Loading...
HomeMy WebLinkAboutPW CNT 11-07/CNG OR 1 DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 Oshkosh,Wisconsin 54903-1130 Ph.(920)236-5065 0JHKOJH Fax(920)236-5068 ON THE WATER January 27, 2012 Mark Schleis PTS Contractors, Inc. 4075 Eaton Road Green Bay, WI 54311 Re: Change Order No. 1 Contract 11-07 Dear Mr. Bowers: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and PTS Contractors, Inc. regarding the above-mentioned project. If you have any questions, please call our office at(920)236-5065. Sincerely, r,Th - p David C. Patek Director of Public Works DCP/tlt Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk(w/original) Lynn Lorenson, City Attorney(w/copy) File (w/original) 1:\Engineering\11-07 Concrete Paving and Utilities North\Project_Information\Contract Info\CHANGE ORDERSII 1-07 Page 1 of 1 Executed CO#1 Letter t-27-12.doc CHANGE ORDER # 1 DATED: 1/10/12 TO: PTS CONTRACTORS, INC FINAL 4075 EATON ROAD GREEN BAY WI 54311 Your present contract with the City of Oshkosh, Contract No. 11-07 , is hereby amended and changed as follows: NET DECREASE TO: SECTION I -CONCRETE PAVING ($51,878.54) NET DECREASE TO: SECTION II -STORM SEWER ($29,325.05) NET DECREASE TO: SECTION III -SANITARY SEWER ($28,594.11) NET INCREASE TO: SECTION IV-WATER MAIN $9,444.01 NET DECREASE TO CONTRACT: ($100,353.69) CITY OF OSHKOSH BY: 4-- -� Recommended: City Manag- Director of Public Works City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. , wcai„ omptroller App ved as to form: 1104 11(V City Atto e CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) SECTION I-CONCRETE PAVING ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 100 Pavement removal, Square complete as specified Yards 2,950 2,822.00 -128.00 $3.25 ($416.00) 101 Sidewalk and driveway removal, complete as Square specified Feet 35,985 36,289.80 304.80 $0.40 $121.92 102 Excavation,complete as Cubic specified Yards 11,580 11,637.30 57.30 $8.60 $492.78 103 7"non-reinforced concrete pavement, including integral curb, 5"base material and grading, complete as specified Square Yards 14,715 14,571.39 -143.61 $27.60 ($3,963.64) 104 8"non-reinforced concrete pavement, including integral curb,6"base material and grading, complete as specified Square Yards 7,460 7,447.33 -12.67 $31.50 ($399.11) 105 8"concrete pavement, HES, including integral curb and 6"base material and grading, complete as Square specified Yards 250 263.62 13.62 $36.00 $490.32 106 12"wide radius curb head, complete as specified Linear Feet 640 613.60 -26.40 $5.08 ($134.11) 107 Standard 24"curb&gutter, 7"(tie-in), complete as Linear specified Feet 12 13.50 1.50 $25.40 $38.10 108 Standard 30"curb&gutter, 7"(tie-in), complete as Linear specified Feet 180 173.70 -6.30 $21.35 ($134.51) 109 Sidewalk curb, complete as Linear specified Feet 25 8.20 -16.80 $17.30 ($290.64) 110 4"concrete sidewalk, Square complete as specified Feet 18,130 19,675.80 1,545.80 $3.34 $5,162.97 111 6"concrete sidewalk and driveway, complete as Square specified Feet 22,390 18,394.70 -3,995.30 $3.66 ($14,622.80) 112 8"concrete sidewalk and driveway, complete as Square specified Feet 2,930 3,110.40 180.40 $4.07 $734.23 113 2"asphaltic concrete transition,with base, Square complete as specified Yards 160 159.93 -0.07 $24.65 ($1.73) 114 3%"asphaltic concrete driveway/path,with base, Square complete as specified Feet 550 344.70 -205.30 $4.50 ($923.85) 115 3%"asphaltic concrete transition,with base, Square complete as specified Yards 210 166.41 -43.59 $46.00 ($2,005.14) Page 1 of 9 CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 116 5"asphaltic concrete pavement,with base, Square complete as specified Yards 225 274.97 49.97 $46.00 $2,298.62 117 Furnish and install crushed stone base course, complete as specified Tons 4,480 1,206.00 -3,274.00 $7.90 ($25,864.60) 118 Sawing, complete as Linear specified Feet 1,010 1,101.70 91.70 $1.50 $137.55 119 Furnish and install pavement ties(epoxy coated),complete as specified Each 240 295.00 55.00 0.00 $7.00 $385.00 120 Adjust manholes and inlets, complete as specified Each 131 112.00 -19.00 $230.00 ($4,370.00) 121 Furnish and install No.4 reinforcing bars(epoxy coated),complete as Linear specified Feet 2,750 3,530.00 780.00 $0.81 $631.80 122 Remove stumps,complete Inch as specified Diameter 53 54.00 1.00 $20.00 $20.00 123 Remove trees and stumps, complete as specified Inch Diameter 85 87.00 2.00 $25.00 $50.00 124 Furnish and install trees, complete as specified Each 5 1.00 -4.00 $250.00 ($1,000.00) 125 Furnish and install metal detectable warning fields, Square complete as specified Feet 352 344.00 -8.00 $25.40 ($203.20) 126 Terrace work on Broad Street,complete as Lump specified Sum 1 1.00 $5,191.00 127 Terrace work on Custer Avenue, complete as Lump specified Sum 1 1.00 $4,653.00 128 Terrace work on Eastman Street,complete as Lump specified Sum 1 1.00 $3,936.00 129 Terrace work on Lincoln Avenue,complete as Lump specified Sum 1 1.00 $857.00 130 Terrace work on Monroe Street, complete as Lump specified Sum 1 1.00 $5,646.00 131 Terrace work on East New York Avenue, complete as Lump specified Sum 1 1.00 $1,028.00 132 Terrace work on East Tennessee Avenue, Lump complete as specified Sum 1 1.00 $3,385.00 133 Remove rails and ties, Lump complete as specified Sum 1 1.00 $1,525.00 134 Excavation special, complete as specified Tons 800 0.00 -800.00 $10.00 _ ($8,000.00) Page 2 of 9 • CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) ITEM B!D INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 135 Furnish and install cold weather covering, 1-layer visquine, complete as Square specified Yards 3,750 0.00 -3,750.00 $0.01 ($37.50) 136 Furnish and install cold weather covering, 2-layer visquine, complete as Square specified Yards 3,750 0.00 -3,750.00 $0.01 ($37.50) 137 Furnish and install cold weather covering, 2-layer visquine and 6"hay, Square complete as specified Yards 3,750 _ 0.00 _ -3,750.00 $0.01 ($37.50) SECTION I-(BID ITEMS 100-137)-SUB-TOTALS $10,563.29 ($62,441.83) NET DECREASE TO: SECTION I ($51,878.54) SECTION II-STORM SEWER ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2014 Utility line opening, complete as specified Each 5 5.00 $860.00 2030 Furnish and install 6"storm sewer, complete as Linear specified Feet 10 10.00 $54.00 2034 Furnish and install 10" storm sewer, complete as Linear specified Feet 20 20.00 $58.00 2036 Furnish and install 12" storm sewer,complete as Linear specified Feet 1,050 1,018.90 -31.10 $43.50 ($1,352.85) 2042 Furnish and install 15" storm sewer,complete as Linear specified Feet 2,000 1,892.30 -107.70 $42.50 ($4,577.25) 2048 Furnish and install 18" storm sewer, complete as Linear specified Feet 1,225 1,206.40 -18.60 $46.50 ($864.90) 2054 Furnish and install 21" storm sewer, complete as Linear specified Feet 250 231.50 -18.50 $53.00 ($980.50) 2060 Furnish and install 24" storm sewer, complete as Linear specified Feet 575 524.10 -50.90 $59.00 ($3,003.10) 2072 Furnish and install 30" storm sewer, complete as Linear specified Feet 220 209.40 -10.60 $69.50 ($736.70) 2074 Furnish and install 30"RCP Class Ill storm sewer, Linear complete as specified Feet 25 29.00 4.00 $84.50 $338.00 2078 Furnish and install 36" storm sewer, complete as Linear specified Feet 460 440.80 -19.20 $84.50 ($1,622.40) Page 3 of 9 CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2128 Furnish and install 24"x 38"HERCP Class Ill storm sewer, complete as Linear specified Feet 400 384.70 -15.30 $94.00 ($1,438.20) 2280 Furnish and install 6"storm lateral,complete as Linear specified Feet 3,000 2,830.40 -169.60 $37.50 ($6,360.00) 2284 Furnish and install storm sewer marker balls, complete as specified Each 214 204.00 -10.00 $17.75 ($177.50) 2286 Furnish&install clay dams, complete as specified Each 108 106.00 -2.00 $29.00 ($58.00) 2532 Furnish and install standard storm manhole(4' diameter), complete as Vertical specified Feet 145 131.68 -13.32 $244.00 ($3,250.08) 2534 Furnish and install standard storm manhole(5' diameter), complete as Vertical specified Feet 33 32.78 -0.22 $391.00 ($86.02) 2536 Furnish and install standard storm manhole(6' diameter), complete as Vertical specified Feet 5 4.20 -0.80 $473.00 ($378.40) 2612 Furnish and install Type 1 inlet, complete as specified Each 4 4.00 $1,383.00 2614 Furnish and install Type 3 inlet(with 18"sump), complete as specified Each 53 55.00 2.00 $1,476.00 $2,952.00 2800 Connect to existing storm sewer,complete as specified Each 8 7.00 -1.00 $783.00 ($783.00) 2802 Connect to existing storm lateral, complete as specified Each 23 1.00 -22.00 $249.00 ($5,478.00) 2806 Connect to existing manhole, complete as specified Each 8 9.00 1.00 $578.00 $578.00 2808 Connect to existing inlet, complete as specified Each 2 2.00 $578.00 2820 Abandon 8"-12"storm sewer, complete as Linear specified Feet 3,610 3,640.20 30.20 $1.00 $30.20 2824 Abandon storm manholes and inlets,complete as specified Each 26 30.00 4.00 $231.00 $924.00 2856 Furnish, install, maintain, and remove Type D inlet protection, complete as specified Each 174 117.00 -57.00 $65.00 ($3,705.00) 2862 Furnish, install, maintain, and remove stone bag, complete as specified Each 50 15.00 -35.00 $10.00 ($350.00) SECTION II-(BID ITEMS 2014-2862)-SUB-TOTALS $4,822.20 ($35,201.90) Page 4 of 9 CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE ADDITIONAL WORK REQUIRED: C.O.#1 - SECTION II ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 20000 Additional labor, matreials, and equipment to move and reset storm inlet B-62, per Invoice 11-591-02, dated 8/30/11, complete as Lump specified Sum 0.00 1.00 1.00 $1,054.65 $1,054.65 ADDITIONAL WORK:C.O.#1 -(ITEM 20000)-SUB-TOTAL $1,054.65 $0.00 NET DECREASE TO: SECTION II ($29,325.05) SECTION III-SANITARY SEWER ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 3000 Furnish and install 8" sanitary sewer relay, Linear complete as specified Feet 3,675 3,585.20 -89.80 $52.00 ($4,669.60) 3004 Furnish and install 12" sanitary sewer relay, Linear complete as specified Feet 250 225.50 -24.50 $107.00_ ($2,621.50) 3064 Furnish and install 12-inch sanitary sewer drop, Vertical complete as specified Feet 7 6.81 -0.19 $446.00 ($84.74) 3100 Furnish and install standard sanitary manhole (4'diameter),complete as Vertical specified Feet 140 131.31 -8.69 $208.00 ($1,807.52) 3114 Furnish and install external manhole chimney seal, complete as specified Each 16 16.00 $457.00 3210 Furnish and install 8"x 6" factory wyes or tees, complete as specified Each 95 90.00 -5.00 $85.00 ($425.00) 3214 Furnish and install 12"x 6" factory wyes or tees, complete as specified Each 10 9.00 -1.00 $183.00 ($183.00) 3234 Furnish and install 476" sanitary lateral relay, Linear complete as specified Feet 3,000 2,703.10 -296.90 $69.00 ($20,486.10) 3236 Furnish and install sanitary lateral marker balls, complete as specified Each 205 202.00 -3.00 _ $18.00 ($54.00) Page 5 of 9 • CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 3238 Furnish and install clay dams, complete as specified Each 105 99.00 -6.00 $57.00 ($342.00) 3300 Furnish and install connections to existing 8" mains, complete as specified Each 1 1.00 $600.00 3302 Furnish and install connections to existing 10" mains, complete as specified Each 1 1.00 $612.00 3304 Furnish and install connections to existing 12" mains, complete as specified Each 3 3.00 $1,107.00 3330 Furnish and install concrete collars, complete as specified Each 2 0.00 -2.00 $568.00 ($1,136.00) 3332 Core into existing manhole, complete as specified Each 1 0.00 -1.00 $657.00 ($657.00) 3700 Televise sanitary sewer, Linear complete as specified Feet 3,925 3,810.70 -114.30 $1.15 ($131.45) 3800 Abandon sanitary manholes, complete as specified Each 24 27.00 3.00 $289.00 $867.00 3802 Abandon 8"sanitary sewer, Linear complete as specified Feet 2,650 2,700.00 50.00 $0.60 $30.00 3806 Abandon 12"sanitary ' sewer, complete as Linear specified Feet 1,575 2,064.00 489.00 $1.20 $586.80 SECTION III -(BID ITEMS 3000-3806)-SUB-TOTALS $1,483.80 ($32,597.91) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION III ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 3116 Furnish and install external chimney seal extension, complete as specified Each 0.00 6.00 6.00 $420.00 $2,520.00 ADDITIONAL WORK: C.O.#1 -(ITEM 3116)-SUB-TOTAL $2,520.00 $0.00 NET DECREASE TO: SECTION III ($28,594.11) Page 6 of 9 CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE SECTION IV-WATER MAIN ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 4000 Furnish and install 4" ductile iron watermain with poly wrap relay, complete Linear as specified Feet 35 32.00 -3.00 $73.50 ($220.50) 4002 Furnish and install 6" ductile iron watermain with poly wrap relay,complete Linear as specified Feet 180 161.00 -19.00 $132.00 ($2,508.00) 4004 Furnish and install 8" ductile iron watermain with poly wrap relay, complete Linear as specified Feet 3,300 3,305.00 5.00 $63.50 $317.50 4006 Furnish&install 10"ductile iron watermain with poly wrap relay, complete as Linear specified Feet 215 215.00 $85.00 4036 Furnish and install 1"water service relay, complete as Linear specified Feet 1,975 2,198.50 223.50 $43.50 $9,722.25 4038 Furnish and install 1 '/2 water service relay, Linear complete as specified Feet 16 0.00 -16.00 $62.00 ($992.00) 4048 Furnish and install 1" corporation and stop box, complete as specified Each 72 99.00 27.00 $259.00 $6,993.00 4050 Furnish and install 1 %" corporation and stop box, complete as specified Each 1 1.00 $518.00 4054 Furnish and install water service clay dams, complete as specified Each 73 100.00 27.00 $29.00 $783.00 4056 Furnish and install connections to existing 4" watermain,complete as specified Each 2 2.00 $1,283.00 4058 Furnish and install connections to existing 6" watermain, complete as specified Each 10 10.00 $1,332.00 4060 Furnish and install connections to existing 8" watermain, complete as specified Each 6 6.00 $1,385.00 4062 Furnish&install connections to existing 10" watermain, complete as specified Each 1 1.00 $1,490.00 4109 Furnish and install 8"X 4" tee, complete as specified Each 1 1.00 $299.00 Page 7 of 9 CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4110 Furnish and install 8"X 6" tee,complete as specified Each 7 8.00 1.00 $327.00 $327.00 4111 Furnish and install 8"X 8" tee, complete as specified Each 1 1.00 $390.00 4119 Furnish&install 10"X 6" tee,complete as specified Each 1 1.00 $495.00 4189 Furnish and install 8"X 8" cross,complete as specified Each 1 1.00 $553.00 4235 Furnish and install 4-inch 45 degree bend,complete as specified Each 2 4.00 2.00 $120.00 $240.00 4236 Furnish and install 6-inch 45 degree bend, complete as specified Each 18 28.00 10.00 $170.00 $1,700.00 4237 Furnish and install 8-inch 45 degree bend, complete as specified Each 6 9.00 3.00 $232.00 $696.00 4263 Furnish and install 8"X 4" reducer,complete as specified Each 1 1.00 $180.00 4267 Furnish&install 10"X 8" reducer,complete as specified Each 1 1.00 $251.00 4400 Furnish and install 4"gate valve, complete as specified Each 1 1.00 $882.00 4401 Furnish and install 6"gate valve, complete as specified Each 9 9.00 $1,032.00 4402 Furnish and install 8"gate valve, complete as specified Each 12 10.00 -2.00 $1,426.00 ($2,852.00) 4403 Furnish&install 10"gate valve, complete as specified Each 1 1.00 $2,007.00 4500 Furnish and install hydrant, complete as specified Each 9 9.00 $2,885.00 4502 Furnish and install gradelok for hydrant branches, complete as specified Each 9 0.00 -9.00 $713.00 ($6,417.00) 4900 Abandon watermain on East Custer Avenue, Harrison Street to Broad Street,complete as Lump specified Sum 1 1.00 $2,300.00 4902 Abandon watermain on Eastman Street, New York Avenue to Custer Street, Lump complete as specified Sum 1 1.00 $2,300.00 Page 8 of 9 CONTRACT: 11-07 CHANGE ORDER#1 (FINALS) ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4904 Abandon watermain on Monroe Street, East Irving Avenue to East Melvin Avenue, complete as Lump specified Sum 1 1.00 $2,300.00 4906 Abandon watermain on East Lincoln Avenue, Monroe Street to CN Railroad tracks, complete Lump as specified Sum 1 1.00 $1,500.00 4908 Abandon watermain on East New York Avenue, North Main Street to Jefferson Street, complete Lump as specified Sum 1 1.00 $1,500.00 SECTION IV-(BID ITEMS 4000-4908)-SUB-TOTALS $20,778.75 ($12,989.50) ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION IV ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4264 Furnish and install 8"x 6" reducer, complete as specified Each 0.00 1.00 1.00 $192.00 $192.00 4300 Furnish and install 8" sleeve, complete as specified Each 0.00 1.00 1.00 $226.51 $226.51 40000 Additional labor, materials, and equipment to fix a leaking joint on existing 8" water main in the intersection of Custer Avenue and Grand Street, per Invoice 11-591-01, dated 7/27/11, complete as Lump specified Sum 0.00 1.00 1.00 $1,236.25 $1,236.25 ADDITIONAL WORK: C.O.#1 (ITEMS 4264-40000)-SUB-TOTAL $1,654.76 $0.00 NET INCREASE TO: SECTION IV $9,444.01 NET INCREASE TO SECTIONS I, II, III, IV $42,877.45 NET DECREASE TO SECTIONS I,II,III, IV ($143,231.14) NET DECREASE TO CONTRACT: ($100,353.69) Page 9 of 9