HomeMy WebLinkAbout0119155-Building (concrete ramp)
(~.
OSHKOSH
ON THE WATER
Job Address 1250 ARDMORE TRL
CITY OF OSHKOSH
No
119155
BUILDING PERMIT - APPLICATION AND RECORD
Owner ROBERT COlEN
Create Date
04/27/2006
Designer
Contractor
ALL-WAYS CONCRETE LLC
Category
142 - Decks, Patios, Ramps
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst:
Size
Unfinished/Basement - Sq, Ft. Rooms Height
Finished/Living - Sq. Ft. Bedrooms Stories
Garage - Sq, Ft. Baths
Ft.
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Flood Plain -
# Dwelling Units 0
Height Permit
Occupancy Permit
~-
Park Dedication
# Structures
~
Use/Nature SFRI Constructing a concrete ramp in front of the house. The ramp wili have landscaping in front of it to lessen the visual impact in the
ofWork rant yard.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
~p
$1,500.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Fees: Valuation
Date 04/27/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1313930000
in the performance of this work I agree to perform ali work pursuant to rules goveming the described construction,
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvais before starting such activity.
Signature
Date
Address 512 SPRUCE ST
Agent/Owner
OMRO
WI 54963 - 0000
Telephone Number
685-5715
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.