HomeMy WebLinkAbout0117248-Building
e
OSHKOSH
ON THE WATER
Job Address 426 AMHERST AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
117248
Owner JAMES THOMA
Create Date
11/10/2005
Designer
Category
Contractor
OWNER
111-Single Family Addition
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
-----.2 Sq. Ft.
-----.2 Sq. Ft.
Rooms
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
0
Garage
-----.2 Sq. Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
Height Permit Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
~
Use/Nature SFRI Addition of kitchen, bar, hot tub room, and deck AND Raze existing detached garage, construct new 20' x 24' detached garage as
of Work per plans.
HVAC Contractor
UNKNOWN???
Plumbing Contractor
QUINN PLUMBING
Electric Contractor
MASTER ELECTRiC INC
Fees: Valuation
$45,000.00 Plan Approval
$50.00 Permit Fee Paid
$199.00 Park Dedication
$0.00
Issued By:
Date 11/10/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0701960000
In the performance of tI1is work I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in tI1iS,perrñffä~cation within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and)OSeCUre any¡ ~~s"" approvals before starting such activity, , ",-
Signature' / /' Date II) ~ ) /-D ')
L.-/ Agent/Owner
OSHKOSH
WI 54901 - 4302
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.