HomeMy WebLinkAbout0124829-Building (deck)
~o
OSHKOSH
ON THE WATER
Job Address 510 ANNEX AVE
CITY OF OSHKOSH No 124829
BUILDING PERMIT - APPLICATION AND RECORD
Owner ANTHONY SAMIMI/SARAH SWEENEY Create Date 05/17/2007
Designer
Contractor OWNER
Category
142 - Decks, Patios, Ramps Plan
Type
. Building
o Sign
o Canopy o Fence o Raze
Class of Const: Size
Rooms Height Ft. o Projection I
Bedrooms Stories Canopies
Baths Signs
Zoning
Unfiinished/Basement
Sq.Ft.
Finished/Living
Sq. Ft.
Garage
Sq.Ft.
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Parl( Dedication
# Dwelling Units
o
# Structures
o
UsefNature SFRI Constructing a 11 'x20' deck off the rear of the house and installing a 6' privacy fence along the side property line. -The deck will
of Work have 48" of frost protection.
HV AC Contractor
Plumbing Contractor
Ele(:tric Contractor
Fees: valuatr
Issllled B*-- L-
$3,000.00 Plan Approval
$0.00 Permit Fee Paid
$39.00 Park Dedication
$0.00
Date 05/17/2007
FinalfO.P. 00/00/0000
o Permit Voided I
Parcelld # 1208530000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to see re any' ec sary approvals before starting such activity.
/
Agent/Owner
OSHKOSH
Da~ ./?"5 -17 -D T
('
Signature
Address
WI 54901 - 2922 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless speCified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.