HomeMy WebLinkAbout0103658-Building (entry door/steps/porch roof)OSHKOSH
OH THE WATER
Job Address 1823 ASHLAND ST
Designer
Category
Type
Zoning
141 - Exterior Remodeling
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner BETH A BAERWALD
Contractor OWNER
· Building (~) Sign (~ Canopy (~ Fence O Raze
Unfinished/Basement
Finished/Living
Garage
Foundation
No 103658
Occupancy Permit
Park Dedication
Create Date 08/22/2003
Plan
Class of Const: Size
0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection
0 Sq. Ft. Bedrooms 0 Stories Canopies __
0 Sq. Ft. Baths 0 Signs
(~) Poured Concrete (~) Floating Slab · Pier O Other
(~) Concrete Block O Post O Treated Wood
Not Required Flood Plain __ Height Permit
# Dwelling Units 0 # Structures 0
0
0
Use/Nature ~FR/Replace front entrance door with compliant entrance/exit door, install 4x4 landing with steps to grade and install a porch roof over
of Work ~ew landing.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By:
Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided ~
$25.00 Park Dedication $0.00
Date 08/22/2003 FieallO. P. 00/00/0000
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature'-~~~J~ Date ~'[,2E~ ' ~2~-~ ~:;~ 0 0 ~)
Agent/Owner
Address 1823 ASHLAND ST OSHKOSH WI 54901 - 2301 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.