Loading...
HomeMy WebLinkAbout0103918-Building (garage)OSHKOSH OH THE WATER Jeb Addrees 615 617 W SMITH AVE Designer Category Type Zoning CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 103918 Owner RYAN L/JACKIE A NEABLING Create Date 09/04/2003 Plan (~) Raze Contractor OWNER 150 - New Accessory Buildings-Garages (Residential) · Building O Sign O Canopy (~ Fence Size 20x24 Unfinished/Basement Finished/Living Garage Foundation Occupancy Permit Park Dedication Class of Const: 8 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection J 0 Sq. Ft. Bedrooms 0 Stories 1 Canopies __ 480 Sq. Ft. Baths 0 Signs O Poured Concrete · Floating Slab (~ Pier (~) Other O Concrete Block (~ Post (~ Treated Wood Required Flood Plain Height Permit # Dwelling Units 0 # Structures 1 Use/Nature 3upIex/erect a 20x 24 detached garage. Also expand driveway to access garage and add a 12xl 7 concrete patio off of rear of house of Work ~nd garage. HVAC Contractor Electric Contractor Fees: Valuation ~ Issued By: $8,800.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $60.00 Park Dedication $0.00 Date 09/04/2003 Final/O.P. 00/00/0000 [] Permit Voided in the ped=ormance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. ~ - ' · ~'~ Agent/Owner Address 6t7 W SMITH AVE OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.