HomeMy WebLinkAbout12-15 JANUARY 24, 2012 12-15 RESOLUTION (CARRIED___6-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVAL OF CHANGE ORDER NO. 2 FOR PUBLIC WORKS CONTRACT NO. 11-05 WITH CARL BOWERS & SONS CONSTRUCTION CO. FOR VARIOUS CONCRETE PAVING & UTILITY PROJECTS – SOUTH SIDE AREA (+$47,838.31) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: CARL BOWERS & SONS CONSTRUCTION CO. N1844 Maloney Road Kaukauna, WI 54130 Net Increase to Contract: $47,838.31 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. Nos. 311-0410-7480-00000 Sidewalk Construction Fund 315-0410-7480-00000 Street Improvement Fund Expenditures 317-0410-7480-03301 Special Assessment Fund – Streets 317-0410-7480-03302 Special Assessment Fund – Sewer 317-0410-7480-03303 Special Assessment Fund – Water 317-0410-7480-03304 Special Assessment Fund - Sidewalks 317-0410-7480-03305 Special Assessment Fund – Storm Water 541-1810-1799-00000 Water Utility Construction Work in Progress 551-1910-1799-00000 Sewer Utility Construction Work in Progress 561-2010-1799-00000 Storm Water Utility Constr. Work in Progress (0 Of HKOJH ON THE WATER TO: FROM DATE: RE: MEMORANDUM Honorable Mayor and Members of the Common Council Steven M. Gohde, Assistant Director of Public Works January 19, 2012 Change Order No. 2 for Public Works Contract No. 11 -05 Concrete Paving and Utilities — South Side Paving Project Carl Bowers & Sons Construction Co. ($47,838.51) BACKGROUND Change Order No. 2 for Contract 11 -05 is scheduled for consideration by the Common Council at the January 24, 2012 meeting. The contract was originally awarded to Carl Bowers & Sons Construction Co. Inc. in April of 2011. This change order is for additional services provided and for final quantities. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Concrete Paving — Actual installed quantities were less than estimated. Additional Schedule 80 - 3" conduit was added to contract, per City Electric Department. • Storm Sewer — Actual installed quantities were less than estimated. • Sanitary Sewer — Actual installed quantities were less than estimated, but additional costs were incurred for abandonment of unknown sanitary sewer. Water Main — Actual installed quantities were more than estimated. Additional quantities were installed at bid price. Estimated bid total omitted approximately 1000' of pipe. FISCAL IMPACT Contract Section Change Order Amount CIP Budget Amount New Contract Total Concrete Paving - $8,080.04 $1,941,700 $1,393,108.71 Storm Sewer - $109,269.95 $2,910,600 $2,618,467.55 Sanitary Sewer $35,347.30 $975,500 $1,176,867.80 Water Main $129,841.00 $1,379,400 $1,045,101.39 Total $47,838.51 $7,207,200 $6,233,545.45 Adequate funds are available in the relating sections of the 2011 Capital Improvement Budget. Adequate funding is available is the Sanitary Sewer section from other projects being under budget. RECOMMENDATIONS I recommend approval of Change Order No. 2 to Contact No. 11 -05 in the amount of $47,838.31 to Bowers & Sons Construction Co. Inc. 7 Res ectfully Submitted, Approved: 1�- -; Steven M. Gohde, P.E. Mark A. Rohloff Asst. Director of Public Works City Manager SMG /tlt Attachment: Change Order No. 2 [!,Engineering \11 -05 Concrete Paving and Utilities South\ Project_ Information \Correspondence - Memo \11 -05 Memo for CO #2_1- 19- 12.doc TO. Carl Sowers & Sons Const. Co. N1844 Maloney Road Kaukauna, WI 54130 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING NET DECREASE TO: SECTION II - STORM SEWER NET INCREASE TO: SECTION III - SANITARY SEWER NET INCREASE TO: SECTION IV- WATER MAIN NET DECREASE TO: SECTION V - ELECTRICAL NET INCREASE TO CONTRACT: I11TA Recommended: Director of Public Works CHANGE ORDER# DATED: 1110112 FINAL_ F. 11 -05 , is hereby amended ($8,661.54) ($109,269.95) $36,347.30 $129,841.00 $601.50 $47,838.31 CITY OF OSHKOSH City Manager City Clerk Approved and accepted: Contractor certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 11 -05 CHANGE ORDER # 2 (FINALS) SECTION I - CONCRETE PAVING 100 Pavement removal, Square INCREASE IN DECREASE IN JFEh1 DESCRIPTION Blf3 UNIT INSTALLED NET I MET I VAtly CONTRACT CONTRACT NUhrBER QUANTITY QUANTITIES INCREASE DEGREASE PRICE PRICE PRICE 100 Pavement removal, Square complete asspecified Yards 25,550 24,599.80 - 950.20 $2.42 $2,299.48 101 Sidewalk and driveway removal, complete as Square specified Feet 45,000 53,572.60 8,572.60 $0.40 $3,429.04 102 Excavation, complete as Cubic specified Yards 9,750 9,520.40 - 229.60 $9.5{3 $2,181.20 103 7" Non - reinforced concrete pavement, Including Integral curb, 5" base material and grading, complete as specified Square Yards 10,850 10,349.40 - 500.60 $24.00 $12,014.40 104 8" Non - reinforced concrete pavement, Including integral curb, 6" base material and grading, complete as specified Square Yards 13,540 13,878.00 338.00 $26.65 $9,007.70 105 8" Concrete pavement, HES, including integral curb and 6" base material and grading, complete as Square specified Yards 1,645 1,741.20 96.20 $35.00 $3,367.00 106 12" wide radius curb head, complete as specified Linear Feet 1,100 1,054.40 -45.60 $12.20 $556.32 107 Standard 30" curb & gutter, 7" (tie -in), complete as Linear specified Feet 280 292.40 12.40 $25.20 $312.48 108 Sidewalk curb, complete Linear asspecified Feet 310 275.20 -34.80 $20.00 $696.00 109 4'' concrele sidewalk, Square complete asspecified Feet 20,400 27,124.70 6,724.70 $3.30 $22,191.51 110 6" concrete sidewalk and driveway, complete as Square specified Feet 28,275 27,495.10 - 779.90 $3.75 $2,924.63 111 6" concrete step, complete Square asspecified Feet 46 48.40 2.40 $20.00 $48.00 112 2" asphaltic concrete transition. with base, Square complete asspecified Yards 450 525.40 75.40 $19.15 $1,443.91 113 3' /2 " asphaltic concrete driveway /path, with base, Square complete asspecified Yards 240 145.80 - 94.20 $7.00 $659.40 114 3 W asphaltic concrete transition with base, Square complete ass ecifsed Yards 850 1,043.20 193.20 $29.10 $5,622.12 115 3'/2` asphaltic concrete pavement, with base, Square com plete asspecified Yards 1,280 1,449.40 169.40 $23.70 $4,014.78 116 5" asphaltic concrete _ pavement, base in place, Square complete asspecified Yards 2,360 2,284.80 - 75.20 $22.00 ($1,654.40)_ 117 Furnish and Install crushed stone base course, complete as specified Tons 4,620 1 0.00 - 4,620.00 $7.00 $32,340.00 Page 1 of 16 CONTRACT: 11 -05 CHANGE ORDER # 2 (FINALS) ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCR✓=ASEIN CONTRACT DECREASE IN CONTRACT PRICE PRICE 118 Sawing, complete as Linear specified Feet 3,500 3,253.20 - 246.80 $2.00 $493.60 119 Furnish and install pavement ties (epoxy coated), complete as specified Each 210 247.00 37.00 $7.00 $259.00 120 Adjust manholes and inlets, complete as s ecified Each 207 206.00 -1.00 $225.00 $225.00 121 Furnish and install loo. 4 reinforcing bars (epoxy coated), complete as Linear specified Feet 4,620 5,166.00 546.00 $1.10 $640.60 122 Remove trees and stumps, complete as specified Inca Diameter 4 7.00 3.00 $250.00 $750.00 123 Furnish and install trees, complete ass ecified Each 1 1.00 $250.00 124 Furnish and install metal detectable warning fields, Square complete ass ecified Foot 656 664.00 8.00 $28.50 $228.00 125 Terrace work on Knapp Street from W. 10th Avenue to W. 5th Avenue, complete as specified Lump Sum 1 1.00 $3 930.00 126 Terrace worK on Knapp Street from W. 5th Avenue to north line of Witzet Avenue, complete as Lump s ecified Sum 1 1.00 $4,930.00 127 Terrace work on Knapp Street from north line of Witzel Avenue to River, Lump complete. ass ecified Sum 1 1.00 $2,505.00 128 Terrace work on W. 4111 Avenue from Knapp Street to Idaho Street, complete Lump ass ecified Sum 1 1.00 $5,858.00 129 Terrace work on W. 5th Avenue from Knapp Street to Idaho Street, complete Lump ass ecified Sum 1 1.00 $5,810,00 130 Terrace work on W. 51h Avenue from Ohio Street to Michigan Street, complete Lump ass ecified Sum 1 1.00 $2,475.00 131 Terrace work on Michigan Street from W. 5th Avenue to W. 4th Avenue, complete as specified Lump Sum 1 1.00 $2,520.00 132 Terrace work on Michigan Street from W. 4th Avenue to River, complete as Lump specified Sum 1 1.00 $1,375.00 133 Excavation special, complete ass ecified Tons 800 530.50 - 269.50 $15.00 $4,042.50 134 Maintenance of traffic in the Witzel Avenue and Lump Knaee Street intersection Sum 1 1.00 $3,000.00 Page 2 o €16 CONTRACT: 11 -05 CHANGE ORDER t# 2 (FINALS) SECTION I - (BID ITEMS 100 -135) - SUB- TOTALS $51,274.14 ($60,086.93) ADDITIONAL WORK REQUIRED: C.O. #12 - SECTION I Time request extension for INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT INCREASE IN DECREASE IN INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT BID INSTALLED NET NE7 UNIT CONTRACT CONTRACT NUMBER PRICE PRICE QUANTITY QUANTITIES INCREASE DECREASE PRICE_ PRICE PRICE 135 Maintenance of traffic in Linear the West 9th Avenue and Lump 1,900 1,687.10 - 212.90 $42.00 $8,941.80 Knapp Street intersection Sum 1 1.00 5.00 $3,000.00 $0.00 SECTION I - (BID ITEMS 100 -135) - SUB- TOTALS $51,274.14 ($60,086.93) ADDITIONAL WORK REQUIRED: C.O. #12 - SECTION I 10000 Time request extension for INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT INCREASE IN DECREASE IN ITEM DESCRIPTION CONTRACT UNIT INSTALLED NET NE7 UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DEGREASE PRICE PRICE PRICE 10000 Time request extension for INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT e!D INSTALLED NET NET UNIT CONFRACT CONTRACT NUMBER hauling contaminated soil QUANTITIES INCREASE DECREASE PRICE PRICE PRICE -4.00 $600.00 $2,400.00 2036 to landfill during storm sewer installation, per Linear Invoice #72, complete as f=eet 1,900 1,687.10 - 212.90 $42.00 $8,941.80 s ecifted Days 0.00 5.00 5.00 $0.00 $0.00 10001 Time request extension for breaking and removing bedrock during sanitary sewer installation, per Invoices 73, 79, 87, 94, and 98, complete as specified Days 24.00 24.00 $0.00 10002 Furnish and install communication vaults for the inter- connect system, complete asspecified Each 4.00 4.00 $2,310.00 10003 Reset section monument and re- establish witness monuments in the intersections of W. 9th Avenue and Knapp Steet and Witzel Avenue and Knapp Street, complete as Lump spacifiad Sum 1.00 1.00 $3,475.00 10004 Furnish and install 314" Mississippi River Stone in landscaping area of Sister's Restaurant, which was disturbed during rodway construction, Lump complete as specified Sum 0.00 1.00 1.00 $131.25 $131.25 ADDITIONAL WORK: 0.0.#2 -(ITEMS 10000 - 10004) -SUB-TOTAL $131.25 $0.00 NET DECREASE TO: SECTION 1 ($8,681.54) SECTION It - STORM SEWER 2014 Utility Line Opening, INCREASE IN DECREASE IN ITEM DESCRIPTION UNIT e!D INSTALLED NET NET UNIT CONFRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2014 Utility Line Opening, com fete asspecified Each 6 2.00 -4.00 $600.00 $2,400.00 2036 Furnish and install 12" Storm Sewer, complete as Linear specified.. f=eet 1,900 1,687.10 - 212.90 $42.00 $8,941.80 Page 3 of 16 CONTRACT: 11 -05 CHANGE ORDER it 2 (FINALS) ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASEIN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2042 Furnish and install 15" Storm Sewer, complete as Linear specified Feet 475 370.00 - 105.00 $46.00 $4,830.04 2048 Furnish and install 18" Storm Sewer, complete as Linear specified Feet 550 582.80 32.80 $50.00 $1,640.00 2060 Furnish and install 24" Storm Sewer, complete as Linear specified Feet 550 512.00 -38.00 $57.00 ($2,166.00) 2066, Furnish and install 27" Storm Sewer, complete as Linear specified Feet 125 91.90 -33.10 $61.00 $2,019.10 2072 Furnish and install 30" Storm Sewer, complete as Linear specified Feet 450 412.70 -37.30 $79.00 ($2,946.70) 2478 Furnish and install 36" Storm Sewer, complete as Linear s ecified Feet 40 22.30 -17.70 $93.00 $1,646.10 2084 Furnish and install 42" Storm Sewer, complete as Linear specified Feet 1,500 1,439.60 -60.40 $125.00 $7,550.00 2090 Furnish and install 48" Storm Sewer, complete as Linear specified Feet 300 258.80 -41.20 $155.00 $6,386.00 2496 Furnish and install 54" Storm Sewer, complete as Linear specified Feet 300 275.70 -24.30 $175.00 $4,252.50 2102 Furnish and install 60" Storm Sewer, complete as Linear s ecified Feet 800 745.30 - 54.70 $195.00 $10,666.50 2108 Furnish and install 66" Storm Sewer, complete as Linear specified Feet 450 421.40 -28.60 $215.00 $6,149.04 2174 Furnish and install 4'x6' Box Culvert Storm Sewer, Linear complete asspecified Feet 475 451.70 -23.30 $330.00 $7,689.06 2188 Furnish and install 5'x8' Box Culvert Storm Sewer, Linear complete asspecified Feet 1,470 9,461.60 -8.40 $450.06 $3,780.00 2189 Furnish and install 5'x8' Box Culvert Storm Sewer wlclay bedding and backfill and joint ties, complete as Linear specified Feet 110 146.30 -3.70 $55DA0 $2,035.00 2196 _ Furnish and install 5'x16' Box Culvert Storm Sewer, Linear complete asspecified Feet 540 535.80 -4.20 $605.00 $2,541.00 2197 Furnish and install 5'x10' Box Culvert Storm Sewer wlclay bedding and backfill and joint ties, complete as Linear specified Feet 80 78.90 -1.10 $736.00 $803.00 2236 Furnish and install 5'x8' Box Culvert Storm Sewer wi MH Riser, complete as Linear specified Feet 62 52.50 -9.50 $440.00 $4,180.00 2244 Furnish and install 5'x10' Box Culvert Storm Sewer wl MH Riser, complete as Linear specified Feet 16 11.00 -5.00 $620.00 $3,100.00 Page 4 of 16 CONTRACT: 11.05 CHANGE ORDER /t 2 (FINALS) ITEM DESCRIPTION DESCRIPTION UNIT INSTALLED NET NET UNIT INCREASEIN CONTRACT DECREASEIN CONTRACT NUMBER NU QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2280 Furnish and install 6" Storm Lateral, complete as Linear specified Feet 3,950 3,843.60 - 106.50 $32.00 $3,40II.04 2282 Furnish and install 8" Storm Lateral, complete as Linear specified Feet 52 0.00 -52.00 $45.00 $2,340.00 2284 Furnish and install Storm Sewer Marker Balls, complete asspecified Each 300 289.00 -11.00 $20.00 $220.00 2286 Furnish & install clay dams, complete as specified Each 150 145.00 - 5.00 $100.00 $500.06 2376 Furnish and install 5'x8' Sox Culvert End Section wl joint ties, complete as specified Each 1 1.00 $8,000.00 2384 Furnish and install 5x10' Box Culvert End Section w/ joint ties, complete as specified Each 1 1.00 $9,000.00 2532 Furnish and install Standard Storm Manhole (4' diameter), complete as Vertical specified Feet 111 904.25 - 6.75 $285.00 ($1,923.75) 2534 Furnish and install Standard Storm Manhole (5' diameter), complete as Vertical specified Feet 44 45.89 5.89 $350.00 $2,051.50 2536 Furnish and install Standard Storm Manhole (6' diameter), complete as Vertical specified Feet 69 42.24 -26.76 $400.00 $10,704.p 2548 Furnish and install Standard Storm Manhole (6'x6' Box), complete as Vertical specified Feet 41 65.80 24.80 $700.00 1 $17,360.00 2550 Furnish and Install Standard Storm Manhole (7'x7' Box), complete as Vertical specified Feet 63 54.51 -8.49 $800.00 $6,792.00 2556 Furnish and install Standard Storm Inlet Manhole (4' diameter), Vertical cam fete as specified Feet 25 19.62 -5.38 $275.00 $1,479.50 2580 Furnish and install Storm Junction Chamber, com fete asspecified Each 6 6.00 $17,000.00 2584 Furnish and install Standard Storm Manhole Riser (4' diameter), Vertical complete asspecified. Feet 5 4.71 - 0.29 $250.00 $72.50 2590 Furnish and install Standard Storm Inlet Manhole Riser (4' diameter), complete as Vertical specified Feet 1 0.20 0.80 $360.00 $288.00 2612 Furnish and install Type 1 Inlet, complete as specified Each 12 12.00 $1,400.00 2614 Furnish and install Type 3 Inlet (w/18" Sump), 'complete ass ecified Each 79 79.00 $1,450.00 Page 5 of 16 CONTRACT: 11 -05 CHANGE ORDER # 2 (FINALS) ITEM Additional trucks and BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 2616 Furnish and install Type 3 QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Inlet, complete as specified installation on Michigan Each 4 4.00 $1,500.00 2618 Furnish and install Type 3 Inlet Riser, complete as specified Each 4 4.00 $350.00 2800 Connect to Existing Storm Sewer, complete as specified Each 15 17.00 2.00 $300.00 $600.00 2802 Connect to Existing Storm Lateral, complete as specified Each 102 0.00 - 102.00 $1100.00 ($10,20 0 2806 Connect to Existing Manhole, complete as .specified Each 1 1.00 $500.00 2808 Connect to Existing Inlet, complete as specified Each 2 2.00 $400.00 2820 Abandon 8" - 12" Storm Sewer, complete as Linear s ecified Feet 960 950.40 -9.60 $8.00 $76.80 2822 Abandon 15" & Larger Storm Sewer, complete as Linear specified Feet 1,800 1,735.40 -64.60 $12.00 $775.20 2824 Abandon Storm MH's and Inlets, complete as specified Each 35 35.00 $250.00 2856 Furnish, install, maintain, and remove Type D Inlet Protection, complete as specified Each 264 172.00 -92.00 $75.00 $6,900.00 2862 Furnish, install, maintain, and remove Stone Bag, complete as specified_ Each 50 0.00 -50.00 $10.00 $500.00 2866 Furnish, install, maintain, and remove 20" Diameter Sediment Lags, complete Linear ass ecified Feet 147 80.00 - 67.00 $10.00 $670.00 2872 Furnish, install, maintain, and remove Turbidity Barrier, complete as specified Each 3 3.00 $3,000.00 2948 Furnish and install heavy rip -rap, with filter fabric, Square complete asspecified Yards 136 136.00 $50.00 SECTION If - (BID ITEMS 2014 - 2948) - SUB-TOTALS $21,661.50 ($130,931.45) ADDITIONAL WORK REQUIRED: C.O. # 2 - SECTION II 20000 Additional trucks and INCREASEIN DECREASEIN ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNfT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 20000 Additional trucks and drivers required to haul contaminated soil to the landfill during storm sewer installation on Michigan Street, per Invoice #59, complete as specified Hours 1 83.25 83.25 $105.00 Page 6 of 16 CONTRACT: 11 -05 CHANGE- ORDER H 2 (FINALS) !TEAT DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE 1N CONTRACT DECREASE IN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 20001 Additional equipment, labor, and materials to relfo -fit the Type -III inlet and attach to the box culvert, per Invoice 1160, complete asspecified Hours 6.00 6.00 $75.00 20002 Additional equipment, labor, and materials to core hole for storm lateral in box culvert and then cap, when homeowner requested different location, per Invoice 1161, complete as Lump specified Sum 1.00 1.00 $823.75 20003 Additional equipment, labor, and materials to core into the back of Intel and connect 8" storm sewer lead for Electric Division parking lot, per Invoice 11106, complete as specified Hours 1.00 1.00 $1,055.00 20004 Additional equipment, labor, and materials to core new hole and block tip the proposed hole in MH K -78 to match field conditions, per Invoice 11107, complete as specified ]tours 2.00 2.00 $1,055.00 20005 Additional trucks and drivers required to haul contaminated soils from Knapp Street to Fernau Avenue stockpile site until they can be tested, per Invoice 10B, complete as Lump specified Sum 1.00 1.00 $715.00 20006 Additional equipment, labor, and materials to break Into MH E -4 -13 and upsize hole due to redesigned pipe from 2010 design, per Invoice 11109, complete as specified Hours 1.50 1.50 $1,055.00 20007 Additional equipment, labor, and materials to break out concrete encased 15" storm manhole in the W. 16th Avenue and Knapp Street intersection, per invoice 11113, complete as specified Hours 1.00 1.00 1 $1055.00 ADDITIONAL WORK: c.O.112 - (ITEMS 20000 - 20007) - SUB -TOTAL $0.00 $0.00 SECTION III - SANITARY SEWER NET DECREASE TO: SECTION 11 ($109,269.95) Page 7 of 16 CONTRACT: 11 -05 CHANGE ORDER 112 (FINALS) 3000 Furnish and install 8 -inch INCREASE IN DECREASE IN ITEM sanitary sewer relay, Linear 810 INSTALLED NET NET UNIT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE 3000 Furnish and install 8 -inch INCREASEIN DECREASEIN ITEM sanitary sewer relay, Linear 10 INSTALLED NET NET UNIT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE I DECREASE PRICE CONTRACT CONTRACT 3002 Furnish and install 10 -inch PRICE PRICE 3000 Furnish and install 8 -inch sanitary sewer relay, Linear complete asspecified Feet 3,650 3,581.80 -68.20 $63.00 $4,296.60 3002 Furnish and install 10 -inch sanitary sewer relay, Linear complete asspecified Feet 460 437.30 -22.70 $91.00 $2,065.70 3004 Furnish and install 12 -inch sanitary sewer relay, Linear complete asspecified Feet 2,750 2,722.60 -27.40 $80.00 $2,192.00 3014 Furnish and install 30 -inch sanitary sewer relay, Linear complete as specified Feet 50 37.50 -12.50 $160.00 $2,000.00 3060 Furnish and install 8 -inch sanitary sewer drop, Vertical complete as specified Feet 20.87 0.00 - 20.87 $350.00 $7,304.50 3064 Furnish and install 12 -inch sanitary sewer drop, Vertical complete asspecified Feet 4.31 0.00 -4.31 $400.00 $1,724.00 3100 Furnish and install standard sanitary manhole (4' diameter), complete as Vertical specified Feet 455 451.80 - 3.20 $190.00 $608.00 3114 Furnish and install external manhole chimney seat, complete as specified Each 37 36.00 -1.00 $475.00 $475.00 3210 Furnish and install 8" x 6" factory wyes or tees, complete asspecified Fach 89 87.00 - 2.00 $90.00 $180.00 3212 Furnish and install 10" x 6" factory wyes or tees, complete asspecified Each 9 9.00 $150.00 3214 Fufnish and install 12" x 6" factory nryes or tees, complete asspecified Fact) 48 52.00 4.00 $250.00 $1,000.00 3230 Furnish and install 4 -inch sanitary laterals new, Linear complete asspecified Feet 90 94.00 4.00 $56.00 $224.00 3234 Furnish and install 4 "/6" sanitary lateral relay, Linear complete asspecified Feet 4,250 4,487.00 237.00 $56.00 $13,272.00 3236 Furnish and install sanitary lateral marker balls, complete as specified Each 300 305.00 5.00 $20.00 $100.00 3238 Furnish and install clay dams, complete as specified Each 150 146,00 -4.00 $100.00 $400.00 3300 Furnish and install connections to existing 8" mains, complete as specified Fact) 5 5.00 $500.00 3302 Furnish and install connections to existing 10" mains, complete as specified Each 2 2.00 $500.00 Page 8 of 16 CONTRACT: 11 -05 CHANGE ORDER /12 (FINALS) ITEM DFSGRlPTlCN UNIT B!D INSTALLED NET NET UNIT INCREASEIN CONTRACT 0FCRE4SEiN CONTRACT NUMBER ID INSTALLED NET QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3304 Furnish and install PRICE PRICE connections to existing 12" mains, complete as s ocified Each 3 3.00 $500.00 3306 Furnish and install connections to existing 15" mains, complete as specified Each 1 1.00 $500.00 3308 Furnish and install connections to existing 18" mains, complete as specified Each 4 4.00 $500.00 3314 Furnish and install connections to existing 30" mains, complete as specified Each 1 1.00 $1,500.00 3330 Furnish and install concrete collars, complete asspecified Each 2 0.00 -2.00 $500.00 $1,000.00 3332 Core into existing manhole, complete as specified Each 3 3.00 $600.00 3404 Furnish and install 10" Open cut casing pipes, Linear complete asspecified Feet 435 371.50 - 63.50 $90.00 $5,715.00 3406 Furnish and install 12" open cut casing pipes, Linear complete asspecified Feet 60 51.00 - 9.00 _$100.00 $900.04 3410 Furnish and install 18" open cut casing pipes, Linear complete ass ecified Feet 25 20.00 -5.00 $120.00 $600.00 3700 Televise sanitary sewer, Linear complete asspecified Feet 6,910 6,782.10 - 727.90 $1.00 $127.90 3800 Abandon sanitary manholes, complete as specified Each 36 36.00 $400.00 3802 Abandon 8 -inch sanitary sewer, complete as Linear specified Feet 1,947 1,947.00 $3.00 3804 Abandon 10 -inch sanitary sewer, complete as Linear Specified Foot 2,507 2,507.00 $3.00 3806 Abandon 12 -inch sanitary sewer, complete as Linear specified Feet 1 1,025 1 1,025.00 $4.00 SECTION III - (BID ITEMS 3000 - 3806) - SUB - TOTALS $14,596.00 ($29,588,70) ADDITIONAL WORK REQUIRED: C.O. ## 2 - SECTION III Page 9 of 16 INCREASEIN DECREASEIN ITEM DESCRIPTION UNIT ID INSTALLED NET NET UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Page 9 of 16 CONTRACT: 11 -05 CHANGE ORDER # 2 (FINALS) ITEM DESCRIPTION UNIT B10 INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 30000 Additional equipment, labor, and materials to break and remove bedrock found during sanitary sewer excavation on Knapp Street, per Invoices 57, 58, 65 -70, 75 -78, 80- 86, 88 -93, and 95 -97, complete as specified C.Y. 330,70 330.70 $300.00 30001 Additional equipment, labor, and materials to break out concrete encased 30" sanitary sewer in the W. 5th Avenue and Michigan Street intersection to connect to existing sanitary sewer, per invoice 62, complete as specified Hours 2.50 2.50 $1,055.00 30002 Additional equipment, labor, and materials to excavate around double gas laterals and install sanitary sewer laterals at 208, 214, 220, 244, 323, 353, and 929 Knapp Street, per Invoices 63 & 111, complete as specified Hours 3.50 3.50 $11055.00 30003 Additional equipment, labor, and materials to excavate around double gas main to install sanitary sewer main in the intersection of Knapp Street and Durfee Avenue, per Invoice 64, complete as specified Hours 1.00 1.00 $1,055.00 30004 Additional equipment, labor, and materials to core an 8" sanitary lateral into manhole for St. Jude Chruch, per Invoice #100, Lump com leie asspecified Sum 1.00 1.00 $695.00 30005 Additional equipment, labor, and materials to excavate and install two 8" Inset -A -Tees into 12" sanitary sewer main at two locations due to laterals running at skewed angles, per Invoice #101, complete as specified Lump Sum 1.00 1.00 $4,820.00 Page 10 of 16 CONTRACT: 11 -05 CHANGE ORDER 4 2 (FINALS) ITEM DESCRIPTION UNIT WO INSTALLED NET NET UNIT INCREASEIN CONTRACT DECR I=ASEIN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 30006 Additional equipment, labor and materials to excavate additional depth (5') for MH K -16 located at W. 8th Avenue and Knapp Street to match existing field conditions, per Invoice #143, complete as Lump specified Sum 1.00 1.00 $1,055.00 30007 Additional equipment, labor, and materials to excavate and install an additional sanitary lateral to 928 W. 5th Avenue, per Invoice #110, complete as specified Hours 1.50 1.50 $1,055.00 30008 Additional equipment, labor, and materials to cap sanitary lateral for 702 Knapp Street, per Invoice 112, complete as specified Lump Sum 1.00 1.40 $2 85D.OD 30009 Additional equipment, labor, and materials to cap sanitary lateral for 927 Knapp Street, per Invoice 114, complete as specified Lump Sum 1.00 1.00 $2,137.50 30010 Additional equipment, labor, and materials to care 15" hole and install boot into sanitary MH K -28 to match field conditions, per Invoice #115, complete as specified Each 1.00 1.00 $600.00 30011 Additional equipment, labor, and materials to excavate, remove, and stone backf€ll an existing unknown 24" sanitary sewer when connecting into sanitary MH K -26 in the Witzel Avenue/ Knapp Steet intersection, per Invoice #116, complete as Lump specified Sum 1.00 1.00 $6,727.50 30012 Additional equipment, labor, and materials to remove and stone backfill 180' of existing 24" sanitary sewer which was located directly below proposed sanitary sewer on Knapp Street north of Witzel Avenue, per invoice #117, complete as specified Lump Sum j 1.00 1.00 1 $5,880.00 Page 11 of 16 CONTRACT: 11 -05 CHANGE ORDER 11 2 (FINALS) ITEM Furnish and install 4 -Inch BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 30093 Additional equipment, Feet 90 62.00 -28.00 $67.00 PRICE PRICE 4002 labor, and materials to remove and stone backfill 260' of an old abandoned Linear 12" force main,discovered Feet 380 568.50 188.50 $68.00 $12,818.00 4004 during the installation of the propsoed sanitary sewer, per Invoice 11118, Cubic complete as specified Yards 310.00 310.00 9,067.00 $12.00 $74,690.00 30014 Additional equipment, labor, and materials to excavate to deep sanitary main and install an 8 "x6" Linear wye and sanitary lateral, Feet 160 145.00 -15.00 $92.00 $1,380.00 4036 per Invoice 11919, complete Lump as specified Sum 1.00 1.00 $7,872.50 3008 Furnish and install 18 -Inch Feet 3,100 3,800.00 700.00 $45.00 $31,500.00 4038 sanitary sewer, complete asspecified L. F. 0.00 3,00 3.00 $150.00 $450.00 3808 Abandon 15 -inch sanitary Feet 75 36.00 - 39.00 $56.00 $2,184.00 4040 sewer, complete as specified L. F. 0.00 3,090.00 3,090.00 $16.00 $49,440.00 3810 Abandon 18 -inch sanitary Feet 35 36.00 1.00 $62.00 $62.00 sewer, complete as specified L. F. 0.00 25.00 25.00 $18.00 $450.00 ADDITIONAL WORK: C. O. Y 2 - (ITEMS 30000 - 30014) - SUB-TOTAL $50,340.00 $0.00 NET INCREASE TO: SECTION 111 $35,347.30 SECTION IV - WATER MAIN 4000 Furnish and install 4 -Inch INCREASE IN D1 CREASE IN ITEM ductile iron watermain BID INSTALLED NET NET UNIT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT complete asspecified Feet 90 62.00 -28.00 $67.00 PRICE PRICE 4000 Furnish and install 4 -Inch ductile iron watermain wlpoly wrap relay, Linear complete asspecified Feet 90 62.00 -28.00 $67.00 $1,876-00 4002 Furnish and install 6 -inch ductile iron watermain wlpoly wrap relay, Linear co m leto asspecified Feet 380 568.50 188.50 $68.00 $12,818.00 4004 Furnish and install 8 -inch ductile iron watermain wlpoly wrap relay, Linear complete asspecified Feet 5,650 6,717.00 9,067.00 $70.00 $74,690.00 4008 Furnish and install 12 -Inch ductile iron watermain wlpoly wrap relay, complete as specified Linear Feet 160 145.00 -15.00 $92.00 $1,380.00 4036 Furnish and install 1 -inch water service relay, Linear co m fete asspecified Feet 3,100 3,800.00 700.00 $45.00 $31,500.00 4038 Furnish and install 1 '/2- inch water service relay, Linear complete asspecified Feet 75 36.00 - 39.00 $56.00 $2,184.00 4040 Furnish and install 2 -inch water service relay, Linear complete asspecified Feet 35 36.00 1.00 $62.00 $62.00 Page 12 of 16 CONTRACT: 11 - 05 CHANGE ORDER 112 (FINALS) ITEM RID INSTALLED NET NET UNIT INCREA$E IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 4042 Furnish and install 1 -inch water service new, Linear complete asspecified Feet 65 86.00 21.00 $52.00 $1,092.00 4048 Furnish and install 1 -inch corporation and stop box, complete as specified Each 132 135.00 3.00 $250.00 $750.00 4050 Furnish and install 1 %,- inch corporation and stop box, complete as specified Each 2 2.00 $600.00 4052 Furnish and install 2 -inch corporation and stop box, complete asspecified Each 1 1.00 $750.00 4054 Furnish and install Water service clay dams, complete asspecified Each 135 138.00 3.00 $100.00 $300.00 4056 Furnish and install connections to existing 4" watermain, complete as specified Each 5 5.00 $500.00 4058 Furnish and install connections to existing 6" watermain, complete as specified Each 15 16.00 1.00 $600.00 $600.00 4060 Furnish and install connections to existing 8" watermain, complete as specified Fach 9 8.00 -1.00 $700.00 $700.00 4064 Furnish and install connections to existing 12" watermaln, complete as specified Each 2 2.00 $800.00 4109 Furnish and install 8" X 4" tee, complete as specified Each 4 4.00 $350.00 4110 Furnish and install 8" X 6" tee, Complete as specified Each 19 20.00 1.00 $400.00 $400.00 4.111 Furnish and install 8 "X 8" too, complete as specified Each 8 8.00 $450.00 4126 Furnish and install 12" x 6" tee, complete as specified Each 3 3.00 $650.00 4189 Furnish acid install 8" X 8" crass, complete as specified Each 5 5.00 $650.00 4191 Furnish and install 8" X 12" cross, complete as s ecified Each 1 1.00 $850.00 4228 Furnish and install 8 -inch 221/2 degree bend, complete as specified Each 1 1.00 $320.00 4235 Furnish and install 4 -inch 45 degree bend, complete as specified Each 4 8.00 4.00 $215.00 $860 .00 4236 Furnish and install 6 -inch 45 degree bend, complete ass ecified Each 31 67.00 36.00 $260.00 $9,360.00 4237 Furnish and install 8 -inch 45 degree bend, complete asspecified Each 16 35.00 19.00 $320.00 $6,080.00 Page 13 of 16 CONTRACT: 11 -05 CHANGE ORDER # 2 (FINALS) ITEA1 DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREAS>;IN CONTRACT DECREASEIN CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 4239 Furnish and install 12 -Inch PRICE PRICE 45 degree bend, complete asspecified Each 4 4.00 $600.00 4255 Finnish and install 8 -inch cap, complete as specified Each 2 2.00 $210.00 4263 Furnish and install 8" X 4" reducer, complete as specified Each 1 1.00 $270.00 4264 Furnish and install 8" X 6" reducer, complete as specified_ Each 10 10.00 $390.00 4400 Furnish and install 4 -inch gate valve, complete as specified Each 4 3.00 -1.00 $925.00 $925.00 4401 Furnish and install 6 -inch gate valve, complete as specified Each 21 23.00 2.00 $1,050.00 $2,100.00 4402 Furnish and install 8 -inch gate valve, complete as specified Fach 49 46.00 -3.00 $1,400.00 $4,200.00 4404 Furnish and install 12 -inch gate valve, complete as specified Each 2 2.00 $2,450.00 4500 Furnish and install hydrant, complete as specified Fach 16 17.00 1.00 $3,300.00 $3,300.00 4502 Furnish and install gfadelok for hydrant branchos, complete as specified Each 16 0.00 - 16.00 $1.00 $16.00 4712 Furnish and install 2 -inch steel casing pipe, complete Linear asspecified Feet 400 338.00 -62.00 $40.00 $2,480.00 4724 Furnish and install 16 -inch steel casing pipe, complete Linear ass ecified Feet 90 79.00 -11.00 $100.06 $1,100.00 4900 Abandon watermain on Knapp Street, complete as Lump specified Sufn 1 1.00 $9 000.00 4902 Abandon watermain on West 5th Avenue, Idaho Street to Knapp Street, Lump complete asspecified Sum 1 1.00 $1,000.00 4904 Abandon watermain on West 4th Avenue, Lump complete asspecified Sum 1 1.00 $1,000.00 4906 Abandon watormain on West 5th Avenue, Ohio Street to Michigan Street, Lump complete asspecified Sum 1 1.00 $1,000.00 4908 Abandon watermain on Michigan Street, complete Lump asspecified Sum 1 1.00 $1,000.00 SECTION IV - (BID ITEMS 4000 - 4908) - SUB- TOTALS $143,912,00 ($14,861.00) ADDITIONAL WORT( REQUIRED: C.O. # 2 - SECTION W ITEM BID INSTALLED NET NET UNIT INCREASEIN OECREASEIN DESCRIPTION UNIT CONTRACT CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE Page 14 of 16 CONTRACT: 11 -05 CHANGE ORDER # 2 (FINALS) lTEt i Furnish and instal 4" cap, BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRrPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 40000 Additional equipment, PRICE PRICE 26.00 3,00 $575.00 PRICE PRICE 4253 Furnish and instal 4" cap, B!D INSTALLED NET NET UNIT INCRF_ASEIN DECREASEIN NUMB l R DESCR1PT10N i (INIT complete ass ecifed Each 0.00 1.00 1.00 $150.00 $150.00 40000 Additional equipment, PRICE PRICE 26.00 3,00 $575.00 $1,725.00 5001 labor, and materials to drop proposed 8" water main under the existing 16" Each 4 0.00 -4.00 $475.00 $1,900.00 watermain to match field conditions, per Invoice 1174, work done by Don Hietpas & Sons, complete Lump as specified Slim 1.00 1.00 $1,267.50 40001 Additional equipment, labor, and materials to re- connect a 1 -114" water service to Leroy's Bar, per Invoice 1199, complete as Lump Specified Sum 1.00 1.00 $1,582.50 40002 Additional equipment, labor, and materials to excavate an existing 4" water main, cut off a 4" valve, and cap tee, per Water Department's request, par Invoice 11102, complete as specified Hours 1.00 1.00 $1,055.00 40003 Additional equipment, labor, and materials to lower the existing 16" concrete water main to avoid vertical conflict with box culvert, per invoice #104, complete as Lump specified Sum 1.00 1.00 $35,099.39 40004 Credit for stone backfill for allowing the water main to be shallowed up from depths of 9' to 10' to 6.5', throughout various areas of Knapp Street, complete as specified Tons 1.00 1.00 $8.00 40005 Furnish and install 8" x 18" offset, complete as s acifed Each 0.00 1.00 1.00 $640.00 $640.00 ADDITIONAL WORK: C.Q. # 2 (ITEMS 4253 - 40005) - SUB -TOTAL $790.00 $0.00 NET INCREASE TO: SECTION IV $129,1341.00 SECTION V - ELECTRICAL ITEM Pull Box— Steel 24" x42', B!D INSTALLED NET NET UNIT INCRF_ASEIN DECREASEIN NUMB l R DESCR1PT10N i (INIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT .1 PRICE PRICE 5000 Pull Box— Steel 24" x42', complete as specified Each 23 26.00 3,00 $575.00 $1,725.00 5001 Pull Box— Steel 12"x 36 ", complete as specified Each 4 0.00 -4.00 $475.00 $1,900.00 Page 15 of 16 CONTRACT: 11 -05 CHANGE ORDER tf 2 (FINALS) ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 5002 Type "2" Signal Base, complete asspecified Each 8 8.00 $725.00 5003 Type "5" Signal fuse, cant lete specified Each 8 8.00 $675.00 5004 Type "9° Control Cabinet, with base, complete as specified Each 1 1.00 $1,100.00 5005 Type "9° Control Cabinet, without base, complete as s ecified Each 1 1.00 $1,000.00 5006 2" SCH 40 PVC Electrical Conduit, complete as Linear specified Feet 130 121.00 -9.00 $5.00 $45.00 5007 3" SCH 40 PVC Electrical Conduit, complete as Linear specified Feet 3,825 3,514.50 - 310.50 $5.00 ($1,552.50) 5008 3" SCH 80 PVC Electrical Conduit, complete as Linear specified Feet 850 1,404.00 554.00 $6.00 $3,324.00 5009 6' x 6' Signal Loop — V SCH 80 PVC, complete as specified Each 2 2.00 $250.00 5010 6'x 12' Signal Loop -- 1" SCH 80 PVC, complete as specified Each 1 1.00 $300.00 5011 6' x 20' Signal Loop -- 1" SCH 80 PVC, complete as specified Each 5 5.00 $375.00 5012 Guard Post, complete as specified Each 4 2.00 -2.00 $475.00 $950.00 5013 Remove Existing Traffic Signal Bases, complete as s ecified Each 17 17,.00 $75.00 SECTION V - (BID ITEMS 5000 - 5013) - SUB- TOTALS $5,049.00 ($4,447.50) NET DECREASE TO: SECTION V $601.50 NET INCREASE TO SECTIONS I, 11, 111, IV, V $207,753.80 NET DECREASE TO SECTIONS 1, 11, 111, IV, V ($239,915.58) NET INCREASE TO CONTRACT: $47,236.81 Page 16 of 16