Loading...
HomeMy WebLinkAbout0125475-Building (concession stand) ~,e OSHKOSH ON THE WATER Job Address 1100 W SMITH AVE CITY OF OSHKOSH No 125475 BUILDING PERMIT - APPLICATION AND RECORD Owner OSH AREA SCHL DIST NORTH HIGH Create Date 06/22/2007 Contractor PRICKETT'S REMODELING Designer Plan Category 229 - Alteration Schools & other Educational Type . Building o Sign o Canopy o Fence o Raze Class of Const: Size Zoning Finished/Living Sq.Ft. Sq. Ft. Rooms Height Ft. o Projection I Unfinished/Basement Bedrooms Stories Canopies Signs Garage Sq.Ft. Baths Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication o # Structures o Use/Nature High School/ Alterations to Concession Stand: Increase room size by 1.5'-2' to the North, install door at east end of this room, new of Work counters. # Dwelling Units / Plumbing Contractor HV AC Contractor Electric Contractor $5,000.00 Plan Approval $0.00 Permit Fee Paid $53.00 Park Dedication $0.00 Fe..' valua~ Issued By: Date 06/22/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1219400000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any ne ssary approvals before starting such activity. Signature Date 6 / /~IIJ -? , I Address Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 233-1954 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.