HomeMy WebLinkAbout0127102-Building (privacy wall)
.
OSHKOSH
ON THE WATER
Job Address 1100 W SMITH AVE
<r"_
CITY OF OSHKOSH
No
127102
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSH AREA SCHL DIST NORTH HIGH
Create Date 10/04/2007
Designer
AEC-
Contractor OSHKOSH AREA SCHOOL DISTRICT
Category
229 - Alteration Schools & other Educational
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Finished/Living
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Unfinished/Basement
Bedrooms
Stories
Canopies
Garage
Sq. Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Park Dedication
o
# Structures
o
Not Required
# Dwelling Units
UsefNature School 1 Construct privacy wall in girls varsity locker room as per plans. Wall does not extend to the ceiling level
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$8,500.00 Plan Approval
$0.00 Permit Fee Paid
$81.00 Park Dedication
$0.00
Issued By:
Date 10104/2007
FinalfO.P. 00/00/0000
o Permit Voided I
Parcelld # 1219400000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
AgentfOwner
Address PO BOX 3048
OSHKOSH
WI 54903 - 3048 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.