Loading...
HomeMy WebLinkAbout0108528-Building (patio)(~ CITY OF OSHKOSH OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1545 #117 ARBORETUM DR Owner PATRICIA K HOEHNE Designer Contractor RMKE LLC Category 142 - Decks, Patios, Ramps No 108528 Create Date 06/07/2004 Plan Type 10 Building ~ Sign ~ Canopy ~ Fence ~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. ~ Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation O Poured Concrete ~ Floating Slab ~ Pier ~ Other ~ Concrete Block ~ Post ~ Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Replace patio. *Note: Verification of structural adequacy must be provided if this patio is ever enclosed with a building addtion. Compliance of Work ~vith handicap access standards must be provided when the need is demonstrated. HVAC Contractor Electric Contractor Fees: Valuation Issued By: Plumbing Contractor $9,000.00 Plan Approval $0.00 Permit Fee Paid Permit Voided $68.00 Park Dedication $0.00 Date 06/07/2004 Final/O.P. 00/00/0000 Parcel Id # 1223100000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 3025 HEISE RD OMRO WI 54963 - 0000 Telephone Number 920-685-6946 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.