Loading...
HomeMy WebLinkAbout0126030-Building (deck/ramp) - .. OSHKOSH ON THE WATER Job Address 1837 ARIZONA ST CITY OF OSHKOSH No 126030 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES R SCHNEIDER________ Create Date 08/01/2007 Designer Contractor QUALITY 1ST CONST Category 142 - Decks, Patios, Ramps Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D ProjectioJ1j Finished/Living Bedrooms Stories Canopies Garage Baths -------------r- Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block . Post o Pier 0 Other o Treated Wood Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI 8' x 13' deck and ramp* off the rear of the house. 8" piers spced 4' apart with 2' cantilever. and a 6' high privacy fence in the Sid~ of Work ard I I Plumbing Contractor HV AC Contractor Electric Contractor Fees: Valuation __$4,800.00 Plan Approval $0.00 Permit Fee Paid $53.00 Park Dedication $0.00 Issued By: '?[ Date 08/01/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1405250000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit applic tion within an easeme t, the City strongly urges the permit ap.PIi~ contact the easement holder(s) and to secure ny n cessary ap rova b re starting su ctivity. C e (( . ~. Signature ~ r... - Date I 07 gent/Owner Address Osh~~___ yy~ 54~QL - OOO~__ Telephone Number 231-569~______ To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.