HomeMy WebLinkAbout11-559 DECEMBER 27, 2011 11-559 RESOLUTION (CARRIED___6-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVAL OF CHANGE ORDER NO. 1 FOR PUBLIC WORKS CONTRACT NO. 11-06 WITH FISCHER-ULMAN CONSTRUCTION, INC. FOR CONCRETE SIDEWALK (NEW & RECONSTRUCTION) (-$8,612.02) INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: FISCHER-ULMAN CONSTRUCTION, INC. 1115 S. Theodore Street Appleton, WI 54915 Net Decrease to Contract: $8,612.02 PURPOSE: See attached Change Order. OJHKO�IH ON THE WA ER MEMORANDUM TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde,Assistant Director of Public Works DATE: December 21, 2011 RE: Change Order#1 for Public Works Contract No. 11-06 for Fischer-Ulman Construction Inc. for Concrete Sidewalk(Rehab&New)(-$8,612.02) BACKGROUND Change Order#1 for Contract 11-06 is scheduled for consideration by the Common Council at the December 27, 2011 meeting. The contract was originally awarded to Fisher-Ulman Construction Inc, of Appleton, Wisconsin in March of 2011. This change order is for additional services provided and for final quantities. ANALYSIS All work on the project has been completed and final quantities measured. Sidewalk installation along 9th Avenue west of Oakwood Road was removed from the contract due to delays in obtaining additional right-of- way. Additional street patches were also added to the contract. FISCAL IMPACT Funding for the project is in the 2011 Capital Improvement Program Sidewalk Section and in the Water Utility Operating Budget. Budget Section Funding New Construction Costs w/ Engr. CIP-Sidewalk $542,000 $452,200 Water Utility Operating/Street Patch (see Note) $126,700 $126,700 CIP—Street (see Note) $15,400 $15,400 Totals $684,100 $594,300 Note: Water Utility Operating Budget contains$675,000 for maintenance of Mains and Services. Only the amount needed for repairing concrete pavement is shown as the funds are used for all maintenance items. Additional street patches were added to the contract. This will be funded from available funds in the Street section of the 2011 CIP. RECOMMENDATIONS I recommend approval of the Change Order#1 to Contact No. 11-06 in the amount of-$8,612.02 to Fischer- Ulman Construction Inc. Re ectfully Submitted, Approved: 1-Y10-lac- Steven M. Gohde Asst. Director of Public Works City Manager SMG/tlt Attachment: Change Order No. 1 I:\Engineering\I 1-06 Concrete Sidewalk-Rehab&New\Project_Information\Correspondence\Memo111-06 Memo for CO#1_12-21-I I.doc CHANGE ORDER# 1 DATED: December 13, 2011 TO: Fischer-Ulman Construction Inc. 1115 S Theodore St Appleton WI 54915 Your present contract with the City of Oshkosh, Contract No. 11-06 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I -CONCRETE SIDEWALK $8,867.98 NET DECREASE TO: SECTION II -STORM SEWER ($17,480.00) NET DECREASE TO CONTRACT: ($8,612.02) CITY OF OSHKOSH BY: Recommended: City Manager Director of Public Works City Clerk Approved and accepted: Cont'-ctor F r LLt r-n ,,,, C-CA-1 c- c-h m I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Comptroller Approved as to form: City Attorney CONTRACT 11-06 CHANGE ORDER#1 SECTION I-CONCRETE SIDEWALK ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 100 Mobilization&construction of temporary access for W. 9th Avenue sidewalk construction,complete as Lump specified Sum 1 0.00 -1.00 $1,500.00 ($1,500.00) 101 Sidewalk removal& driveway removal, complete as specified Square Feet 90,500 118,004.88 27,504.88 $0.43 $11,827.10 102 Concrete/asphalt sawing, complete as specified Linear Feet 5,500 5,334.10 -165.90 $2.00 ($331.80) 103 Construct 4"thick concrete sidewalk in various locations in the City of Oshkosh, complete as Square specified Feet 97,100 94,167.63 -2,932.37 $2.89 ($8,474.55) 104 Construct 6"thick concrete sidewalk in various locations in the City of Oshkosh,complete as Square specified Feet 14,500 18,046.81 3,546.81 $3.17 $11,243.39 105 Construct 7"thick crosswalk areas, complete Square as specified Feet 3,000 3,240.78 240.78 $3.30 $794.57 106 Provide and install metal detectable warning plates, Square complete as specified Feet 216 288.00 72.00 $25.00 $1,800.00 107 Three(3")inch asphalt replacement, complete as Square specified Feet 1,500 1,047.00 -453.00 $3.70 ($1,676.10) 108 Curb and gutter removal, Linear complete as specified Feet 300 363.40 63.40 $3.00 $190.20 109 Construct 30"curb and gutter, complete as Linear specified Feet 300 396.80 96.80 $18.80 $1,819.84 110 Terrace restoration, including seed,fertilizer, and mulch,complete as Square specified Yards 2,750 344.03 -2,405.97 $4.00 ($9,623.88) 111 Furnish and install pavement ties,complete as specified Each 100 105.00 5.00 $5.00 $25.00 112 Construct 4"thick concrete sidewalk in Water Dept. repair locations at approx. 60 sites,complete as specified Square Feet _ 1,500 1,473.38 -26.62 $4.15_ ($110.47) Page 1 of 5 CONTRACT 11-06 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 113 Construct 6"thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified Square Feet 500 914.14 414.14 $4.30 $1,780.80 114 T'non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Yards 75 0.00 -75.00 $41.40 ($3,105.00) 115 8'non-reinforced concrete pavement removal and replacement,including sawing, pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Yards 1,750 182.89 -1,567.11 $42.15 ($66,053.69) 116 8'special High Early Strength, non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading,terracing and traffic control, Square complete as specified Yards 100 20.63 -79.37 $48.50 ($3,849.45) 117 Extra crushed stone base, complete as specified Tons 300 27.00 -273.00 $13.00 ($3,549.00) 118 No.4 epoxy-coated reinforcement rods, installed as specified Linear Feet 520 1,700.00 1,180.00 $1.50 $1,770.00 119 Construct 12"wide radius curb head,complete as Linear specified Feet 75 60.00 -15.00 $4.00 ($60.00) 120 Furnish, install,and maintain erosion mat, Square complete as specified Yards 2,500 0.00 -2,500.00 $1.10 ($2,750.00) 121 Profile sawcut concrete curb, complete as specified Linear Feet 50 0.00 -50.00 $26.00 ($1,300.00) 122 Sidewalk curb,complete as Linear specified Feet 40 0.00 -40.00 $40.00 ($1,600.00) 123 Adjust manholes and inlets, complete as specified Each 2 0.00 -2.00 $200.00 ($400.00) 124 Remove trees and stumps, complete as specified Inch Diameter 92 0.00 -92.00 $12.00 ($1,104.00) SECTION I-(BID ITEMS 100-124)-SUB-TOTALS $31,250.90 ($105,487.94) Page 2 of 5 CONTRACT 11-06 CHANGE ORDER#1 ADDITIONAL WORK REQUIRED: C.O.#1 -SECTION I ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT CONTRACT PRICE PRICE 125 7"R-bag non-reinforced concrete removal& replacement, including sawing,pavement ties, intregral curb&grading, terracing&traffic control, Square complete as specified Yards 0.00 74.23 74.23 $43.60 $3,236.43 126 718-bag non-reinforced concrete removal& replacement,including sawing, pavement ties, intregral curb&grading, terracing&traffic control, Square complete as specified Yards 0.00 0.00 $45.80 127 8"/7-bag non-reinforced concrete removal& replacement, including sawing, pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Yards 0.00 1,222.96 1,222.96 $45.25 $55,338.94 128 8'/8-bag non-reinforced concrete removal& replacement,including sawing,pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Yards 0.00 125.23 125.23 $46.04 $5,765.59 129 9'/7-bag non-reinforced concrete removal& replacement,including sawing, pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Yards 0.00 157.30 157.30 $47.60 $7,487.48 130 9"/8-bag non-reinforced concrete removal& replacement,including sawing, pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Yards 0.00 100.37 100.37 $49.82 $5,000.43 131 7"/6-bag non-reinforced concrete removal& replacement, including sawing, pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Feet 0.00 533.61 533.61 $4.78 $2,550.66 Page 3 of 5 • CONTRACT 11-06 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 132 8"/9-bag non-reinforced concrete removal& replacement, including sawing, pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Feet 0.00 84.00 84.00 $5.72 $480.48 133 Adjust Manhole,complete as specified Each 0.00 1.00 1.00 $100.00 $100.00 134 Repair Water Patch, complete as specified Each 0.00 1.00 1.00 $50.00 $50.00 135 5"/7-bag non-reinforced concrete removal& replacement, including sawing,pavement ties, integral curb&grading, terracing&traffic control, Square complete as specified Feet 0.00 226.24 226.24 $4.84 $1,095.00 136 Sign Usage for Jackson Street bridge pavement repair Each 0.00 1.00 1.00 $2,000.00 $2,000.00 ADDITIONAL WORK: C.O.#1 -(ITEMS 125-136)-SUB-TOTAL $83,105.02 $0.00 NET INCREASE TO: SECTION I $8,867.98 SECTION II-STORM SEWER ITEM BID INSTALLED NET NET UNIT INCREASEIN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2032 Furnish and install 8"Storm Sewer, complete as Linear specified Feet 6.00 0.00 -6.00 $45.00 ($270.00) 2036 Furnish and install 12" Storm Sewer with endwalls, complete as specified Linear Feet 60.00 0.00 -60.00 $48.00 ($2,880.00) 2042 Furnish and install 15" Storm Sewer with endwalls, complete as specified Linear Feet 60.00 0.00 -60.00 $55.00 ($3,300.00) 2300 Furnish and install 12"RCP Class Ill apron end walls with joint ties,complete as specified Each 6.00 0.00 -6.00 $650.00 ($3,900.00) 2302 Furnish and install 15" RCP Class Ill apron end walls with joint ties,complete as specified Each 4.00 0.00 -4.00 $700.00 ($2,800.00) Page 4 of 5 • CONTRACT 11-06 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2532 Furnish and install Std. Storm Manhole(4'inside diameter)in one location with casting,complete as specified Each 1.00_ 0.00 -1.00 $1,750.00 ($1,750.00) 2610 Furnish and install Type I Inlet/with sump in one location with casting, complete as specified Each 1.00 0.00 -1.00 $1,300.00 ($1,300.00) 2854 Furnish, install, and maintain Type"C"inlet protection, complete as specified Each 5.00 0.00 -5.00 $40.00 _ ($200.00) 2856 Furnish, install, and maintain Type"D"inlet protection std., complete as specified Each 74.00 67.00 -7.00 $40.00 ($280.00) 2868 Furnish, install,and maintain ditch checks, complete as specified Each 0.00 -8.00 $100.00_ ($800.00) SECTION II-(BID ITEMS 2032-2868)-SUB-TOTALS $0.00 ($17,480.00) NET DECREASE TO: SECTION II ($17,480.00) NET INCREASE TO SECTIONS I&II $114,355.92 NET DECREASE TO SECTIONS I&II ($122,967.94) NET DECREASE TO CONTRACT: ($8,612.02) Page 5 of 5