Loading...
HomeMy WebLinkAbout0127038-Building (driveway) <ke~ OSHKOSH ON THE WATER Job Address 1837 ARIZONA ST CITY OF OSHKOSH No 127038 BUILDING PERMIT - APPLICATION AND RECORD Owner JAMES R SCHNEIDER Create Date 10/02/2007 Designer Contractor BILL'S CONSTRUCTION Category 256 - Parking Lots, Driveways Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation o Poured Concrete . Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Occupancy Fee $0.00 Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature SFRI Paving a portion of the driveway* (approx 7' x 24') that is currently grass. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 $1,250.00 Plan Approval Issued By: ~ Date 10/02/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1405250000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce. easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement :~~::::'d to ""''":'' ,e"""." approv "bel e """9 '"'" .ctiWy. Dale '<21'f1;::' ~7 AgenUOwner Address 1331 EVANS ST OSHKOSH WI 54901 - 0000 Telephone Number 920-303-1160 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final; etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.