HomeMy WebLinkAbout12-16 JANUARY 24, 2012 12-16 RESOLUTION (CARRIED__6-0_____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 11-07 WITH PTS CONTRACTORS INC. FOR VARIOUS CONCRETE PAVING & UTILITY PROJECTS – NORTH SIDE AREA (-$100,353.69) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: PTS CONTRACTORS, INC. 4075 Eaton Road Green Bay, WI 54311 Net Decrease to contract: $100,353.69 PURPOSE: See attached Change Order. (0 OHKOH ON THE WATER TO: FROM DATE: RE: MEMORANDUM Honorable Mayor and Members of the Common Council Steven M. Gohde, Assistant Director of Public Works January 19, 2012 Change Order No. 1 for Public Works Contract No. 11 -07 Concrete Paving and Utilities — North Side Paving Project PTS Contractors, Inc. (- $100,353.69) BACKGROUND Change Order No. 1 for Contract 11 -07 is scheduled for consideration by the Common Council at the January 24, 2012 meeting. The contract was originally awarded to PTS Contractors, Inc. in May of 2011. This change order is for additional services provided and for final quantities. ANALYSIS Following is a summary of the significant changes to each section of the CIP: • Concrete Paving — Actual installed quantities were less than estimated. • Storm Sewer — Actual installed quantities were less than estimated. • Sanitary Sewer — Actual installed quantities were less than estimated. • Water Main — Actual installed quantities of 1" water service was more than estimated. FISCAL IMPACT Contract Section Change Order Amount CIP Budget Amount New Contract Total Concrete Paving - $51,878.54 $1,835,433 $1,029,155.96 Storm Sewer - $29,325.05 $835,000 $598,395.45 Sanitary Sewer - $28,594.11 $573,200 $476,188.64 Water Main $9,444.01 $817,100 $478,195.01 Total - $100,353.69 $4,060,733 $2,581,935.06 Adequate funds are available in the relating sections of the 2011 Capital Improvement Budget. RECOMMENDATIONS I recommend approval of Change Order No. 1 to Contact No. 11 -07 in the amount of - $100,353.69 to PTS Contractors, Inc. Respectfully Submitted, Steven M. Gohde, P.E. Asst. Director of Public Works SMG /tlt Attachment: Change Order No. 1 Approved: Mark A. Rohloff City Manager I Trigineerin¢U 1 -07 Concrete Paving and Utilities North`, Project_ Information \Correspondence,MemoU 1 -07 Memo for CO 42_1- 19- 12.doc TO: PTS CONTRACTORS, INC 4075 EATON ROAD GREEN SAY Wi 54311 Your present contract with the City of Oshkosh, Contract No and changed as follows: NET DECREASE TO: SECTION I - CONCRETE PAVING NET DECREASE TO: SECTION 11- STORM SEWER NET DECREASE TO: SECTION III - SANITARY SEWER NET INCREASE TO: SECTION IV - WATER MAIN NET DECREASE TO CONTRACT: 9W Recommended: Director of Public Works CHANGE ORDER # DATED: 1/10/12 FINAL 1 11 -07 , is hereby amended ($51,378.54) ($29,325.05) ($28,594,11) $9,444.01 ($100,363,69) CITY OF OSHKOSH City'Manager City Clerk Approved and accepted: Contractor certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT: 11 -07 CHANGE ORDER # 1 (FINALS) SECTION t - CONCRETE PAVING ITEM Pavement removal, Square BID INSTALLED NET NET UNIT INCREASE IN D Cf21 ASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 101 Sidewalk and driveway PRICE PRICE 100 Pavement removal, Square complete asspecified Yards 2,950 2,822.00 - 128.00 $3.25 ($416.00) 101 Sidewalk and driveway removal, complete as Square specified f=eet 35,985 36,289.80 304.80 $0.40 $121.92 102 Excavation, complete as Cubic s ecified Yards 11,580 11,637.30 57.30 $8.60 $492.78 103 7" non- reinforced concrete pavement, including integral curb, 5" base material and grading, complete as specified Square Yards 14,715 14,571.39 - 143.61 $27.60 $3,963.64) 104 8" non - reinforced concrete pavement, including integral curb, 6" base material and grading, complete as specified Square Yards 7,460 7,447.33 -12.67 $31.50 ($399.11) 105 8" concrete pavement, FEES, including integral curb and 6" base material and grading, complete as Square specified Yards 250 263.62 13.62 $36.00 1 $490.32 106 12" wide radius curb head, complete as specified Linear Feet 640 613.60 - 26.40 $5.08 ($134.11) 107 Standard 24" curb & gutter, 7" (tie -in), complete as Linear specified Feet 12 13.50 1.50 $25.40 $38.10 108 Standard 30" curb & gutter, 7" (tie -in), complete as Linear specified Feet 180 173.70 -6.30 $21.35 ($134.51) 109 Sidewalk curb, complete as Linear specified Feet 25 8.20 -16.80 $17.30 ($290.64) 110 4" concrete sidewalk, Square complete asspecified Feet 18,130 19,675.80 1,545.80 $3.34 $5,162.97 111 6" concrete sidewalk and driveway, complete as Square specified Feet . 22,390 18,394.70 - 3,995.30 $3.66 ($14,622.80) 112 8" concrete sidewalk and driveway, complete as Square specified Feet 2,930 3,110.40 180.40 $4.07 $734.23 113 2" asphaltic concrete transition, with base, Square ,complete asspecified Yards 160 159.93 -0.07 $24.65 ($1.73) 114 3'/" asphaltic concrete drivewaylpath, with base, Square complete asspecified Feet 550 344.70 - 205.30 $4.50 ($923.85) 115 3 W asphaltic concrete transition, with base, Square complete asspecified Yards 210 166.41 -43.59 $46.00 ($2,005.14) Page 1 of 9 CONTRACT: 11 -07 CHANGE ORDER # 1 (FINALS) ITEM SID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUA48ER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 116 5' asphaltic concrete pavement, with base, Square ,complete asspecified Yards J 225 274.97 49.97 $46.00 1 $2,298.62 117 Furnish and install crushed stone base course, complete as specified Tons 4,480 1,206.00 - 3,274.00 $7.90 ($25,864.60) 118 Sawing, complete as Linear s ecified Feet 1,010 1,101.70 91.70 $1.50 $137.55 119 Furnish and install pavement ties (epoxy coated), complete as s ecified Each 240 295.00 55.00 0.00 $7.00 $385.00 120 Adjust manholes and inlets, complete as specified Each 131 112.00 -19.00 $230.00 ($4,370.00) 121 Furnish and install No. 4 reinforcing bars (epoxy coated), complete as Linear specified Feet 2,750 3,530.00 780.00 $0.81 $631.80 122 Remove stumps, complete Inch asspecified Diameter 53 54,00 1.00 $20.00 $20.00 123 Remove trees and stumps, complete as specified Inch Diameter 85 87.00 2.00 $25.00 $50.00 124 Furnish and install trees, complete asspecified Each 5 1.00 - 4.00 $250.00 $1,000.00) 125 Furnish and install metal detectable warning fields, Square .Complete asspecified Feet 352 344.00 -8.00 $25.40 ($203.20) 126 Terrace work on Broad Street, complete as Lump specified Sum 1 1.00 $5,191.00 127 Terrace work on Custer Avenue, complete as Lump specified Sum 1 1.00 $4,653.00 128 Terrace work on Eastman Street, complete as Lump specified Sum 1 1.00 $3,936.00 129 Terrace work on Lincoln Avenue, complete as Lump specified Sum 1 1.00 $857.00 130 Terrace work on Monroe Street, complete as Lump specified Sum 1 1.00 $5,646.00 131 Terrace work on East New York Avenue, complete as Lump specified Sum 1 1.00 $1,028.00 132 Terrace work on East Tennessee Avenue, Lump complete asspecified Sum 1 9.00 $3,385.00 133 Remove rails and ties, Lump complete asspecified Sum 1 1.00 $1,525,00 134 Excavation special, com lets asspecified Tons 800 0.00 - 800.00 $10.00 ($8,000.00) Page 2 of 9 CONTRACT: 11 -07 CHANGE ORDER # 1 (FINALS) ITEM Utility line opening, BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT 2030 DESCRIPTION UNIT PRICE PRICE 135 Furnish and install cold Linear QUANTITY QUANTITIES INCREASE DECREASE PRICE weather covering, 1 -layer Feet 10 10.00 $54.00 PRICE PRICE 2034 visquine, complete as Square specified Yards 3,750 0.00 - 3,750.00 $0.01 ($37.50) 136 Furnish and install cold Feet 20 20.00 $58.00 2036 weather covering, 2 -layer visquine, complete as Square specified Yards 3,750 O.OD - 3,750.00 $0.01 ($37.50 137 Furnish and install cold weather covering, 2-layer Linear visquine and 6" hay, Square 2,000 1,892.30 - 107.70 $42,50 ($4,577.25) 2048 complete asspecified Yards 3,750 0.00 - 3,750.00 $0.01 ($37.50) SECTION I - (SID ITEMS 900 -137) - SUB- TOTALS $10,663.29 ($62,441.83) NET DECREASE TO: SECTION 1 ($51,878.64) SECTION 11 - STORM SEWER 2014 Utility line opening, INCREASE IN DECREASE IN ITEM complete as specified Each BID INSTALLED NET NET UNIT 2030 DESCRIPTION UNIT CONTRACT CONTRACT NUMBER sewer, complete as Linear QUANTITY QUANTITIES INCREASE DECREASE PRICE specified Feet 10 10.00 $54.00 PRICE PRICE 2014 Utility line opening, complete as specified Each 5 5.00 $860.00 2030 Furnish and install 6" storm sewer, complete as Linear specified Feet 10 10.00 $54.00 2034 Furnish and install 10" storm sewer, complete as Linear specified Feet 20 20.00 $58.00 2036 Furnish and install 12" storm sewer, complete as Linear specified Feet 1,050 1,018.90 -31.10 $4150 ($1,352.85) 2042 Furnish and install 15" storm sewer, complete as Linear specified Feet 2,000 1,892.30 - 107.70 $42,50 ($4,577.25) 2048 Furnish and install 18" storm sewer, complete as Linear specified Feet 1,225 1,206.40 - 18.60 $46.50 $864.90) 2054 Furnish and install 21" storm sewer, complete as Linear specified Feet 250 231.50 -18.50 $53.00 ($980.50) 2060 Furnish and install 24" storm sewer, complete as Linear specified Feet 575 524.90 -50.90 $59.00 ($3,003.10) 2072 Furnish and install 30" storm sewer, complete as Linear specified Feet 220 209.40 -10.60 $69.50 ($736.70) -2074 Furnish and install 30" RCP Class III storm sewer, Linear complete as specified Feet 25 29.00 4.00 $84.50 $338.00 2078 Furnish and install 36" storm sewer, complete as Linear specified I Feet 460 440.80 -19.20 $84.50 ($1,622.40) Page 3 of 9 CONTRACT: 11 -07 CHANGE ORDER # 1 (FINALS) ITEM BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 2128 Furnish and install 24" x 38" HERCP Class III storm sewer, complete as Linear specified Feet 400 384.70 - 15.30 $94.00 $1,438.20) 2280 Furnish and install 6" storm lateral, complete as Linear specified Feet 3,000 2,830.40 - 169.60 $37.50 $6,360.00) 2284 Furnish and install storm sewer marker balls, complete as specified Each 214 204.00 -10.00 $17.75 ($177.50 2286 Furnish & install clay dams, complete as specified Each 108 106.00 -2.00 $29.00 ($58 .00 2532 Furnish and install standard storm manhole (4' diameter), complete as Vertical specified Feet 145 131.68 -13.32 $244.00 ($3,250.08) 2534 Furnish and install standard storm manhole (5' diameter), complete as Vertical specified Feet 33 32.78 -0.22 $391.00 ($86.02) 2536 Furnish and install standard storm manhole (6' diameter), complete as Vertical specified Feet 5 4.20 -0.80 $473.00 ($378.40) 2612 Furnish and install Type 1 inlet, complete as specified Each 4 4.00 $1,383.00 2614 Furnish and install Type 3 inlet (with 18" sump), complete as specified Each 53 55.00 2,00 $1,476.00 $2,952.00 2800 Connect to existing storm sewer, complete as specified Each 8 7.00 1 -1.00 $783.00 ($783.00 2802 Connect to existing storm lateral, complete as specified Each 23 1.00 -22.00 $249.00 ($5,478.00) 2806 Connect to existing manhole, complete as specified Each 8 9.00 1.00 $578.00 $578.00 2808 Connect to existing inlet, complete as specified Each 2 2.00 $578.00 2820 Abandon 8" - 12" storm sewer, complete as Linear specified Feet 3,610 3,640.20 30.20 $1.00 $30.20 2824 Abandon storm manholes and inlets, complete as specified Each 26 30,00 4.00 $231.00 $924.00 2856 Furnish, install, maintain, and remove Type D inlet protection, complete as specified Each 174 117.00 -57.00 $65.00 ($3,705.00) 2862 Furnish, install, maintain, and remove stone bag, complete as specified Each 50 15.00 _35.00T $10.00 ($350.00) SECTION II - (BID ITEMS 2014 - 2862) - SUB- TOTALS $4,822,20 ($35,201.90) Page 4 of 9 CONTRACT; 11 -07 CHANGE ORDER # 1 (FINALS) ITEM Additional labor, matreials, BID INSTALLED NET NET UNIT INCREASE IN DEGREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT GONTRACT and reset storm inlet 8 -62, Feet 3,675 3,585.20 -89.80 $52.00 PRICE PRICE ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION II ITEM Additional labor, matreials, BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT and reset storm inlet 8 -62, Feet 3,675 3,585.20 -89.80 $52.00 PRICE PRICE 20000 Additional labor, matreials, BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER and equipment to move UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT and reset storm inlet 8 -62, Feet 3,675 3,585.20 -89.80 $52.00 PRICE PRICE 3004 per Invoice 11- 591 -02, dated 8/30111, complete as Lump specified Sum 0.00 1 1.00 1.00 -24.50 $1,054.65 1 $1,054.65 ($2,621.50 ADDITIONAL WORK: C.O. # 4 - (ITEM 20000) - SUB -TOTAL $1,054.65 $0.00 NET DECREASE TO; SECTION It ($29,325.05) SECTION III - SANITARY SEWER ITEM Furnish and install 8" BID INSTALLED NET NET UNIT INCREASEIN DECREASEIN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT complete as specified Feet 3,675 3,585.20 -89.80 $52.00 PRICE PRICE 3000 Furnish and install 8" sanitary sewer relay, Linear complete as specified Feet 3,675 3,585.20 -89.80 $52.00 $4,669.60) 3004 Furnish and install 12" sanitary sewer relay, Linear complete as specified Feet 250 225.50 -24.50 $107.00 ($2,621.50 3064 Furnish and install 12 -inch sanitary sewer drop, Vertical complete as specified Feet 1 7 6.81 -0.19 $446.00 ($84.74 3100 Furnish and install standard sanitary manhole (4' diameter), complete as Vertical specified Feet 140 131.31 -8.69 $208.00 ($1,807.52) 3114 Furnish and install external manhole chimney seal, complete as specified Each 16 16.00 $457.00 3210 Furnish and install 8" x 6" factory wyes or tees, complete as specified Each 95 90.00 -5.00 $85.00 ($425.00) 3214 Furnish and install 12" x 6" factory wyes or tees, complete as specified Each 10 9.00 -1.00 $183.00 ($183.00) 3234 Furnish and install 476" sanitary lateral relay, Linear complete as specified Feet 3,000 2,703.10 - 296.90 $69.00 ($20,486.10) 3236 Furnish and install sanitary lateral marker balls, complete as specified Each 205 202.00 -3.00 $18.00 $54.00) Page 5 of 9 CONTRACT: 11 -07 CHANGE ORDER # 1 (FINALS) ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT DECREASE IN CONTRACT NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 3238 Furnish and install clay PRICE PRICE dams, complete as Each 0.00 6.00 6.00 $420.00 $2,520.00 specified Each 105 99.00 - 6.00 $57.00 ($342.00 3300 Furnish and install connections to existing 8" mains, complete as specified Each 1 1.00 $600.00 3302 Furnish and install connections to existing 10" mains, complete as specified Each 1 1.00 $612,00 3304 Furnish and install connections to existing 12" mains, complete as specified Each 3 3.00 $1,107.00 3330 Furnish and install concrete collars, complete as specified Each 2 0.00 -2.00 $568.00 ($1,136A0} 3332 Core into existing manhole, complete as specified Each 1 0.00 -1.00 $657.00 ($657.00) 3700 Televise sanitary sewer, Linear complete as specified Feet 3,925 3,810.70 - 114.30 $1.15 ($131.45 3800 Abandon sanitary manholes, complete as specified Each 24 27.00 3.00 $289.00 $867.00 3802 Abandon 8" sanitary sewer, Linear complete as specified Feet 2,650 2,700.00 50,00 $0.60 $30.00 3806 Abandon 12" sanitary sewer, complete as Linear specified Feet 1,575 2,064.00 489.00 $1.20 $586.80 SECTION III - (BID ITEMS 3000 - 3806 ) - SUB - TOTALS $1,483.80 ($32,597.91) ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION III ITEM Furnish and install external 810 INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT complete as specified PRICE PRICE 3116 Furnish and install external chimney seal extension, complete as specified Each 0.00 6.00 6.00 $420.00 $2,520.00 ADDiT jONAL WVKK: C. 0. # 7 - (ITEM 3116) - SUB -TOTAL $2,520.00 $0.00 NET DECREASE TO: SECTION III ($28,594.11) Page 6 of 9 CONTRACT: 11 -07 CHANGE ORDER # 1 (FINALS) ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER ductile iron watermain with QUANTIFY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT poly wrap relay, complete Linear PRICE PRICE J641 IViV IV - YVA I CK MAiN ITEM DESCRIPTION UNIT 81D INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER ductile iron watermain with QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT poly wrap relay, complete Linear PRICE PRICE 4000 Furnish and install 4' ductile iron watermain with poly wrap relay, complete Linear as specified Feet 35 32.00 - 3.00 $73.50 ($220.50) 4002 Furnish and install 6" ductile iron watermain with poly wrap relay, complete Linear as specified Feet 180 161.00 - 19.00 $132.00 ($2,508.00) 4004 Furnish and install 8" ductile iron watermain with poly wrap relay, complete Linear as specified Feet 3,300 3,305.00 5.00 $63.50 $317.50 4006 Furnish & install 10° ductile iron watermain with poly wrap relay, complete as linear specified Feet 215 215.00 $85.00 4036 Furnish and install 1" water service relay, complete as Linear spec ie Feet 1,975 2,198,50 223.50 $43.50 $9,722.25 4038 Furnish and install 1 %' water service relay, Linear complete as specified Feet 16 0.00 -16.00 $62.00 ($992.00 4048 Furnish and install 1° corporation and stop box, complete as specified Each 72 99.00 27.00 $259,00 $6,993.00 4050 Furnish and install 1 %" corporation and stop box, complete as specified Each 1 1.00 $518.00 4054 Furnish and install water service clay dams, complete as specified Each 73 100.00 27.00 $29.00 $783.00 4056 Furnish and install connections to existing 4" watermain, complete as specified Each 2 2.00 $1,283.00 4058 Furnish and install connections to existing 6" watermain, complete as specified Each 10 10.00 $1,332.00 4060 Furnish and install connections to existing 8" watermain, complete as specified Each 6 6.00 $1,385.00 4062 Furnish & install connections to existing 10" watermain, complete as specified Each 1 1.00 $1,490.00 4109 Furnish and install 8" X 4" tee, complete as specified Each 1 1.00 $299.00 Page 7of9 CONTRACT: 11 -07 CHANGE ORDER # 1 (FINALS) ITEM NUMBER DESCRIPTION UNIT BID QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT DECREASE IN CONTRACT PRICE PRICE 4110 Furnish and install 8" X 6" tee, complete as specified Each 7 8.00 1.00 $327.00 $327.00 4111 Furnish and install 8" X 8" tee, complete as specified Each 1 1.00 $390.00 4119 Furnish & install 10" X 6" tee, complete as specified Each 1 1.00 $495.00 4189 Furnish and install 8" X 8" cross, complete as specified Each 1 1.00 $553.00 4235 Furnish and install 4 -inch 45 degree band, complete as specified Each 2 4.00 2.00 $120.00 $240.00 4236 Furnish and install 6 -inch 45 degree bend, complete as specified Each 18 28.00 10.00 $170.00 $1,700.00 4237 Furnish and install 8 -inch 45 degree bend, complete as specified Each 6 9.00 3.00 $232.00 $696.00 4263 Furnish and install 8" X 4" reducer, complete as specified Each 1 1.00 1 $180.00 4267 Furnish & install 10" X 8" reducer, complete as specified Each 1 1.00 $251.00 4400 f=urnish and install 4° gate valve, complete as specified Each 1 1.00 $882.00 4401 Furnish and install 6" gate valve, complete as specified Each 9 9.00 $1,032.00 4402 Furnish and install 8° gate valve, complete as specified Each 12 10.00 -2.00 $1,426.00 $2,852.00) 4403 Furnish & install 10" gate valve, complete as specified Each 1 1.00 $2,007.00 4500 Furnish and install hydrant, complete as specified Each 9 9.00 $2,885.00 4502 Furnish and install g €adelok for hydrant branches, complete as specified Each 9 0.00 -9.00 $713.00 ($6,417.00) 4900 Abandon watermain on East Custer Avenue, Harrison Street to Broad Street, complete as Lump specified Sum 1 1.00 $2,300.00 4902 Abandon watermain on Eastman Street, New York Avenue to Custer Street, Lump complete as specified Sum 1 1.00 $2,300.00 Page 8of9 CONTRACT: 11 -07 CHANGE ORDER# 1 (FINALS) ITEM NUMBER DESCRIPTION UNIT BID INSTALLED NET NET UNIT INCREASE IN CONTRACT DECREASE 1N CONTRACT NUMBER Furnish and install 8" QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT sleeve, complete as PRICE PRICE 4904 Abandon watermain on Each 0.00 1.00 1.00 $226.51 $226.51 40000 Monroe Street, East Irving Avenue to East Melvin Avenue, complete as Lump specified Sum 1 1.00 $2,300.00 4906 Abandon watermain on East Lincoln Avenue, Monroe Street to CN Railroad tracks, complete Lump as specified Sum 1 1.00 1.00 $1,500.00 $1,236.25 4908 Abandon watermain on East New York Avenue, North Main Street to Jefferson Street, complete Lump as specified Sum 1 1.00 $1,500.00 SECTION IV - (BID ITEMS 4000 - 4908) - SUB - TOTALS ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV $20,778.75 012,989.50) ITEM DESCRIPTION UNIT BID INSTALLED NET NET UNIT I INCREASE 1N DECREASE {N NUMBER Furnish and install 8" QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT sleeve, complete as PRICE PRICE 4264 Furnish and install 8" x 6" reducer, complete as specified Each 0.00 1.00 1.00 $192.00 $192.00 4300 Furnish and install 8" sleeve, complete as specified Each 0.00 1.00 1.00 $226.51 $226.51 40000 Additional labor, materials, and equipment to fix a leaking joint on existing 8" water main in the intersection of Custer Avenue and Grand Street, per Invoice 11- 591 -01, dated 7127/11, complete as Lump specified Sum 0.00 1.00 1.00 $1,236.25 $1,236.25 ADDITIONAL WORK: c.o. # 1 (ITEMS 4264 - 40000) - SUB -TOTAL NET INCREASE TO: SECTION IV $1,654.76 $0.00 $9,444.01 NET INCREASE TO SECTIONS I, II, Ill, IV $42,877.45 NET DECREASE TO SECTIONS I, 11, Ill, IV ($143,231.14) NET DECREASE TO CONTRACT: ($100,353.69) Page 9 of 9