HomeMy WebLinkAbout0120160-Building (fence)
,.I_.~..,..~, ~__"__,...~___^ml_.,_~~__._~..,.~.__,'~,,~__,,,,__,_~~,____,~_._~----,~,~--~-~--.-",""........,~-,.,.,...,.."."~""""",..,."..,.",.,."......,.,.~,.,,,,~,,~_.~..,,.-..-.,"""""...,..,..._~--,., '-
re
OSHKOSH
ON THE WATER
Job Address 226 W SMITH AVE
CITY OF OSHKOSH No 120160
BUILDING PERMIT - APPLICATION AND RECORD
Owner JEFFREY/MICHELLE GRESHAM Create Date 06/21/2006
Designer
Contractor OWNER
Category
251 - Fences Plan
Type
o Building
o Sign
o Canopy . Fence o Raze
Class of Const: Size
Rooms Height Ft. D Projection I
Bedrooms Stories Canopies
-
Baths Signs
-
Zoning
Sq. Ft.
Sq. Ft.
Sq. Ft.
Unfinished/Basement
Finished/Living
Garage
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block . Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature SFR/ 4' high fence" less then 50% solid located in the front yard.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
$460.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
~
Date 06/21/2006 Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1518430000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easem t, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure ;lAY ne. ary appr als efore starting such activity.
Signature {/
Date
x L-1J .-> V ~
v
Address
Agent/Owner
OSHKOSH
WI 54901 - 1812
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.