HomeMy WebLinkAboutPW CNT 11-23/CNG OR 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 �� -KOlH Fax(920)236-5068 ON THE WATER February 16, 2012 Mr. Sean McNamara Kruczek Construction, Inc. 3636 Kewaunee Road Green Bay,WI 54311 Re: Change Order No. 1 (Final) Contract 11-23 Dear Mr. McNamara: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Kruczek Construction, Inc. regarding the abovementioned project. If you have any questions, please call our office at(920)236-5065. Sincerely, DecP— David C. Patek Director of Public Works DCP/tlt Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk(w/original) Lynn Lorenson, City Attorney (w/copy) File (w/original) 1:\Engineering\1 1-23 San Swr Relay-Hazel St\Project_lnformation\Contract Info\CONTRACT BOOK\11-23 Executed Page 1 of 1 Change Order Letter_2-16-12.doc CHANGE ORDER # 1 (Final) DATED: January 18, 2012 TO: Kruczek Construction Inc. 3636 Kewaunee Rd Green Bay WI 54311 Your present contract with the City of Oshkosh, Contract No. 11-23 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING $4,360.37 NET INCREASE TO: SECTION II -STORM SEWER $10,515.25 NET DECREASE TO: SECTION III - SANITARY SEWER ($11,218.70) NET INCREASE TO: SECTION IV-WATER MAIN $1,379.50 NET INCREASE TO CONTRACT: $5,036.42 CITY OF OSHKOSH BY: lip Recommended: City Man.:= Ais 'L9'r Director of Public Works City Clerk Ap• oved and accepted: 41110. /4, Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. p j, geY� enptroller Appr. ed as to form: , )City Atto?' CONTRACT:11-23 CHANGE ORDER#1(FINAL) SECTION I-CONCRETE PAVING ' INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT B/D INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 100 Sidewalk and driveway removal, Square complete as specified Feet 2,100 2,275.81 175.81 $1.00 $175.81 101 8"concrete pavement including integral curb,6"base material, grading,pavement removal, sawing,and landscaping,complete Square as specified Yards 1,150 1,233.09 83.09 $56.50 $4,694.59 102 12"wide radius curb head, Linear complete as specified Feet 18 51.08 33.08 $10.00 $330.80 103 4"concrete sidewalk,complete as Square specified Feet 510 533.47 23.47 $3.25 $76.28 104 6"concrete sidewalk and driveway, Square complete as specified Feet 1,590 1,738.54 148.54 $3.70 $549.60 105 Excavation,complete as specified Cubic Yards 240 203.10 -36.90 $19.00 ($701.10) 106 Sawing,complete as specified Linear Feet 175 187.50 12.50 $3.00 $37.50 107 HMA Pavement Type E-1, complete as specified Tons 90 97.77 7.77 $100.00 $777.00 108 Tack Coat,complete as specified Gallons 12 12.00 $1.00 109 1'gravel shoulder,complete as Linear specified Feet 485 444.50 -40.50 $3.50 ($141.75) 110 Crushed aggregate base course, complete as specified Tons 280 175.42 -104.58 $11.65 ($1,218.36) 111 Prepare foundation for asphaltic Lump paving,complete as specified sum 1 1.00 $3,133.56 112 24"curb and gutter removal& replacement,complete as Linear specified Feet 41 51.00 10.00 $35.00 $350.00 113 Furnish and install No.4 reinforcing bars(epoxy-coated),complete as Linear specified Feet 360 270.00 -90.00 $1.00 ($90.00) 114 Adjust manholes and inlets, complete as specified Each 10 10.00 $300.00 115 Furnish and install metal detectable warning fields,complete Square as specified Feet 32 16.00 -16.00 $30.00 ($480.00) 116 Terrace work for the Alley, Lump complete as specified Sum 1 1.00 $3,000.00 SECTION I-(BID ITEMS 100-116)-SUB-TOTALS $6,991.58 ($2,631.21) ADDITIONAL WORK REQUIRED: C.O.#1-SECTION I 1 INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 117 Concrete paving remobilization Days due to storm sewer delay 0.00 4.50 4.50 $0.00 $0.00 ADDITIONAL WORK: C.O.#1-(ITEM 117)-SUB-TOTAL $0.00 $0.00 NET INCREASE TO: SECTION I $4,360.37 Page 1 of 4 CONTRACT:11-23 CHANGE ORDER#1(FINAL) SECTION II-STORM SEWER INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2036 Furnish and install 12"storm Linear sewer,complete as specified Feet 50 0.00 -50.00 $80.00 ($4,000.00) 2614 Furnish and install Type 3 inlet (with 18"sump),complete as specified Each 3 0.00 -3.00 $1,575.00 ($4,725.00) 2856 Furnish,install,maintain,and remove Type D inlet protection, complete as specified Each 25 24.00 -1.00 $80.00 ($80.00) SECTION II-(BID ITEMS 2036,2614,2856)-SUB-TOTALS $0.00 ($8,805.00) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION II INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2857 Storm sewer repair at Baldwin Ave. Lump 0.00 1.00 1.00 $19,320.25 $19,320.25 2859 Storm sewer repair delay , Days 0.00 7.00 7.00 $0.00 $0.00 ADDITIONAL WORK:C.O.#1-(ITEMS 2857&2859)-SUB-TOTAL $19,320.25 $0.00 NET INCREASE TO: SECTION II $10,515.25 Page 2 of 4 CONTRACT:11-23 CHANGE ORDER#1(FINAL) SECTION III-SANITARY SEWER DESCRIPTION UNIT BID INSTALLED NET NE7 UNIT INCREASE TRACT DECREASE C CONTRACT ITEM I QUANTITY QUANTITIES INCREASE DECREASE PRICE NUMBER I 3000 Furnish and install 8"sanitary Linear sewer relay,complete as specified Feet 1,315 1,270.20 -44.80 $60.00 ($2,688.00) 3008 Furnish and install 18"sanitary Linear sewer relay,complete as specified Feet 20 1.90 -18.10 $130.00 ($2,353.00) 3100 Furnish and install standard sanitary manhole(4'diameter), Vertical complete as specified Feet 50 49.61 -0.39 $210.00 ($81.90) 3114 Furnish and install external manhole chimney seal,complete $450.00 as specified Each 7 7.00 3210 Furnish and install 8"x 6"factory wyes or tees,complete as specified Each 15 12.00 -3.00 $115.00 ($345.00) 3234 Furnish and install 4"16"sanitary Linear lateral relay,complete as specified Feet 252 189.70 -62.30 $70.00 ($4,361.00) 3236 Furnish and install sanitary lateral marker balls,complete as specified Each 30 23.00 -7.00 $35.00 ($245.00) 3238 Furnish and install clay dams, complete as specified Each 15 10.00 -5.00 $50.00 ($250.00) 3300 Furnish and install connections to existing 8"mains,complete as $350.00 specified . Each 1 1.00 3308 Furnish and install connections to existing 18"mains,complete as $750.00 specified Each 1 1.00 3330 Furnish and install concrete collars, complete as specified Each 2 0.00 -2.00 $400.00 ($800.00) 3332 Core into existing manhole, $535.00 complete as specified Each 1 1.00 3334 Core into existing HOBAS $700.00 manhole,complete as specified Each 1 1.00 3700 Televise sanitary sewer,complete Linear as specified Feet 1,335 1,270.20 -64.80 $1.00 ($64.80) 3800 Abandon sanitary manholes, complete as specified Each 4 3.00 -1.00 $700.00 ($700.00) 3815 Abandon 27"sanitary sewer, Linear complete as specified Feet 470 400.00 -70.00 $7.00 ($490.00) 3817 Abandon 32"sanitary sewer, Linear complete as specified Feet 470 460.00 -10.00 $10.00 ($100.00) SECTION III-(BID ITEMS 3000-3817)-SUB-TOTALS $0.00 ($12,478.70) ADDITIONAL WORK REQUIRED: C.O.#1-SECTION III . INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3116 Furnish and install External Chimney Seal Extension Each 0.00 3.00 3.00 $420.00 $1,260.00 ADDITIONAL WORK: C.O.#1-SUB-TOTAL $1,260.00 $0.00 NET DECREASE TO: SECTION III ($11,218.70) Page 3 of 4