Loading...
HomeMy WebLinkAbout0115202-Building (foundation only) e OSHKOSH ON THE WATER Job Address 1100 W SMITH AVE CITY OF OSHKOSH No 115202 BUILDING PERMIT - APPLICATION AND RECORD Owner OSH AREA SCHL DIST NORTH HIGH Create Date 07/14/2005 Designer Contractor OWNER Category 240 - Other Non-Residential Plan Type 18 Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories 2 Baths 0 Size 48x48 Irreg Zoning Unfinished/Basement 0 Sq.Ft. ~ Sq. Ft. U Projection 1 Finished/Living Canopies 0 Garage ~ Sq. Ft. Signs 0 Foundation 8 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 North High School/Foundation Only for Storage/Concession/Restroom Building at NE end of Football / Track Field. 1728 sf - first floor, 1152 second floor. * Contractor is Oshkosh North Booster Club (Dan Wara - Contact) Use/Nature of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $10,000.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: Date 07/14/2005 Final/O.P. 00/00/0000 U Permit Voided 1 Parcelld # 1219400000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address Agent/Owner Oshkosh WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.