Loading...
HomeMy WebLinkAbout0124754-Building (pool) .fi' 6 ~~ ~ OSHKOSH ON THE WATER Job Address 2387 ALLERTON DR CITY OF OSHKOSH No 124754 BUILDING PERMIT - APPLICATION AND RECORD Owner KEITH AlWENDY S SCHWALBE Create Date 05/11/2007 Designer Contractor OWNER Category 252 _ Pools-Above ground Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Pier o Other o Concrete Block o Post o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Installing a 12' above ground pool with 48" side walls. The pool will have a removable ladder when the pool is not in use. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation j Issued By: ~ _ Lr- $500.00 Plan Approval $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 05/11/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1316640000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) andfdo.cure any neces.sary appr?v~IS before starting such activity. Signature \ ~ /1..1>) /Ly S;/-; a/(,t.-L~ Da~$I/ I/O 7, Agent/Owner Address 2387 ALLERTON DR OSHKOSH WI 54904 - 8213 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.