HomeMy WebLinkAbout0103918-Building (garage)OSHKOSH
OH THE WATER
Jeb Addrees 615 617 W SMITH AVE
Designer
Category
Type
Zoning
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No 103918
Owner RYAN L/JACKIE A NEABLING Create Date 09/04/2003
Plan
(~) Raze
Contractor OWNER
150 - New Accessory Buildings-Garages (Residential)
· Building O Sign O Canopy (~ Fence
Size 20x24
Unfinished/Basement
Finished/Living
Garage
Foundation
Occupancy Permit
Park Dedication
Class of Const: 8
0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection J
0 Sq. Ft. Bedrooms 0 Stories 1 Canopies __
480 Sq. Ft. Baths 0 Signs
O Poured Concrete · Floating Slab (~ Pier (~) Other
O Concrete Block (~ Post (~ Treated Wood
Required Flood Plain Height Permit
# Dwelling Units 0 # Structures 1
Use/Nature 3upIex/erect a 20x 24 detached garage. Also expand driveway to access garage and add a 12xl 7 concrete patio off of rear of house
of Work ~nd garage.
HVAC Contractor
Electric Contractor
Fees: Valuation ~
Issued By:
$8,800.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $60.00 Park Dedication $0.00
Date 09/04/2003 Final/O.P. 00/00/0000
[] Permit Voided
in the ped=ormance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
~ - ' · ~'~ Agent/Owner
Address 6t7 W SMITH AVE OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.