Loading...
HomeMy WebLinkAbout0120160-Building (fence) ,.I_.~..,..~, ~__"__,...~___^ml_.,_~~__._~..,.~.__,'~,,~__,,,,__,_~~,____,~_._~----,~,~--~-~--.-",""........,~-,.,.,...,.."."~""""",..,."..,.",.,."......,.,.~,.,,,,~,,~_.~..,,.-..-.,"""""...,..,..._~--,., '- re OSHKOSH ON THE WATER Job Address 226 W SMITH AVE CITY OF OSHKOSH No 120160 BUILDING PERMIT - APPLICATION AND RECORD Owner JEFFREY/MICHELLE GRESHAM Create Date 06/21/2006 Designer Contractor OWNER Category 251 - Fences Plan Type o Building o Sign o Canopy . Fence o Raze Class of Const: Size Rooms Height Ft. D Projection I Bedrooms Stories Canopies - Baths Signs - Zoning Sq. Ft. Sq. Ft. Sq. Ft. Unfinished/Basement Finished/Living Garage Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block . Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFR/ 4' high fence" less then 50% solid located in the front yard. of Work HV AC Contractor Plumbing Contractor Electric Contractor $460.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 06/21/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1518430000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easem t, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ;lAY ne. ary appr als efore starting such activity. Signature {/ Date x L-1J .-> V ~ v Address Agent/Owner OSHKOSH WI 54901 - 1812 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.