Loading...
HomeMy WebLinkAbout0117248-Building e OSHKOSH ON THE WATER Job Address 426 AMHERST AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 117248 Owner JAMES THOMA Create Date 11/10/2005 Designer Category Contractor OWNER 111-Single Family Addition Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----.2 Sq. Ft. -----.2 Sq. Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies 0 Garage -----.2 Sq. Ft. Baths 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No Height Permit Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature SFRI Addition of kitchen, bar, hot tub room, and deck AND Raze existing detached garage, construct new 20' x 24' detached garage as of Work per plans. HVAC Contractor UNKNOWN??? Plumbing Contractor QUINN PLUMBING Electric Contractor MASTER ELECTRiC INC Fees: Valuation $45,000.00 Plan Approval $50.00 Permit Fee Paid $199.00 Park Dedication $0.00 Issued By: Date 11/10/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0701960000 In the performance of tI1is work I agree to perfonn all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in tI1iS,perrñffä~cation within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and)OSeCUre any¡ ~~s"" approvals before starting such activity, , ",- Signature' / /' Date II) ~ ) /-D ') L.-/ Agent/Owner OSHKOSH WI 54901 - 4302 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.