Loading...
HomeMy WebLinkAboutPW CNT 11-08/CNG 1 (Stone Creek Cont) DEPARTMENT OF PUBLIC WORKS 215 Church Avenue P.O.Box 1130 (141/1- Oshkosh,Wisconsin 54903-1130 Ph. (920)236-5065 OfHKOJ Fax(920)236-5068 ON THE WATER December 14, 2011 Ms. Stacey Fett Stone Creek Contractors, LLC E1664 Canyon Creek Lane Luxemburg, WI 54217 Re: Change Order No. 1 Contract 11-08 Dear Ms. Fett: Enclosed is an executed copy of Change Order No. 1 between the City of Oshkosh and Stone Creek Contractors, LLC regarding the above-mentioned contract. If you have any questions, please call our office at (920) 236-5065. Sincerely, Datiocc: David C. Patek Director of Public Works DC Pit It Enclosure: Change Order No. 1 cc: Pam Ubrig, City Clerk (w/original) Lynn Lorenson, City Attorney (w/copy) File (w/original) I:AEngineeringV11-08 Hughes Si-Glatt Crk Culvert Repla ceAProject_InlormatlonAContract IttIoVCHANGE ORDERS VI I-08 Page 1 of I Executed Change Order 111 Letter_I 2-14-I Ldoc CHANGE ORDER# 1 DATED: November 30, 2011 TO: Stone Creek Contractors, LLC FINAL E1664 Canyon Creek Lane Luxemburg, WI 54217 Your present contract with the City of Oshkosh, Contract No. 11-08 , is hereby amended and changed as follows: NET INCREASE TO: SECTION I - CONCRETE PAVING $2,119.65 NET DECREASE TO: SECTION II -STORM SEWER ($1,863.20) NET INCREASE TO CONTRACT: $256.45 CITY OF OSHKOSH BY: c _ Recommended: City Manager Director of Public Works • A_ . A- t Ch App ved and cepted: ontractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. / , -e--(2 Conitroller Appr 1ved as to form. City AttoT CONTRACT: 11-08 CHANGE ORDER#1 SECTION I-CONCRETE PAVING ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 1000 Saw cutting,complete as Linear specified Feet 48.00 48.00 $4.00 1010 Pavement removal, Square complete as specified Yards 240.00 270.00 30.00 $4.45 $133.50 1020 Furnish and install gravel Linear shoulder restoration, Feet complete as specified 202.00 202.00 $5.50 1030 8"non-reinforced concrete Square pavement, HES,including Yards 5"aggregate base and grading,complete as specified 240.00 247.50 7.50 $74.70 $560.25 1040 Furnish and install Each pavement ties(epoxy coated),complete as specified 16.00 18.00 2.00 $12.00 $24.00 1050 Furnish and install cold Square weather covering, 1-layer Yards visquine,complete as specified 240.00 247.50 7.50 $1.00 $7.50 1060 Furnish and install cold Square weather covering,2-layer Yards visquine,complete as specified 240.00 0.00 -240.00 $1.50 ($360.00) 1070 Furnish and install cold Square weather covering,2-layer Yards visquine and 6"hay, complete as specified 240.00 0.00 -240.00 $2.00 ($480.00) 1080 Asphaltic concrete Tons pavement, complete as specified 44.00 65.28 21.28 $105.00 $2,234.40 SECTION I-(BID ITEMS 1000-1080)-SUB-TOTALS $2,959.65 ($840.00) NET INCREASE TO: SECTION I $2,119.65 SECTION II-STORM SEWER ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2014 Remove culverts,complete Lump as specified Sum 1.00 1.00 $10,000.00 2270 Furnish and install 5'x 12' Lump CONSPAN Bridge System, Sum complete as specified 1.00 1.00 $137,000.00 2900 Furnish and install topsoil Square 6"depth,complete as Yards specified 336.00 336.00 $4.00 Page 1 of 2 CONTRACT: 11-08 CHANGE ORDER#1 ITEM BID INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT CONTRACT CONTRACT QUANTITY QUANTITIES INCREASE DECREASE PRICE PRICE PRICE 2920 Furnish and install turf Square grass,complete as Yards specified 336.00 336.00 $4.00 2932 Furnish and install Class I, Square Urban,Type A erosion Yards control mat,complete as specified 58.00 58.00 $9.00 2934 Furnish and install Class II, Square Type B erosion control Mat, Yards complete as specified 278.00 278.00 $7.00 2944 Furnish and install light rip- Square rap with filter fabric, Yards complete as specified 230.00 237.60 7.60 $18.00 $136.80 2960 Rock excavation,complete Cubic as specified Yards 20.00 0.00 -20.00 $100.00 ($2,000.00) 2970 Structural fill for concrete Cubic footings,complete as Yards specified 20.00 20.00 $25.00 SECTION II-(BID ITEMS 2014-2970)-SUB-TOTALS $136.80 ($2,000.00) NET DECREASE TO: SECTION II ($1,863.20) NET INCREASE TO SECTIONS I,II $3,096.45 NET DECREASE TO SECTIONS I,II ($2,840.00) NET INCREASE TO CONTRACT: $256.45 Page 2 of 2