCovers FA 1 1 S 400 -00 36 Pavement5tri ' LS 1 1 $ 250.00 37 Install City Su Fed Bike Rack I LS 1 1 5 210.00 TOTAL PROJECT ; 13,253.42 $ (5,176.14) ADDITIONAL WORK REQUIRED ni45 Conrad Installed Increase fn Decrease In Item Descri tion U Quanti Quantifies Not Increase NetDetrease Uri,Prica ConUaclPrice CanUaclPr Additiona€ work Sub -Total $ 6,688.58 $ (500.00) NET INCREASE TOTAL AMOUNT S 19.841.70 NET DECREASE TOTAL AMOUNT $ (5,876.14) NET CHANGE TO CONTRACT $ 14,165.66 1 of 1 2117/2012 Tank Removal - AddEtional €abor. materials, and equipment to remove fuel CO 041 tank fiscovered during excavation, eom lele ass ci8ed LS 0 1 1,00 5 1,410.00 5 1,410-00 Excavation 13 Slow buo9fade - Additional labor, materials, and equipment to CO 002 excavate and haul substandard subgrade materiats off -site as directed by engineer, complete asspecified CY 0 166 188.00 $ 13.10 $ 2,474.60 Remove & Dispose of Footings - Additional labor, materials, and equipment CO 005 to sawa,t and dispose of existing footing in conflict with proposed sidawafk, 2,432.00 $ 2,432.00 complete as SIP edfied LS 0 1 1.00 $ Coal Chute - Add<tional labor, materials, CO 006 and equipment to dismantle and fit coal chute and window wells as (Erected by $ 571.98 $ 571.98 long-[Weer, com lete ass ecitted LS 1 01 It 1.00 Ltgr3daledOamages- Contr penalty Lt) far failure to meet agreed upon 1.00 $ 500.00 S 500.00 completion date. DAY 0 1 Additiona€ work Sub -Total $ 6,688.58 $ (500.00) NET INCREASE TOTAL AMOUNT S 19.841.70 NET DECREASE TOTAL AMOUNT $ (5,876.14) NET CHANGE TO CONTRACT $ 14,165.66 1 of 1 2117/2012