HomeMy WebLinkAbout0127588-Building (water service closet)
.~
OSHKOSH
ON THE WATER
Job Address 1100 W SMITH AVE
CITY OF OSHKOSH No 127588
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSH AREA SCHL DIST NORTH HIGH Create Date 10/31/2007
Designer
Contractor FLUOR BROS CONSTRUCTION CO
Category
229 - Alteration Schools & other Educational Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq. Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . -Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Occupancy Fee
$0.00 Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature School/ Construction of new closet for new water service adjacent to Smith street entrance.
of Work
.
HV AC Contractor
Plumbing Contractor
Electric Contractor
3,200.00 Plan Approval
$0.00 Permit Fee Paid
$46.00 Park Dedication
$0.00
Issued By:
Date 10/31/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1219400000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
PO BOX 3048
Agent/Owner
OSHKOSH
WI 54903 - 3048
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.